Laserfiche WebLink
102 <br />0 <br />Regular Adjourned meeting of the <br />Redwood City,Augast 25th.Iglg.8 o'clock P.M. <br />Board of Trustees of the Town of Redwbod City held. <br />Upon roll call there were present,Trustees;-President Carl &.Mabie,M.E.Ryan,Geo.W. <br />Itic.Nulty,J.C.Jones,Geo.A.Sreiss,City Clerk'W.A.Price. <br />On motion of Trustee Me.Nulty,seconded by Trustee Kreiss,the minutes of regular <br />meeting held August 18th.1919 be dispensed with.Motion Carried. <br />Affidavit of Jas.D.Hedge in the matter'of Publishing notice inviting sealed proposals <br />for constructing a concrete bridge on Broadway,Webster Street and Maple Street,as per <br />plans and specifications of the City Engineer was on motion of Trustee Me.Nulty,second-ed <br />by Trustee Jones,same be received and filed,Motion Carried. <br />The following bids were received for the construction of Concrete Bridges on Broadway, <br />Webster and Maple Streets, and were publicly opened,examined and declared. <br />Name ofBidder-Chas.J.Lindgren. <br />Three (3( bridges complete ----------------------------0 25,017.00 <br />For 1200 sq.ft:of pavement Broadway d? 0 30ets-----= 360.00 <br />For 780 Cu.yds.channel excay.Maple St " 1.50-------= I,170.00 <br />Total Bid---------------------- 26,547.00 <br />For Bridges separdtel:y. <br />Broadway Bridge Complete,the sum of -------------------0 1,467.00 <br />For 1200 sq.ft.of pavement ---------a $ 30 cents-------- 360.00 <br />Total--------------------------- 13,827.00 <br />Webster Street .Bridge Complete- the sum of --=--------- 0 3,950.00 <br />Maple Street Bridge Complete,the sum of -------- ------ 7,850.00 <br />Total------------------------ ---$12,970.00'. <br />Name .of Bidder-J.H.Wilson. <br />Three Bridges Complete-------------------------------- $ 29.927.00 <br />For 1200 Sq.ft.of pavement Broadway(DI 30cents--------- 360.00 <br />For 780 cu,yds Channel excav, Maple St.@ $ 1.25------- 975.00 <br />Total Bid -------------------------- $31,262.00 <br />For Bridges separately - <br />Broadway Bridge compl.ete,the - sum of �,*----------------- $ 17 898.00 <br />bb <br />-For 1200 sq,ft.pavement @ 30cts----------------------- 3 0.00 <br />Webster St.Bridge complete,the sum of ----------------12.00 <br />Maple St.Bridge complete,the sum of ;b27.00 <br />For 780 Cu.yds.channel change @ 1.25----------------- 975.00 <br />Total------------------------------- 31,772.00 <br />Mame of Bidder,C.B.Cowden, <br />Three (3) bridges complete----=---------------------- 34,970.00 <br />For 1200 sq.ft pavement Broadway•@ 29 cts------------ 348.00 <br />For 780 ou.yds.channel excav,Maple@ 4 I.50 ------------ I_170.00 <br />Total Bid----------------- -------0 36,488.00 <br />Name of Bidder,A.J.Grier, <br />Three(3) bridges complete--------------------------- 0 36,440.00 <br />For 1200 sq.ft.pavement Broadway @ 35 Ott --------- =- 420.00 <br />For 780 cu.yds.excay.channel Maple@ 1.50------------ 2,170.00 <br />Total Bid -----------------=-----------0 38,030.00 <br />Name of Bidder,S.Mc.Clure. <br />Webhtert$trbet.:'Bridgeir,obmtletaTthe-sum-of------------- $--- 6•r500.00. •--. . <br />Maple Street Bridge the sum of------ I2' 2 0.00 <br />For 780 cu.yde.channel change @ �$ I.25 ------ ------------ 975.00 <br />Total Bid------------------------------fi 19,745.00 <br />Moved by Trustee Me.Nulty,seconded by Trustee Jones the contract for the construction of <br />Broadway,Webster and Maple Street Bridges be awarded to Chas.J.Lindgren,he being the lowest <br />bidder,and the certified checks be returned to the unsuccessful bidders,Motion Carried. <br />On motion of Trustee Ryan,seconded by Trustee Kreiss,the plans and specifications of <br />Architect J.R.Miller,for the construction of the Central Fire House be accepted by this <br />Board.Motion Carried. <br />U <br />