Laserfiche WebLink
TA. - Page 97 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> departing from the project site, especially during the demolition and site preparation phase of <br /> construction. <br /> The second type of short-term noise impact is related to the noise generated by heavy equipment <br /> operating on the project site. Construction is performed in discrete steps,each of which has its own <br /> mix of equipment and,consequently,its own noise characteristics. These various sequential phases <br /> would change the character of the noise generated on the site and,therefore,the noise levels <br /> surrounding the site as construction progresses. Despite the variety in the type and size of <br /> construction equipment, similarities in the dominant noise sources and patterns of operation allow <br /> construction-related noise ranges to be categorized by work phase. Table 5 lists typical construction <br /> equipment noise levels recommended for noise impact assessments,based on a distance of 50 feet <br /> between the equipment and a noise receptor. <br /> Demolition and construction activities at the Table 5: Typical Construction Equipment <br /> project site are expected to require the use of Maximum Noise Levels,Lmax <br /> earthmovers such as bulldozers and scrapers, Suggested <br /> loaders and graders,water trucks,and haul Range of Maximum Sound <br /> trucks. As shown in Table 5,the typical Maximum Levels for <br /> Sound Levels Analysis <br /> maximum noise level generated by each Type of Equipment dBA at 50 feet dBA at 50 feet <br /> bulldozer on the project site is assumed to be Pile Drivers 81 to 96 93 <br /> 85 dBA Lmax102 at 50 feet from the operating Rock Drills 83 to 99 96 <br /> earthmover. The maximum noise level Jackhammers 75 to 85 82 <br /> generated by hydraulic backhoes is approxi- Pneumatic Tools 78 to 88 85 <br /> mately 86 dBA L,,,ax at 50 feet. The Pumps 74 to 84 80 <br /> Scrapers 83 to 91 87 <br /> maximum noise level generated by haul Haul Trucks 83 to 94 88 <br /> trucks is approximately 88 dBA Lmax at 50 Cranes 79 to 86 82 <br /> feet from these vehicles operating at full Portable Generators 71 to 87 80 <br /> power.Pile drivers would not be used for Rollers 75 to 82 80 <br /> construction of this project. Dozers 77 to 90 85 <br /> Tractors 77 to 82 80 <br /> Front-End Loaders 77 to 90 86 <br /> Each doubling of the sound sources with Hydraulic Backhoe 81 to 90 86 <br /> equal strength would increase the noise level Hydraulic Excavators 81 to 90 86 <br /> by 3 dBA.Assuming each piece of construe- Graders 79 to 89 86 <br /> tion equipment operates at some distance Air Compressors 76 to 89 86 <br /> apart from the other equipment,the worst- Trucks 81 to 87 86 <br /> case combined noise level at the nearest uses Source: Bolt,Beranek&Newman,1987.Noise Control for <br /> to the site during this phase of construction Buildings and Manufacturing Plants. <br /> would be 91 dBA Lmax at 50 feet from the <br /> operating equipment. The nearest existing sensitive receivers in the vicinity of the project site are the <br /> residences located approximately 400 feet south of the project site.At this distance,construction- <br /> related noise levels from the use of heavy construction equipment would be expected to attenuate to <br /> approximately 73 dBA L,,,ax,which is well below the City's 110 dBA noise ordinance threshold. <br /> Therefore,the project would not result in a significant noise impact related to construction noise. <br /> 102L.is the maximum A-weighted sound levels measured on a sound level meter,during a designated time <br /> interval,using fast time averaging. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 73 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 81 of 124 <br />