My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 126 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> f) Conflict with adopted polices,plans, or programs regarding public transit, bicycle, or <br /> pedestrian facilities, or otherwise decrease the performance or safety of such facilities? (Less- <br /> Than-Significant Impact) <br /> The following includes a discussion of potential impacts to bicycle,pedestrian,and transit systems <br /> within the project area. The project would have a significant impact related to adopted programs, <br /> plans,or policies regarding these facilities if it generated pedestrian,bicycle,or transit travel demand <br /> that could not be accommodated by existing facilities,or those proposed by the project. As discussed, <br /> these impacts would be less than significant. Minor modifications are however recommended to <br /> further ensure that the proposed project would enhance access for alternative modes of transportation <br /> to the project site. Parking is also discussed in this section for informational purposes only. <br /> Bicycle Facilities.Charter Street is designated as a Class III bike route between Broadway and <br /> Bay Road and between Spring Street and Middlefield Road. There are no bicycle lanes in the <br /> immediate vicinity of the project site. Bicycle counts conducted as part of the Traffic Study <br /> demonstrate that during the AM and PM peak periods,bicycle volumes are currently relatively low <br /> (less than 20 bicycles)at the intersections of Spring Street and Charter Street,and at Bay Road and <br /> Douglas Avenue. <br /> Although not designated by the City as bicycle facilities,local roads like Spring Street,Douglas <br /> Street,and Kaynyne Street/Flynn Avenue carry low traffic volumes and are conducive to bicyclists. <br /> The Redwood City General Plan identifies Bay Road,Broadway,and Second and Fifth Avenues as <br /> locations where the community has expressed a desire for future bike routes.However,these <br /> improvements are not yet planned,as further study is needed to assess the feasibility of routes, safety, <br /> and adequate rights-of-way. Likewise,bicycle improvements on Second or Fifth Avenues are not <br /> warranted by this project since the number of bicycle trips on these streets generated by the proposed <br /> project would be quite small given their distance from the project site. <br /> The TDM Program(see Appendix F),which is proposed by the project sponsor and required by <br /> C/CAG(see Section XVLb),would further encourage the use of alternative modes of transportation <br /> including bicycling and provide several bike racks onsite for use by future students and staff. The <br /> existing site plan shows parking for 28 bicycles,which would accommodate about 6 percent of the <br /> total students and staff at the project site. <br /> Implementation of the TDM Program would further enhance bicycle access and facilities on and in <br /> the immediate vicinity of the project site. Even with the additional number of bicyclists using local <br /> roads to access the project site as a result of the project,there would be sufficient capacity on the <br /> various classes of bike facilities as well as bike storage to accommodate the increase. Therefore,the <br /> proposed project would not conflict with adopted plans and policies regarding bicycle facilities. <br /> Pedestrian Facilities.Roadways providing pedestrian access to the proposed project site <br /> include Spring Street,Charter Street,Bay Road,and Douglas Avenue. Sidewalks are provided on <br /> both sides of all streets. The Traffic Study includes an analysis of pedestrian counts on Bay Road at <br /> the intersections with Charter Street and Kaynyne Street,on Spring Street at the intersections with <br /> Charter Street and Kaynyne Street,and at the intersection of Bay Road and Douglas Avenue. During <br /> both the AM and PM peak periods,pedestrians at the intersection at Spring Street and Charter Street <br /> were relatively high,with 80 and 73 pedestrians,respectively. This intersection is traversed by <br /> elementary school children,as it is located near Hoover Elementary School. At all other intersections, <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 102 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 110 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.