Laserfiche WebLink
6.1.A. - Page 65 <br /> Flow-Through Planter Maintenance Plan Date of Inspection: <br /> Property Address: 2075 Broadway Street Treatment Measure No.: <br /> IV. Inspections <br /> The attached Flow-Through Planter Inspection and Maintenance Checklist shall be used to <br /> conduct inspections monthly(or as needed), identify needed maintenance, and record <br /> maintenance that is conducted. <br /> tie��am��e„A3�6MwNm�.z<a Page 3 <br /> ATTY/AGR.2017.203/Lane Partners, LLC-STMMA <br />