Laserfiche WebLink
6.1.A. - Page 67 <br /> Proprietary Media Filter Maintenance Plan for <br /> 2075 Broadway Street <br /> MODIFIED DELAWARE SAND FILTER Proprietary media filters <br /> are usually two- <br /> chambered, including a <br /> pretreatment settling <br /> basin and a filter bed filled <br /> 5EMM <br /> MEN <br /> with sand or other <br /> absorptive filtering media. <br /> As stormwater flows into <br /> the first chamber, large <br /> particles settle out, and <br /> , r pr then finer particles and <br /> other pollutants are <br /> removed as stormwater <br /> o <br /> mum flows through the filtering <br /> oecr� <br /> media in the second <br /> chamber. <br /> Project Address and Cross Streets 2075 Broadway Street, Redwood City, CA 94063 Bounded by <br /> Jefferson Avenue and Broadway Street <br /> Assessor's Parcel No.: 053-131-160 053-131-170 <br /> Property Owner: Lane—Broadway, LLC <br /> Phone No.: 650-838-0100 <br /> Designated Contact: <br /> Phone No.: <br /> Mailing Address: <br /> The property contains one (1) proprietary media filter(s), located as described below and as shown <br /> in the attached site plan'. <br /> ■ Proprietary Media Filter No. 1 is located at the garage entrance near the southeastern corner <br /> of the building. Its access points can be shown on Exhibit B, Stormwater Management Plan. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which <br /> reduces pollutant removal efficiency and may lead to Proprietary Media Filter failure. <br /> Routine maintenance activities, and the frequency at which they will be conducted, are <br /> shown in Table 1. <br /> 'Attached site plan must match the site plan exhibit to Maintenance Agreement. <br /> Page 1 Updated 711116 <br /> ATTY/AGR.2017.203/Lane Partners, LLC-STMMA <br />