|
Trustee I.Te.Idulty offers the following Resolution and moves its adoption, Trustee Jones
<br />seconds the motion 3dotion Carried.
<br />RESOLUTION ORDERING TIM ti'JORK NO.0-9.
<br />RESOLVED, that whereas the Board of Trustees of the Town of Redwood City did on the 16th.
<br />day of June,pass its resolution of Intention No,C-9 to order tiie hereinafter described
<br />work to be done and improvements to be made in said Town,whic4 Resolution of Intention
<br />No.0-9 was duly and legally published as required by law,as appears from the affidavit of
<br />D.E.OlKeefe now on file in the office of the Clerk of said Town; and
<br />WHEREAS,notices of the passage of said Resolution of Intention No C.-9 headed11Notice of
<br />Improvement° were duly and legally in the form and manner as required by law,as appears
<br />from the affidavit of Edward Dearborn,Street Superintendent of said Town; and
<br />1IMPMAS,it appears from the affidavit of said Edward Dearborn,said Street Superintendent
<br />that the posting of said notices of imp rovement was completed on the 2¢th.day of June,
<br />1919, and
<br />MEREAS,in and by said Resolution of Intention No.0-9 Illonday the 7th.day of July,1919,at
<br />the hour of 8 O'clock P.M. of said day at the meeting place of the Board of Trustees of
<br />said Tocrn of Redwood City,in the Town. Hall on Webster Street in said To,, -,m of Redwood City,
<br />County of San Mateo,State of California,was fixed and established as the day,hour and
<br />place when and where any and all persons objecting to the proposed work and improvements
<br />described in said :Resolution of Intention No.0-9 zould appear before the Board of Trustees
<br />of said Town of Redwood City and show cause why said proposed work and improvements should
<br />hot be carried out in accordance with said Resolution of Intention No.0-9 ;and
<br />�,'F�r^.D S,at the day,hour and place when and where any and all persons having any objections
<br />to proposed work and improvements desdribed in RESOLUTION of INTENTION No.0-9 ,would appear
<br />before the Board of Trustees of the Town of Redwood Cit,- and show cause why said proposed
<br />work and improvements should not be carried out in accordance with said Resolution of
<br />Intention No.0-9 no person or persons appeared and no objections were made against said
<br />proposed work and improvements described in said Resolution of Intention No.0-9;
<br />THEREFORE BE IT RESOLVED, that the public interest and convenience require the work and
<br />improvements herein described, and the Board of Trustees of the Town of Red -:,rood City hereb,,r
<br />orders the following work to be done and improvements to be made in said Town of Redwood
<br />C,.ty,to-wit;
<br />That a double section corrugated
<br />If said line were extended In a straight
<br />the Map of the Town of Mezesviile;
<br />'
<br />Iron arch culvert 4% Inches by 33
<br />line easterly, and running thence along
<br />thence easterly In a straight line to
<br />Inches, on concrete base, be constructed
<br />a line 3 feet northerly from and paral-
<br />the center line of Blain street; thence
<br />on Phelps street at Cassia street, Im-
<br />lel to the southerly line of Webster
<br />southerly'along the center line, of
<br />Main
<br />No. C -q
<br />mediately adjacent to curb line on the
<br />street to the easterly abutment of the
<br />street to its Intersection with the
<br />southerly side of Phelps street, the
<br />concrete bridge on Webster street, said
<br />center line of Pine street; thence
<br />/��
<br />northerly section or half of said culvert
<br />24 -Inch storm sewer to be 252 feet In
<br />northerly and along the center line of
<br />U-/�/��
<br />to be 60 feet long, and commencing at
<br />length.
<br />Pine street to the center line of Cooper
<br />i.
<br />`!Z
<br />the easterly line of Cassia street and
<br />That the concrete abutment of the
<br />street; thence westerly along the center
<br />e
<br />extending across the width of Cassia
<br />concrete bridge on Webster street
<br />line of Cooper street to the center line
<br />M0
<br />!I street, and the southerly section or
<br />where snid 24 -Inch storm sewer strike,
<br />of Chestnut street; thence. northerly
<br />1 l •
<br />half of said culvert to be 43% feet
<br />same be opened by having cut therein
<br />along the center line of Chestnut street
<br />i long, with one Wye. branch 4% Inches
<br />a 24 -Inch hole to permit said storm
<br />to the center line of Phelps street;
<br />by 33 inches extending southerly along
<br />sewer to empty Into the creek.
<br />thence westerly along the center line
<br />the easterly curb of Cassia street for
<br />That n concrete storm water Inlet
<br />of Phelps street to the center line of
<br />a distance of 9s/. feet, and also with
<br />24 Inches by 24 Inches be constructed
<br />Main street; thence southerly along
<br />one Wye branch 41/2 Inches by 33 Inches
<br />with Iron cover, at the southeast aor-
<br />the center line of Main street to the
<br />S It. feet long extendingsoutherly along
<br />t. M
<br />nor of Alain street and Phelps street to
<br />center line of Webster street extended;
<br />westerly curb Cassia street. The
<br />connect with 18 -inch corrugated Iron
<br />thence westerly along the center
<br />ends of said double section culvert and
<br />to be
<br />line of Webster street to the ens-�
<br />the ends of said Wye branches to have-
<br />storm sewer constructed.
<br />terly bank of the easterly arm or
<br />concrete Inlets.
<br />. That a concrete storm water Inlet
<br />branch of Redwood Creek: thence
<br />That a concrete gutter 5 inches thick
<br />24 Inches by 24 inchds be constructed
<br />southerly along the easterly bank
<br />and 30 inches wide be constructed on
<br />with Iron cover, at a point on the
<br />of the easterly arm or branch
<br />the southerly side of Phelps street
<br />westerly gutter line of Main street
<br />of Redwood Creek to the north -
<br />from a point 5 feet westerly from the
<br />where a line 3 feet northerly from and
<br />erly line of the Southern Pacific Rail -
<br />westerly line of Cassia street and ex-
<br />parallel to the southerly line of Web-
<br />road Company right-of-way; thence
<br />tending to the easterly line of-lfnple
<br />ster street would intersect said wester•
<br />easterly along said northerly line of
<br />street. Said gutter to begin at the
<br />ly gutter line of Alain street If said
<br />said Southern Pacific Railroad Com -
<br />southerly curb line of Phelps street
<br />line was extended easterly, to connect
<br />pang right-of-way to the point of be -
<br />and extended said width of 30 Inrhea
<br />with 184nch corrugated Iron storm
<br />ginning, provided, nevertheless, that,
<br />towards the center of the street.
<br />sewer to be constructed and also to
<br />the streets, avenues, roads and places,
<br />That a concrete gutter 5 Inehes
<br />connect with 24 -Inch ' vitrified salt
<br />situate within said district shall be
<br />thick and 30 Inches wide be constructed
<br />glazed the pipe storm sewer to be con-
<br />omitted fro many assessment made or
<br />on the southerly side of Phelps street
<br />strutted. All the hereinbefore and
<br />levied for paying the costa and ex -
<br />fro mthe westerly line of Maple street
<br />hereinabove mentioned an ddescribed
<br />pensee of the above mentioned work
<br />to the easterly curb line of Alain street.
<br />work and Improvements shall be. done
<br />and improvements, the said streets,
<br />Said gutter to begin at the southerly
<br />in accordance with the special plans
<br />avenues, roads and places belonging
<br />curb line of Phelps street and extend
<br />and specifications heretofore adopted
<br />to said Town of Redwood City, and
<br />said width of 30 inches towards the
<br />for doing said work and making said
<br />being In use in the performance of a
<br />center o fthe street.
<br />improvements by the Board of Trustees
<br />public function, to -wit In use as pub -
<br />That a concrete gutter 6 Inches
<br />of the Town of Redwood City on the
<br />ltc streets, avenues, roads and places.
<br />thick and 5 feet wide be constructed on
<br />16th day of June, 1919, and now on file
<br />The Map of the Town of Dlezesvtlle
<br />the southerly side of Phelps street
<br />In the office of the Clerk of said Town
<br />hereinbefore referred to Is of record
<br />across the intersection of Maple street,
<br />of Redwood City, to which plans and
<br />in the Recorder's office o fthe County
<br />said gutter beginning at the easterly
<br />specifications reference is hereby made
<br />of San Mateo, State of California, in
<br />line of Maple street and extending
<br />for a further description of said work
<br />Map Book 1 at page 79.
<br />across Maple street to the westerly line
<br />and improvements and for further par-
<br />All the herein proposed work and
<br />of Maple street. Said 5 -foot gutter
<br />ticulars and the same made a part
<br />improvements shall be done in pun-
<br />to be constructed so that when same
<br />hereof.
<br />and In conformity with nu
<br />strikes the curb on both sides of Maple
<br />And said Board of Trustees does
<br />act of h the State of '
<br />act of the Legislature
<br />street it shall taper down to meet the
<br />hereby determine and declare that said
<br />if Act
<br />entitled, Iilf7th,
<br />20 Inch gutter to be constructed. Said
<br />proposed work and Improvements, are
<br />of19California,
<br />of 19 1,
<br />approved April 7th, 1911, and
<br />5 -toot gutter shall begin at a line 30
<br />more than local and ordinary public
<br />s am
<br />acts amendatory thereof.
<br />Inches northerly from and parallel to
<br />be and will effect and benefit the
<br />— -
<br />the southerly curb line of Phelps
<br />lands and district hereinafter
<br />lands
<br />street and extend said width of five
<br />iibydesdb-
<br />which said district is hereby de-
<br />feet In a southerly direction.
<br />ced,ls et benefitted by
<br />dared to be the
<br />That an 18 -Inch corrugated Iron cul-
<br />pro
<br />said work and Improvements, and to
<br />vert storm sewer 46 feet long be con.
<br />have the exterior boundaries herein -
<br />strutted across Main stret beginning
<br />after bed as the boundaries
<br />ht the gutter line at the southeast
<br />thereof;;that therefore the entire coats
<br />corner of Alain street apd Phelps street
<br />and expenses of said work and Im-
<br />and extending in a straight line across
<br />hereby
<br />shall be and are hereby
<br />Alain street to a point at the westerly'
<br />made charprovement
<br />made chargeable against and shall be
<br />gutter line of 'Alain street where n tine
<br />assessed upon said lands and district,
<br />3 feet northerly from and parallel to
<br />which district is within the limits of
<br />the southerly line of Webster street
<br />the Town of Redwood City, County of
<br />would Intersect said westerly gutter
<br />San Mateo, State of California, and 'the
<br />line of Alain street If sold line were
<br />exterior boundaries thereof are Par.
<br />extended In a straight line easterly.
<br />ticularly described as follows, to -wit;
<br />That a 24 -Inch vitrified salt glazed
<br />the pipe storm sewer be constructed
<br />Beginning at the intersection of the
<br />on Webster street commencing at a
<br />westerly line of Maple street and the
<br />point at the westerly gutter line of
<br />northerly line of the right-of-way of
<br />Alain street where a line 3 feet north-
<br />the Southern Pacific Railroad Company,
<br />erly from and parallel to the southerly
<br />thence northerly along the westerly
<br />line of Webster street would Intersect
<br />line of Maple street to the common
<br />..
<br />- aatd westerly gutter line of Main street
<br />corner of lots 40 and 41 as shown on
<br />The Town Clerk id hereby directed to post a notice of said work and improvements,to-
<br />gether with the plans and specifications therefor,conspieuously for five days on or near
<br />the council chmaber door of said Board of Trustees, inviting sealed proposals or bids for
<br />doing the work and making the improvements ordered,He is also directed to publish a notice
<br />inviting such proposals, and referring to the plans and specificatins posted on on file,
<br />
|