My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 41 <br /> IL DRAFT MITIGATED NEGATIVE DECLARATION <br /> Project Name: Rocketship Redwood City Elementary School Project <br /> Project Location: The approximately 1.12-acre project site is located at 860 Charter Street in <br /> Redwood City and unincorporated San Mateo County and is generally bounded by Bay Road to the <br /> north,existing light industrial and commercial uses to the east and south,and Charter Street to the <br /> west. <br /> Description of Project: The existing project site is comprised of two immediately contiguous parcels <br /> of land,one of which is located within the City of Redwood City and the other of which is located <br /> within the County of San Mateo. The site is currently developed with an approximately 23,200- <br /> square-foot,one-story warehouse structure within the City boundaries and an associated surface <br /> parking lot and metal storage shed within the County boundaries. <br /> The project sponsor(Launchpad Development Fifteen LLC/Rocketship Education)proposes to <br /> convert the site into a public TK-5 charter elementary school,which would be operated by <br /> Rocketship Education. Associated improvements include new landscaping and playground areas and <br /> modifications to existing site access,circulation and parking. The proposed school would have a <br /> maximum enrollment of 480 students when it is fully operational. <br /> The proposed project also includes installation and operation of an active sub-slab depressurization <br /> system to eliminate the exposure pathway between contaminated soil vapors and indoor air sensitive <br /> receptors and inhibit soil gases from flowing into the building,thereby ensuring that indoor air <br /> concentrations of VOCs related to the underlying subsurface conditions are reduced to an acceptable <br /> level. Operation of this system would be conducted under DTSC oversight. <br /> Findings: It is hereby determined that,based on the information contained in the attached Initial <br /> Study,the project would not have a significant adverse effect on the environment. <br /> Mitigation measures necessary to avoid or reduce the project's potentially significant effects to a less- <br /> than-significant level on the environment and are detailed on the following pages. These mitigation <br /> measures are hereby incorporated and fully made part of this Draft Mitigated Negative Declaration. <br /> The project sponsor has hereby agreed to incorporate as part of the project and implement each of <br /> these identified mitigation measures,which would be adopted as part of the Mitigation Monitoring <br /> and Reporting Program. <br /> September 30,2016 <br /> Date sa Costa Sanders,Planner <br /> P:\RWC1401B Rocketship Schwl\PRODUCrSUS-MNDT&Iic\Rocketship Public Review 09-29-16.do—(09/29/16)PUBLIC REVIEW DRAFT 17 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 25 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.