My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Hyland Contractors
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Hyland Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 3:14:04 PM
Creation date
12/8/2004 9:43:06 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Hyland Contractors
PROJECT NAME
electrical evaluation - storm drains system pump stations
RMP File Number
304.5
Date
12/1/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />ELECTRICAL EVALUATION AND PREVENTIVE MAINTENANCE SERVICES <br />FOR SANITARY SEWER SYSTEM LIFT STATIONS <br /> <br />SCOPE OF SERVICES <br /> <br />The City's Sanitary Sewer System includes 31 major sanitary sewer lift stations. The scope of <br />services encompasses the entire system of pumps, motor control cabinets and generators. <br /> <br />Consultant will perform the following services on a time and materials basis: <br /> <br />1. <br /> <br />Work will be performed by consultant in order of priority as set by Redwood City <br />(PWS) Sanitary Sewer Maintenance Section Utility Specialist, Paul Heavenston <br />("Specialist"). <br /> <br />2. <br /> <br />Communicate and confirm scheduled work days with Specialist or Sanitary Sewer <br />Maintenance Section Supervisor Ray Bartolo ("Supervisor"). <br /> <br />3. <br /> <br />Prior to any station shutdown, when a shutdown is required, Consultant will inform <br />and coordinate shutdown with the specialist or supervisor. <br /> <br />4. <br /> <br />Inspect and evaluate all electrical components at each pump station including <br />interior of structure and exterior of structure. <br /> <br />5. <br /> <br />Repair and or replace small parts as needed during PM. <br /> <br />6. <br /> <br />Provide a written report for each station, on a form to be provided by the City, <br />containing the findings of the inspection within 5 working days from the date of <br />inspection on all, all work completed, and any and all materials used. <br /> <br />7. <br /> <br />Consultant must receive verbal authorization from the Supervisor or Specialist prior <br />to initiating any work, or purchasing materials or components where the cost <br />exceeds $500.00 or is beyond the typical scope of preventative maintenance. For <br />such work, Consultant will provide a written estimate of all costs, including <br />materials and labor. <br /> <br />8. All parts and materials belong to the City of Redwood City and shall be given to the <br />Speciali~t for disposal at the Municipal Services Center (MSC), 1400 Broadway, <br />" Redwood City, CA <br /> <br />'" H'_....""-,, , """.".-"--..""-.."...-..."....".--".,,..,,.----.--........,.. .-.. ..._.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.