Laserfiche WebLink
7.A. - Page 54 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> Table 1: Project Construction Exhaust Emissions in Pounds Per Da <br /> Project Construction ROG NOg Exhaust PMZ,5 Exhaust PM10 <br /> Avera e Daily Exhaust Emissions 11.1 30.0 1.9 2.0 <br /> BAAQMD Thresholds 54.0 54.0 54.0 82.0 <br /> Exceed Threshold? No No No No <br /> Source: LSA Associates,Inc.,2014. <br /> As shown in Table 1,exhaust emissions would be below the BAAQMD thresholds; however,the <br /> BAAQMD requires that all projects implement best management practices to reduce construction <br /> fugitive dust impacts(which are not quantified in Table 1)to a less-than-significant level.With <br /> implementation of the following mitigation measure,which would reduce fugitive dust emissions as <br /> well as further reduce exhaust emissions,construction of the proposed project would not substantially <br /> contribute to an air quality violation and this impact would be less than significant. <br /> Mitigation Measure AIR-1: The following construction practices shall be implemented at the <br /> project site during construction of the project: <br /> • All exposed surfaces(e.g.,parking areas, staging areas, soil piles,graded areas,and <br /> unpaved access roads) shall be watered two times per day. <br /> • All haul trucks transporting soil, sand,or other loose material off-site shall be covered. <br /> • All visible mud or dirt track-out onto adjacent public roads shall be removed using wet <br /> power vacuum street sweepers at least once per day. The use of dry power sweeping is <br /> prohibited. <br /> • All vehicle speeds on unpaved roads shall be limited to 15 miles per hour(mph). <br /> • All roadways,driveways,and sidewalks to be paved shall be completed as soon as <br /> possible. Building pads shall be laid as soon as possible after grading unless seeding or soil <br /> binders are used. <br /> • Idling times shall be minimized either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes (as required by the California airborne <br /> toxics control measure Title 13, Section 2485 of California Code of Regulations). Clear <br /> signage shall be provided for construction workers at all access points. <br /> • All construction equipment shall be maintained and properly tuned in accordance with <br /> manufacturer's specifications.All equipment shall be checked by a certified mechanic and <br /> determined to be running in proper condition prior to operation. <br /> • Post a publicly visible sign with the telephone number and person to contact at the City of <br /> Redwood City regarding dust complaints. This person shall respond and take corrective <br /> action within 48 hours. <br /> Operational Emissions—Regional Emissions Analysis.Long-term air emission impacts are <br /> those emissions associated with stationary sources and mobile sources. Stationary source emissions <br /> result from the consumption of natural gas and electricity.Mobile source emissions result from <br /> vehicle trips generated by the project and result in air pollutant emissions affecting the entire air <br /> basin. Regional emissions associated with the project's area source and operational source emissions <br /> were calculated using CalEEMod. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 30 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 38 of 124 <br />