My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Redwood City Electric <br /> 114 Hazel Ave. <br /> Redwood City, CA 94061 <br />April 1, 2004 <br />Freedman Tung & Bottomley <br />74 New Montgomery Street <br />Suite 300 <br />San Francisco, California 94105 <br />Attention: Ian Ross <br />Subject: Cinema Streetscape Project (Revised) <br />Dear Ian: <br />Thanks you for considering Redwood City Electric for the preconstruction services at the <br />above project in Redwood City, California. We are including the following services in our <br />scope of work: <br />1. Preparation of drawings suitable for Design/Build construction by Redwood City <br />Electric and permit submittal to the City of Redwood City. <br />2. CAD background drawings to be furnished by Freedman Tung & Bottomley. <br />3. Drawings will be prepared using AutoCAD 2002. <br />4. Engineer's review and wet signing of permit drawings by an engineer currently <br />licensed in the State of California. <br />5. Attendance at approximately eight (8) design meetings in San Francisco or San <br />Mateo counties. These meetings are prior to the start of construction. Meetings after <br />the start of construction will be included in the construction cost estimate. <br />6. Preparation of two sets of drawings for submittal: 75%, and 100%. <br />7. Coordination with other trades and material suppliers for special street lighting <br />accessories, including Theater Gateways, and planter columns. <br />8. Coordination with PG&E for service to new street lighting and design of appropriate <br />metering facilities. <br />9. Coordination with waterproofing consultant for Parking Garage. <br /> ._".~."._..._- <br />
The URL can be used to link to this page
Your browser does not support the video tag.