|
lines on both "sides thereof, and at tending from main sewer In center ofcenter
<br />aid street to the properfy line on tfiol
<br />ortherly side thereof; and a lateral)
<br />xtending from the main sewer in the:(
<br />enter of said street to each of the fol_.
<br />lots, 1, one to line dividing lotiaL
<br />and 6 and one to lots:
<br />8, 9, 10, 11, 12, 13, 14',•'
<br />5, 16, 17, 18, 19 and 20 Block 21,
<br />s shown on the last mentioned map„'
<br />nd all extending from the main sewer,
<br />the center of said street to the prop-
<br />rty line on the southerly side thereof
<br />11 the hereinbefore described laterals,
<br />n King street are to be 'connected
<br />4th main sewer in the center of said
<br />with six Inch by four Inch
<br />all glazed tile 'Pipe Wyss, a separate
<br />being used for each lateral.
<br />Vhen-ever the words "salt glazed” are
<br />sed herein they shall mean vitrified
<br />all glazed.
<br />Whenever In this Resolution of m-
<br />manholes are to be constructed `
<br />n the. line of any sewer to be con--
<br />tacted said manholes shall be connect -
<br />d with the sewers so to be construct-
<br />The various maps' referred to herein
<br />re of record in the Recordet•'s office
<br />the County of San Mateo, State of
<br />allfornia, in books and pages as fol-
<br />to -wit:
<br />Map of resubdivision of Lot 12 of the
<br />Whitton and- Montgomery_s:
<br />of a Part of the Redwood
<br />arm In Book 6 of ]Yaps at Page 31.
<br />\fall of subdivision of Lot 16 of the
<br />Whitton and Montgomery,
<br />bdivision of a Bart of the Redwood
<br />arml In Boole 7 of Maps at page 17.
<br />Map of resubdivislon of Lot 20 of the
<br />Whitton and Montgomery's
<br />bdivision of a part of the Redwood
<br />arm in Book 6 of -Maps at page 39. -
<br />Magruder -'s subdivision of Lot 23 of
<br />Whitton and MontgomervIs
<br />bdivision, Redwood City, Calif. la
<br />oak 9 of Maps at page 32.
<br />Wooster, Whitton and Montgom-
<br />1='s subdivision of a part of the
<br />edwood Fat -in In Book ');" of Maps
<br />Page 31.
<br />Map of -Neat Redwood in Book 6 of
<br />at page 43.
<br />Map of Homestead Addition No. 2 to
<br />edwood City being a subdivision of
<br />is 31 and 32 of the Reese subdivision
<br />a part of the Redwood Farm In
<br />ook 7 of Maps at page 7.
<br />Man of Homestead Addition to Red -
<br />Cod City
<br />City being a subdivision of Lot
<br />of the Reese subdivision of a 'part
<br />the Redwood Farm In Boole 7 of
<br />at page 19.
<br />Map of Redwood Oaks, San Mateo
<br />ounty, Calif„ in Boole 6 of Maps at
<br />age 6.
<br />Map of subdivision of Lot 52 of the
<br />ease subdivision of a Part of the Red'-,
<br />Ood Farm in Book 7 of Maps at pajFe
<br />Map of resubdivision of Lots 23, 24
<br />25 of the Reese subdivision of a
<br />of the Redwood Farm In Boole
<br />of Maps at Page 32.
<br />Map of Wallace subdivision being a
<br />of Lot 27 of the Reese
<br />and Lot 6 of the Wooster,
<br />and Montgomery subdivls-
<br />of a part of the Redwood Farm in
<br />oak 6 of Maps at page 65:
<br />Map of subdivision of Lot 29 of the
<br />subdivision of a part of the
<br />edwood Farm, in Book 7 of Maps at
<br />age 21.
<br />Map of Resubdivision of Lot 30 of the
<br />line of Ramona street commenc-
<br />the following places, to -wit: one lat-1 avenue to lot 31 Block 5 all as shown
<br />I Ing at a Point on the center line of said a
<br />oral at line dividing lots 12 and 131 on last mentioned map, and all extend-
<br />Ramona street distant 215 feet wester- o
<br />Block 12 and one lateral at line divid- Ing from main sewer In the center of
<br />ly from; the westerly line of Roosevelt
<br />lots 10 and 11 Block 12 and one later -1 said Ramona avenue to property line
<br />avenue and extending a to the center line
<br />al at line dividing lots 8 and 9 Block on the northerly side thereof; and all
<br />of Roosevelt avenue and to connect 1 0w'Ing
<br />12 as shown on last mentioned map,' the hereinbefore described laterals on
<br />with manhole to be constructed at the 5
<br />;and all extending from main sewer in`Rainona, avenue are to be connected
<br />beghrming of said sewer and also to 7
<br />Center of street to, property ]ins on with the main sewer In the center o[
<br />connect with manhole at center line of 1
<br />11 the southerly side thereof; and one said avenue with six (6) Inch by four
<br />lateral at line dividing lots 22 23
<br />a
<br />Roosevelt avenue at center lino of Ra- a
<br />and (4) Inch salt glazed tile PIP, wyes, a
<br />Block 13
<br />mona street extended, which manh010 1
<br />In
<br />and one lateral separate Wye being used for each lat-
<br />line dividing
<br />Is now in place; that a brick manhole
<br />at lots 24 and 25 eral.
<br />be constructed with cast Iron frame e
<br />Block 13 and one lateral at line di- That a six (6) inch salt glazed talo
<br />viding lots and 26 block 13 all
<br />and cover on Ramona street at a point a
<br />0
<br />-1 as
<br />shown on last mentioned ma and all Pine sewer along the
<br />p' center line
<br />on the center ]Inc thereof 216 feet w
<br />from the westerly line of
<br />f Sequoia
<br />of Sequoia avenue from the
<br />extending from main sewer 1n cantor avenue
<br />center line of Oak avenue to the
<br />Roosevelt s treat
<br />Roosevelt avenue; that tom• (4) inch
<br />of street to property line on the cantor
<br />northerly side thereof; and. tiro of Roosevelt avenue and
<br />salt glazed tile pipe sewer laterals, 28 a,
<br />i vye
<br />all the to connect with manhole to be cone
<br />hereinbefore described laterals
<br />feet in length be constructed on }
<br />� on
<br />Sierra street are to be connected with structed at center line of Oak avenue
<br />mona street extending from the main
<br />main
<br />u
<br />1 and center line of Sequoia avenue ex-
<br />the main sewer In the center of the tended and also to connect
<br />I
<br />sewer in the Oester of said street to s
<br />the property lines on both sides there -
<br />i with man,
<br />street, with six til Inch by four (4) hole now in Place at center line of
<br />Inch salt glazed Life wyes, a Sep-
<br />of at the following places, to -wit• one
<br />t ention
<br />,pipe
<br />arnte Wye being used for each ]at-� Roosevelt avenue and center line o[
<br />lateral extending from main sewer In
<br />' o
<br />ei•al. Sequoia avenue that brick
<br />center of street to Lot 10 Block 1 and
<br />st
<br />I manholes with cast Iron frames and
<br />astf Iron
<br />one lateral from main sewer In center,
<br />• That a ( Inch salt file pipe coves be constructed on Sequoia
<br />of street and extending to Lot 11 Block' 0
<br />c long
<br />sewer be constructed along the Dente cane at the following places, to -wit:
<br />it:
<br />1 and one lateral extending from main O s.
<br />line of Junipero avenue from the cen- one manhole on the center line of Be.
<br />sewer in center of street to lot 12 Block
<br />ter line of Oak avenue to the center quoia avenue at a point 245 feet west-
<br />1 all as shown on Magruder's Subdlvis-: a
<br />of Ienue to from the line
<br />Lot '"'Coster, Whitton Of
<br />I
<br />nine
<br />ect withosevelt manhole to beand
<br />con constructed enue- and onetmanhhole on the center
<br />at center line Oak
<br />Subdivision,of
<br />Montgomery S bdivision, Redwood C
<br />City, Calif.; lateral 1 ows,
<br />of avenue and can- line of Sequotn avenue fit a point Ser
<br />and one egtending,
<br />ter line of Junipero avenue and to con-' feet westerly from the westerly line
<br />from main sewer in center of street tonect
<br />th manhole now In tace of Oak avenue; that four (9) Inch salt
<br />2 and one ` Yooster,
<br />centerline of Roosevelt avenue at cent glazed the pipe sewer laterals, 34 feet
<br />Ing s ubdivlsion
<br />int from ml
<br />ain ewer in centerofstreet
<br />length, be constructed on
<br />ter line of Junipero avenueextended;aIron
<br />to lot 11 Block 2 and one lateral F
<br />ex-
<br />a main
<br />-that brick manholes with cast Iron, avenue and extending from the mato
<br />a
<br />tending from main sewer in center of
<br />Frames and covers be constructed on sower in the center of said avenue
<br />said street to lot 12 Block 2 all as Yooster,
<br />Junipero avenue at the following the property lines on each side there-
<br />e-
<br />to
<br />shown on last mentioned ma s
<br />P; and all F
<br />the hereinbefore described
<br />Places, -wit: one manhole on the of, at the following places, to -wit: one
<br />laterals on
<br />center line of Junipero avenue 245 lateral extending from the main sewer
<br />feet westerly from the westerly line
<br />Ramona street are to be connected
<br />with the main sewer on said street Yooster,
<br />oft in the center of said avenue to lot 38
<br />^ Oak avenue; and one manhole on the'Block o and one lateral at line divid-
<br />with six (G) Inch by four (4) inch salt s u
<br />center line of Junlpero avenue at a Ing lots 39 and 40 Block 5 and one let-
<br />glazed the pipe wyes, a separate wye F
<br />point 615 feet westerly from the West- eral at line dividing lots 41 and 42
<br />being used for each lateral.
<br />erly line of Oak avenue; that four (4) Block 6 and one lateral at line dividing
<br />That a six (6) inch salt glazed the W Yooster,
<br />inch salt glazed the pipe sewer lat- lots 43 and 44 Block 5 and one lat-
<br />Pipe sewer be constructed along the a
<br />erals, 34 feet in length, and extending oral at line dividing lots 45 and 46
<br />center line of McKinley street from a B
<br />from the main sewer In the center of Block 5 and one lateral at line dividing
<br />Point 9.5 feet westerly from the easter-,
<br />the avenue to the property lines on lots 47 and 48 Block 5 find one later-
<br />at
<br />ly and of said street to the center line R
<br />both sides thereof be constructed on at at line dividing lots 49 and 50 Block
<br />of Roosevelt avenue and to connect
<br />t
<br />Junipero avenue fit the following 5 and one lateral at line dividing lots
<br />with a manhole to be constructed at a
<br />places, to -wit: one lateral extending 51 and 52 Block 5 and one lateral at
<br />the Point of beginning of said sewer
<br />to the property line of lot 19 Blocl line dividing lots and 59 Block
<br />and also to connect with a manhole Maps
<br />3 and one lateral at line later lot and one lateral at line dividing lots 66
<br />in 5
<br />now In Place at the center line of
<br />a
<br />20 and 21 Block 2 and one lateral a and 56 Block 5 and one lateral at line
<br />Roosevelt avenue and center line of R
<br />line dividing lots 22 and 23 Block dividing lots 57 and 68 Block 5 and
<br />Mclanley street extend�id; that brick to
<br />and one lateral at line dividing lots 2 one lateral at line dividing lots 59 and
<br />manholes with cast iron frames and o [
<br />and 25 Block 3 and one lateral at line 60 Block 5 all as shown on the last
<br />covers be constructed on McKinley B
<br />dividing lots 26 and ?,7 Block 3 and one mentioned map and all extendingfrom
<br />street at the following places, to -wit:
<br />lateral at line dividing lots 28 and 29 the main sewer In the center f the
<br />one manhole on the center line of Me- w
<br />Block 3 and one lateral at line divid-'said avenue to the property line on the
<br />Kinley street at a Point 9.5 feet west- q 8
<br />Ing lots 30 and 31 Block 3 and one lat- southerly side thereof; and one lateral
<br />erlyfront the easterly end of said q f
<br />eral at line dividing lots 32 and 33 at dividing line of lots 5 and 6 Block
<br />street; one manhole on the center line
<br />Block 3 and one lateral at line dividing 6 and one lateral at line dividing lots
<br />of said street at a point 245 feet west -
<br />lots 89 and 35' Block 3 and one lateral 7 and 8 Block 6 and one lateral at
<br />erly from the easterly end of said C
<br />at line dividing lots 36 and 37 Block line dividing lots 9 and 10 Block 6
<br />,treat; and one manhole on the center p
<br />3 and one lateral at line dividing lots and one lateral at line dividing lots 11
<br />line of said street at a point 515 feet
<br />38 and 39 Block 3 and one lateral at and 12 Block 6 and one lateral at line
<br />westerly from the easterly end of said R
<br />line dividing lots 40 and 41 Block 3 dividing lots 13 and 14 Block 6 and one
<br />street; that -four (4) Inch salt glazed w
<br />all as shown on last mentioned map, lateral at line dividing lots
<br />the pipe sewer laterals, 28 feet in 1 0.
<br />ana all extending from mast sewer 15 and 16 Block 6 and one
<br />length be constructed on McKinley
<br />In the center of said avenue to prop- lateral at line dividing lots 17
<br />arty line on the southerly side thereof; 18 Block
<br />street extending from the main sewer a
<br />an
<br />in the center of said street to the prop-
<br />and 6 and one. lateral at line
<br />and one lateral at line dividing lots dividing lots 19 and 20 Block 6
<br />P ortion
<br />erty line on each side thireof, and at 7
<br />and one
<br />10 and 11 Block 4 and one lateral at lateral at line dividing lots 21 and 22
<br />the following places, to -wit: one lat-
<br />line dividing lots 12 and 13 Block 4 Block 6 and one lateral at line divid-
<br />eral at line dividing lots' 1 and 4 Block r esubdivision
<br />and one lateral at line dividing lots Ing lots 23 and 24 Block 6 one
<br />1 and one lateral at line dividing lots s ubdivlsion
<br />and
<br />14 and 15 Block 4 and one lateral at lateral at line dividing lots 25 and 26
<br />5 an" 6 Block 1 and one lateral, at line Yhitton
<br />line dividing lots 16 and 17 Block 4 Block 6 and one lateral extending from
<br />dividing lots 7 and 8 Block 1 and one i on
<br />and one lateral at line dividing lots the main sewer in the center of said
<br />lateral at line dividing tots 9 and 10 B
<br />18 and 19 Block 4 and one lateral at avenue to Lot 27 Block 6 all as shown
<br />Block 1 and one lateral at line divid-
<br />line dividing•1Rts 20 and 21 Block 4 on the last mentioned map, and all ex-
<br />Ing lots 11 and 12 Block 1 and one lat-Rcase
<br />e and one lateral at line dl- tendingfrom the main sewer In the
<br />eral at line dividing lots 13 and 14 R
<br />viding lots 22 and 23 Block centerofsaid Sequoia avenue to the
<br />Block 1 and one lateral at line dividing P
<br />4 and one lateral at line divid- property line the northerly side
<br />lots 15 and 16 Block 1 and one lateral
<br />Ing lot, 29 and 26 Block 9 and ore
<br />r thereof; and all the hereinbefore des-
<br />l
<br />IC line dividing lora 17 and 18 Block 1 It
<br />lateral at line dividing lots 26 and 27 cribed laterals on Sequela avenue are
<br />and one lateral at line dividing lots 19
<br />' ,Flock 9 and one lateral at line divid- In
<br />to he
<br />esixr(6)
<br />and 20 Block 1 and one lateral at line
<br />P
<br />Ing lots 28 and 29 Block 4 and one; the center of said aed
<br />avithin
<br />lateral en venue withsix
<br />'dividing lots 21 and 22 Block 1 and one
<br />lots 23 24,
<br />at line dividing lots 30 and 31 inch four (9) Inch sett glafile
<br />lateral at line dividing and o
<br />Block 4 and One lateral extending from pipe Wyss, a separate wye being used
<br />Block 1 and one lateral at line dividing
<br />main sewer center n treat to lot, for each lateral'.
<br />lots 25 and 6 Block 1
<br />all
<br />32 Bloch 4, all as shown on Inst men-
<br />and one lateral at line dividing
<br />Honed map, and all of said laterals That a six (6) Inch salt glazed tile
<br />lots 27 and 28 Block 1 all as shown on
<br />extending from main sewer In the Pipe sewer be constructed along the
<br />map of subdivision of Lot 16 of the P
<br />center of said avenue to the property center line of Oliver street comment-
<br />Wooster, Wlhftton and Montgomery
<br />line on the northerly side thereof; and Ing at a point 25 feet westerly
<br />Subdivision of a part of the Redwood
<br />Hit the hereinbefore described laterals from• the easterly end of said street
<br />Farm, and all extending from the main
<br />on Junipero avenue are 4o be connect- and extending to the center line of
<br />sewer In the center of said street t0 the
<br />ed with the main sewer in the center Roosevelt avenue and to connect with
<br />Property line on the northerly' side
<br />of said avenue with six (6) inch by a manhole to be constructed at• the
<br />thereof; and one lateral at line divid-
<br />four (4) inch salt glazed the pipe beginning of said sewer and also to
<br />Ing lots 1 and 4 Block 2 and one later-
<br />connect with a manhole now In place
<br />al at line dividing lots 5 and 6 Block 2
<br />wyes, a separate wye being used for
<br />at the center line of Roosevelt avenue
<br />lateral at line dividing lots 7
<br />each lateral• at center line of Oliver street extended;
<br />and one
<br />and 8 Block 2 and one lateral at line
<br />That a six (G) Inch salt glazed the Pipe that brick manholes with cast Iron
<br />dividing lots 9 and 10 Block 2 and ono
<br />'sewer be constructed along the can- frames and covers be constructed on
<br />lateral at line dividing lots 11 and 12
<br />ter lite of Ramona avenue from the Oliver street at the following places,
<br />Block 2 and one lateral at line dividing
<br />center line of Oak avenue to the center to-wlt: one manhole on the center line
<br />lots 13 and 3.4 Block 2 and one lateral
<br />line of Roosevelt avenue and to con- of Oliver street at a point 25 feet west-
<br />at line dividing lots 15 and 16 Block 2
<br />'sect with manhole to be constructed Orly from the easterly end of said
<br />and one lateral at line dividing lots 17
<br />!at center line of Ramona avenue at street; and one manhole on the center
<br />and 38 Block 2 and one lateral at line
<br />.center line of Oak avenue and to con -i line of Oliver street at a Point 350 feet
<br />dividing lots 19 and 20 Block 2 and one
<br />sect with manhole now In place fit westerly from the easterly end of said
<br />lateral at line dividing lots 21 and 22
<br />center line of Roosevelt avenue otii street; that four (4) inch snit glazed
<br />Block 2 and one lateral at line divid,
<br />center line of Ramona avenue extend -'tile pipe sewer laterals, 28 feet In
<br />Ing lots 23 and 2.1 Block 2 and one bat-
<br />ed; that brick manholes with cast Iron length be constructed on Oliver street
<br />erel at line dividing lots 25 and 26
<br />trainee and covers be constructed on and extending from the main newer on
<br />Block 2 and one lateral at line dividing
<br />Ramona avenue at the following Plac• said street to the property lines on both
<br />lots 27 and 28 Block 2 all as shown on
<br />as, to -writ: one manhole on the center sides thereof, at the following places,
<br />the last mentioned map, and all ex -
<br />line of Ramona avenue at a point 245 to -wit• one lateral at line dividing
<br />tending from the main sewer 1n the
<br />feet westerly from the westerly line of lots 3 and 4 Block 1 and one lateral at
<br />center of said street to the property
<br />'Oak avenue; and one manhole on the line dividing lots 6 and 7 Block 1 and
<br />line on the southerly side thereof; all
<br />center line •of Ramona avenue at a one lateral at line dividing lots 9 and
<br />the hereinbefore described laterals are
<br />point 516 feet westerly from the West- 10 Block 1 and one lateral at line divid-
<br />t0 be connected with the main sewer
<br />erly lineof Oak avenue; that four (4) Inch Ing loin 10 and 11 Block 1 and one
<br />on said McKinley street with six (6)
<br />,alt glazed the pipe sewer laterals. Lateral at line dividing lots
<br />inch by four (4) inch salt glazed the
<br />34 feet In length, and extending from
<br />13 Block 1 and one Int-
<br />Pine wyes, n separate wye being use
<br />the main sewer in the center of said 12 and
<br />fi1 14 d 15
<br />eonevlateral iclillg
<br />each l
<br />LuThat r(6)
<br />propertylinesonbothat line diots
<br />avenueFlockoral viding
<br />and
<br />tooth
<br />ar
<br />six Inch salt glazed the
<br />bacon na
<br />lots 16 and 17 Block i and one lateral
<br />pipe sewer be constructed along the
<br />avenue at the following places, to -wit:
<br />line dividing lots 18 and 19 Block 1
<br />center line of King street from the car -
<br />one lateral extending from the main at
<br />lateral at line dividing lots
<br />ter line of Oak avenue to the center
<br />sewer to lot 40 Block 4 and one lateral and ouO,
<br />20 and 21 Block 1 and one lateral at
<br />line of Roosevelt evenue to connect with -
<br />at line dividing lots 41 and '42 Block
<br />line dIVIdIng lots 22 and 23 Block 1 all
<br />manhole to be constructed at center
<br />4 and one lateral at line dividing lots
<br />on map of resubdivWOn of line of King street and center line of
<br />43 and 44 Block 4 and one lateral at as shown
<br />Tot 20 of the Wgostor, Whit-
<br />Oak avenue and also to connect with
<br />line dividing lots 46 and 46 Block 4
<br />dividing lots ton slid montgornery's subdi- manhole now in Place at center line Of
<br />and one lateral at line
<br />is vision of a Part of the Roosevelt avenue at center lime of
<br />47 and 48 Block a4 and one lateral
<br />lots 49 and o0 Block 4 and Redwood Farm, and all extending from
<br />man -
<br />Kipg street extended; that brick man -
<br />frames covers
<br />line dividing and
<br />lateral it line dividing lots 61 and rte main sewer In the center of said holes with cast Iron
<br />andthe King at the
<br />of
<br />one street to the property line on be constructed on street
<br />l Lina
<br />fin Block 4 ana one lateral
<br />62 Blockthereof; and one hat- foil wing Places, to -with: one man -1
<br />Block 4 and one northerly side
<br />lots 63 mut one
<br />line dividing lots 22 and 21 holFat center line of King street at'
<br />''Iteral at line dividing lots 55 and rr t at
<br />noat of Oakavenue;
<br />l3loc202aa 1int.ern
<br />Block 4 and one lateral at line dividing 2t andlione manhtolehon the e line oLdKing
<br />]9
<br />fin Black 4 and one lateral „ 2 feet from
<br />! • t:l 57 and luta 18 and
<br />tots and 60 Block 4 at line dividing
<br />16
<br />street at a point 245 westerly
<br />OTIC
<br />an line dividing in l s
<br />a eral
<br />Iota and one lateral at line dividing lots
<br />the westerly line of avenue: and
<br />line
<br />and one lateral at line dtvlding
<br />15 Block 2 and one e on i516he ef
<br />r line of friom
<br />ine one ha l
<br />l2land at lone
<br />4 as shown on and et westerly
<br />and G2 Bd street atpoint
<br />extending dividing lots 14 and 13 Block
<br />aall
<br />m nd all
<br />last ted man,
<br />la
<br />in the center of said lateral at line dividing lots 12 and h
<br />the westerly line of Oak avenue; that
<br />the
<br />again
<br />from main sewer
<br />the south- Flack 2 and one lateral at line divid-
<br />four (4) Inch salt glazed pipe sew-,
<br />avenue to Property line on
<br />Ing lots 10 end 9 .Block 2 and one let-
<br />.,r laterals, 28 feet in length be Coll -
<br />erly side thereof; and one lateral at
<br />lots 9 and 10 Blocic 5 and Oral at line dividing lots 8 and 7 Block structed on King street, extending
<br />lots
<br />line dividing
<br />11 one lateral at line dividing hots 11 and 2 and one lateral at line dividing
<br />5 Block 2 and one lateral at line
<br />from the ninln sewer in the center of
<br />the to the lines on both
<br />12 Blocic '5 and One lateral at line df- 6 and street Property
<br />dividing lots I aird 4 Block 2 all as aide thereof, at the following Places,
<br />viding lots 13 and 14 Block 5 and one Iand to -wit: one ifitcral extending from tube
<br />16 last
<br />lateral at line dividing lots lb and
<br />all extending fromhe
<br />thesewer In
<br />lateral at tine dividing main sewer in the center of said street
<br />ito
<br />Block 5 and one
<br />lots 17 and 18 Block 5 and one lateral the center of said street to the prop-
<br />the southerly side thereof:
<br />Lot 1 Block 1 and one lateral ex -
<br />1 train the In the
<br />and line dividing Iota ]9 and 20 Block orty line on tending main sewer
<br />all of said hereinbefore•descrIbed' center of said street to each of the fol -
<br />' and one lateral at line dividing iota and
<br />5
<br />lateral at laterals on Oliver street are to be can
<br />-
<br />I lowing lots, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13,
<br />21 and 22 Block 6 and one
<br />21
<br />Block 6 netted with the main sewer on said 14 15, 16, 17, 18, 19, and 20 Bloch 1
<br />''[fie dividing Iota 23 and 29
<br />lots street,wth six Inch by four Inch all as shown mh map of resbdivision
<br />and one lateral at line dividing
<br />feralBlock lateral at salt glazed the pipe wyes, a separate of Lot 12 of the Wooster, Whitton and
<br />26 and 2G 5 and one ed for each lateral.
<br />Block 5 W being used
<br />Montgomery's subdivislon- of a nm•t of
<br />fine dividing lois 27 and 28 grazed t11e
<br />dividing lots That
<br />the Redwood Farm, and all extending
<br />and one )Iteral fit line
<br />29 and 30 Block 5 and one lateral ex- pipe sewer be constructed along the
<br />from the main sewer lh the center of
<br />subdivision of a part of the
<br />Redwood Farm in Book 7 of Maps at
<br />age 43.
<br />Map of Reese subdivision of a part='
<br />f the Redwood Farm In Book B of
<br />Maps at page 5.
<br />Amended map of resubdivision of
<br />Lot 46 of the Reese subdivision of a
<br />art of Redwood Farm in Book 7 of
<br />Maps at Page 40.
<br />
|