My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1: Mitigation Monitoring and Reporting Program D <br /> Timeframefor Responsibility for Oversight of <br /> Impact Miti$ationMeasures Implementation Implementation Implementation <br /> III.AIR QUALITY (DD <br /> The Bay Area Air Quality AIR-1:The following construction practices shall be During all ProjectApplicant Redwood City <br /> ManagementDistrict implemented at the project site during construction of the phases of Community N <br /> (BAAQMD)requires that all project: construction. Development <br /> projects implement best All exposed surfaces(e.g.,parking areas,staging areas, Director <br /> management practices to reduce soil piles,graded areas,and unpaved access roads)shall <br /> construction fugitive dust be watered two times per day. <br /> impacts to a less-than- All haul trucks transporting soil,sand,or other loose <br /> significant level. material off-site shall be covered. <br /> All visible mud or dirt track-out onto adjacent public <br /> roads shall be removed using wet power vacuum street <br /> sweepers at least once per day.The use of dry power <br /> sweeping is prohibited. <br /> All vehicle speeds on unpaved roads shall be limited to <br /> 15 miles per hour(mph). <br /> All roadways,driveways,and sidewalks to be paved <br /> shall be completed as soon as possible.Building pads <br /> shall be laid as soon as possible after grading unless <br /> seeding or soil binders are used. <br /> Idling times shall be minimized either by shutting <br /> equipment off when not in use or reducing the maximum <br /> idling time to 5 minutes(as required by the California <br /> airborne toxics control measure Title 13,Section 2485 of <br /> California Code of Regulations).Clear signage shall be <br /> provided for construction workers at all access points. <br /> All construction equipment shall be maintained and <br /> properly tuned in accordance with manufacturer's <br /> specifications.All equipment shall be checked by a <br /> certified mechanic and determined to be running in <br /> proper condition prior to operation. <br /> Post a publicly visible sign with the telephone number <br /> and person to contact at the City of Redwood City <br /> regarding dust complaints.This person shall respond and <br /> take corrective action within 48 hours. <br /> ATTY/RESO.0084/CC RESO ADOPTING CEOA—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.