My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 cinema - closing docs
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 cinema - closing docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:27:38 PM
Creation date
12/6/2004 9:14:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
numerous files
PROJECT NAME
Cinema - closing documents from escrow
RMP File Number
100 bin 24
Date
11/29/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> EXHIBIT D-4 <br /> LANDLORD'S BUILDING WORK <br /> Landlord shall finance, design and construct the core and shell of the theater premises as <br /> outlined below. All design of the theater space within the premises shall be designed by <br /> Tenant's architect. Landlord shall construct all vertical transportation (i.e., two (2) escalators, <br /> elevators, stairs) for the theater building. Landlord shall provide all walls that divide the theater <br /> space from non-theater space. The Landlord's core and shell includes all building egress stairs <br /> and vestibules designed to comply with code to provide emergency egress from all floors to the <br /> street level. The base building will be constructed to accommodate full stadium seating <br /> auditoriums (with fourteen-inch risers), provided for 20 screens. The base building will <br /> accommodate space for tenant's high ceiling lobby area. <br /> CSI Div. Description <br /> 2 Site Work <br /> Landlord to provide all on and off site improvements <br /> 3 Concrete <br /> Except for concrete work for sloped floor toping and stadium seating, <br /> Landlord shall provide all concrete work. <br /> Mat Slab. <br /> Metal Pan Stair Fill. <br /> Concrete Topping and Metal Deck for Structural Floor Slab <br /> Concrete Topping and Metal Deck for Theater Mezzanine, including <br /> mechanical mezzanines and elevated proj ector platforms. <br /> Elevator pit for elevator providing access to Mezzanine level. <br /> 4 Masonry <br /> Exterior Wall Assembly mainly consisting of metal panels. <br /> 5 Structural Metals <br /> Except for structural metal and metal deck for stadium seating, Landlord <br /> shall provide all structural metal. <br /> Structural Steel Floor and Ceiling Framing <br /> Structural Floor Mezzanine Framing <br /> Metal Deck at Theater Level <br /> Mezzanine Floor Decking (including elevated projector platforms) <br /> Shear Studs <br /> Mechanical Mezzanine floor Framing and Deck <br /> 5 Spray Fireproofing <br /> To the extent required by code, Landlord shall fireproof all its <br /> D-4 <br /> CHG02:309137S.v7 <br /> . --......-... <br />
The URL can be used to link to this page
Your browser does not support the video tag.