Laserfiche WebLink
272 <br />Redwood City,July 5th.192I,8 o'clock P.M. <br />6 <br />Regular meeting of the Board of Trustees of the Town of -Redwood City held. <br />.Upon roll call there were present Trustees;- President M.E.Ryan,Carl K.I44abie,Geo.W. <br />Mellulty,Geo.A.Kreiss,City Clerk W.A.Price,Absent Trustee H.C.Tuchsen. <br />Minutes of regular meeting held on July 20th.192I,were read and on motion of Trustee <br />Kreiss,seconded. by Trustee Mabie,,same be approvecl-as read,Motion Carried. <br />Affidavit of Jas.D.Hedge in the "matter of Publishing notice to bidders for. 48 f eet <br />of 8 inch 'and 5800 g'eet of 4 inch cast iron water pipe and 18--4"x 411 Tees,was on motion <br />of Trustee Mabie,seconded by'Trustee Kreiss said affidavit be received and filed,Motion <br />Carried.. <br />The* following bids for cast Iron Water Pipe and tees were received ,Publicly opaned, <br />examined and deelared.; <br />.Rolph,Mills & Co,-Agts.R.D.Wood Co. <br />Prices f.o.b.foundry Philadelphia. -with freight allowed to Redwood City. <br />48 lin.ft.of.8" c.i.pipe-2280 lbs.@ $66.25 per ton -----------0 75.41- <br />5800 " " .4„ II "12586p „ ,� 70.25 " I, ---------- 4414.5 <br />18 4"x 411 Tees- 2304 lbs.. -- - " 0.07 11 lb <br />------ ----- •16L 24 <br />Total--'------------= ------- X4651.23 <br />Wm.P.Horn Co.-Agts,National Cast Iron Pipe Co. <br />Prices f.o.b.cars,Birmingham. <br />48 lin,fi.of 8r' c.i.pipe=.2280 lbs.C• 39.56 per ton ----------4 45.03 <br />5800 " u II 4„ ,I II i, .225860 rr . ,r . 42.07 " II -- ------ 2647.47 <br />18- 4"g 411 Tees- 2304 lbs,----- 6.34 each ----------- 114.12 <br />Total------------------- X2806.62 <br />Bids contains guarantee rail & water rate to Redwood City <br />44.725 per ton -total freight------------------ 960.40 <br />Total-------------------- X3767.02 <br />American Cast Iron Pipe Co. <br />Prices f.o.b.Birmingham,Ala. <br />0lin.ft.of 81r c.i.pipe(2280 lbs) O 1.00 per <br />580 II It r ft--------- --s�- 48.00 <br />4 45 -----------213.00 <br />18-4"X 4" Tees------------------- <br />6.40 each --------- - 125.20 <br />Total -------------------------2976.20 <br />Alternate bid submitted f.o.b.Redwood City <br />840 lin.ft.of 81r c.i. pipe --'----- © $ I.4[0 per ft -----------57 67.20 <br />5 lI II II A „ ,I " ,1 ------- " o. U6 if If ---------- 828.00 <br />18- 4"X 4" Tees ----------------- 7.36 each------------- 3132.48 <br />Total ----------------------- -04027.68 <br />(i <br />• i <br />U.S.Cast Iron Pipe & Foundary Company. r. <br />Prices f.o.b.Redwood City. <br />840 lin.ft.of 81' c.i.pipe-2280 lbs. 0 $56.40 per ton---------- 64.29 <br />5 II ,I II A t, I, II 1I IQ5860 t, 5R-40 ❑ „---------- 37388.04 <br />18-4"X41'---------------------- n .75 each----- =--- -- 157.50 <br />Total------------- - <br />- 3959.83 <br />Central Foundary.Universal Cast Iron Pipe. <br />. E <br />840 lin.ft.of 81I c.i.pipe-----------C� 0I.055 per ft. -----------N 50.64 <br />4 ----- 0'545 -----------32 1,00 <br />18-4"411 Tees--------------------- 'r 4.45 each---------------- 80.10 <br />Total---------------------------- 3291.74 <br />Moved by Trustee Mabie,seconded by Trustee Kreiss,action on the foregoing bids be deferred <br />to next megftlag meeting ,to give City Engineer time to :�igore the different bids,Iotion i <br />U <br />T <br />