|
'stencfe"d at-the. 'Fin tei 23ne oL Redwooi2•
<br />xhat A alx,(6) incix Balt tela ed''
<br />Tines on both sldoe thereof; r~nd'""a
<br />Yeh�dln6 from ms1i},i{tew¢r in oeatei e3
<br />- avenue at center line of May street
<br />pipe newer ba comptructed along thei
<br />the following places, to-wit; one let-
<br />avenue to lot $1 Block' 6 all as 8h0ijl
<br />extended thereto; that a brick man-
<br />-hole with-
<br />Iron frame
<br />center line of Regent street commene-,
<br />Brat at ifna dividing lots 12, and IS
<br />on last mentioned map, and all oxtgad
<br />and cover
<br />Ing at a point 26.feet wepterly from!
<br />Block 12 and one lateral at lino dlVid-
<br />Ing from, Igaln sewer lm the pghtor. pt
<br />be constructed on the center line of ,the
<br />May `street 26 foot westerly from
<br />easterly end of said street and ex-
<br />lots 10 and 11 Block 12 and one later-
<br />aaid Ramona avenue to property Unh -
<br />the
<br />tending to the center line of Redwood
<br />at at line divlding lots 8 and 9 Block'
<br />on the northerly Side thereof; and all
<br />• -easterly end of Bald May street; andavenue
<br />and to connect manhole
<br />as shown on last mentioned map,
<br />the hereinbefore described TatgraU on
<br />also that a brick manhole with cast
<br />iron
<br />to be constructed at said point of be-
<br />and all extending from main sewer In
<br />Ramona avenue are. to be connected
<br />frame and .cover be constructed
<br />ginning.of said newer and also to con-
<br />center of street to property line on
<br />with the main sewer in the canter Of
<br />• on the center line of May street 200
<br />nect with manhole to be constructed at
<br />the southerly side thereof; and one
<br />said avenue with six (4)�inch by Lout
<br />feet westerly from the easterly end of
<br />center line of Redwood avenue andlateral
<br />at line divlding Iota 22 and 23
<br />(4) .inch salt glazed Lite pipe wyeK a
<br />aaid May street; that four (4) inch
<br />. salt glazed the pipe-sewer laterals,
<br />center line of Regent street extended
<br />Block 13 and one lateral
<br />Separate Wye being used for path fat-
<br />24
<br />feet in length be
<br />thereto; that brick manholes with cast
<br />at line dividing lots 24 and 26
<br />'Block
<br />eral
<br />constructed on
<br />May street from the main In the
<br />Iron frames and covers be constructed
<br />13 ,and one lateral at lfna dl-
<br />That a six (6) Inch salt glazed the
<br />sewer
<br />center of the street to the
<br />on Regent street at the following
<br />viding lots 1 and 26 block 18 all as
<br />pipe sewer be constructed along the
<br />property
<br />lines on both sides of the street at the
<br />places, to-wit:_ one manhole, on the
<br />center of said street at a
<br />shown on last mektloned map, and all
<br />extending from main newer In center I
<br />center line, of Sequoia avenue frpm the
<br />following places, to-wit: one lateral
<br />.line point,
<br />26 feet westerly from the easterly end
<br />of street to property line on the,
<br />center line of Oak avenue to the center
<br />line of Roosevelt
<br />from the main serer to the property
<br />thereof; and one manhole on the center
<br />northerly side thereof; and all the
<br />avenue and
<br />to connect with manhole to be 'con.
<br />line on the southerly Side of said
<br />' street 100 feet easterly from Redwood
<br />line of said street at a point 200 feet
<br />westerly from easterly there-
<br />hereinbefore described laterals on
<br />Sierra Street are to be connected with
<br />strutted at center line of Oak avenue
<br />avenue; one lateral to the line divid-
<br />,the end
<br />of; that four (4) inch salt glazed. the
<br />the main Hewer" in the center of the
<br />and center line of Sequoia avenue oz-
<br />tended and also to connect with man-
<br />Ing lots 26 and 26 Block 2' and one let-
<br />eral to line dividing lots 23 and 24 i
<br />pipe sewer laterals, 24 feet in length be
<br />street With Six . (6) Inch by four (4)
<br />inch
<br />hole now In place at ,center line of-
<br />Block 2 and one lateral to line divid-
<br />constructed on Regent street extending
<br />from the main sewer 4n the center of
<br />salt glazed tile pipe, wyes, a sap-,
<br />arate •Wye being used for each fat-
<br />Roosevelt avenue and center- line, of
<br />Sequoia, avenue extended; that brio
<br />Ing Iota 21 and 22 Block and one Int-
<br />the street to the property lines at both
<br />-era'.
<br />manholes with cast Iron frames' ah
<br />oral to Ilse dividing lots 19 and 20
<br />Bloch 2 and one lateral to line divid-
<br />sides of said "street at the following
<br />places, to-wit: one lateral lit line
<br />That a (8) inch iealt g)aeed the pipe
<br />be
<br />cyvers be constructed on Sequoia av-
<br />the following
<br />Ing lots 17 and 18 Block 2 and one'
<br />dividing lots $4 'and 86 Black one
<br />Sewer constructed along the center
<br />line
<br />enueat places, to-
<br />lateral to line dividing lot's 16 and 16
<br />lateral at line dividing lots 86 and 87
<br />of Junipero avenue.from the cen-
<br />ter line of Oak avenue to the center
<br />one manhole on the center line of Seti
<br />quota avenue at a point 246 feet went,
<br />Block 2 as shown on Map of Redwood
<br />Oaks, and, all said laterals running to
<br />Block 4 and one latoral at line divid-
<br />Ing lots 88 and 89 Block 4 and one lat-
<br />line of Roosevelt avenue and to con-
<br />Orly frorri the westerly line of Oak av-
<br />the property line on the southerly side
<br />eral at line dividing lots 90 and 91 Block
<br />nect with manhole to be constructed
<br />at center line of Oak avenue and Han-
<br />enue; and one manhole -oil the center
<br />Tine of Sequoia avenue at g point, 616
<br />of said May street• and one lateral to
<br />line dividing lots 3 and 4 Block 1 and
<br />4 and one, 'lateral at line:
<br />dividing Iota fit 33
<br />ter line of Junipero avenue and to con-
<br />feet westerly from the westerly 'line
<br />one lateral to line divlding lots 6 and
<br />and Block:
<br />4 and one lateral at line dividingteenter
<br />neat w1th manhole now In place at
<br />line of Roosevelt avenue at cen=
<br />of Oak avenue; that four, (4) Inch salt
<br />glazed the pipe sewer laterals, 34, feet
<br />6 Block 1and one lateal to line df-
<br />lots 94 and 96 Block 4 all as shown on!
<br />ter line of Junipero avenue extended;
<br />in length, be constructed on Sequoia-
<br />vlding lots 7 and 8 Block 1 and one
<br />last mentioned map, and all extend-
<br />that brick 'manholes with cast Iron
<br />avenue and extending from the main
<br />lateral to line dividing lots 9 and, 10
<br />Block and one lateral to line divid-
<br />Ing from main sewer 1n center of said,
<br />street to property line on the norther-
<br />frames and covers be constructed on
<br />Junipero
<br />Bower In the 'center of said avenue to
<br />the lines on
<br />Ing lots iY and 12 Block 1 and one lat-
<br />IY Bide thereof; and one lateral at line,
<br />avenue at the following'
<br />places, to-wit: one manhole on the
<br />property each side there-
<br />of, at the following places, to-wit: one
<br />eral to line dividing dots 13 and 14
<br />Block 1 all as Shown on last mentioned
<br />divlding. lots 96 and 97 Block 6 and
<br />one lateral at line dividing lots 98 and
<br />center line of,,.Tun1pero-avenue 246
<br />feet westerly from the westerly line of
<br />lateral extending from the main sewer
<br />in the center of said avenue to lot 38
<br />map, and all of said laterals extending
<br />99 Block 6 and one lateral at line d]-;Oak
<br />avenue; and one manhole on the
<br />Black 6 and one laterad at line'divld-
<br />to the property line on .the northerly
<br />viding lots 100 and 101 Block 6 and
<br />center line �'of Junlpero avenue at a
<br />Ing lots 39 and.40 Block b and one lat-
<br />side
<br />of said May street; all the here-
<br />'
<br />one lateral at line dividing lots 102!
<br />point 616 feet westerly from the west-
<br />eral at line dividing L1ote 41 and."42
<br />before described laterals on May
<br />and 103 Block 6 and one lateral at line
<br />erly line of Oak avenue; that four (4)
<br />Block b and one lateral at line dividing
<br />street are to. be connected with the
<br />dividing lots 104 and 106 Block 6 and
<br />'lateral
<br />inch salt glazed the pipe sewer fat-
<br />dote 49 and 44 Slack 6 and one lat-
<br />to the center of said street
<br />one at line dividing, lots 106
<br />erals, 34 feet in length, and extending
<br />eral at Ilse dividing lots 46 and 46
<br />withsewer
<br />with six (G) inch by tour (4)- Inch salt
<br />and 107 Block, 6 all as shown on -last
<br />from the main sewer In the center of
<br />Block 6 and one lateral at line dividing
<br />glazed the pipe wyes, a separate Wye
<br />being used for each lateral:
<br />mentioned map, and all extending
<br />from main sewer in the center of said
<br />the avenue to the property linea on
<br />both
<br />Iota 47 and 48 Block li_and One later-
<br />That a six (6) inch salt glazed file
<br />'
<br />street to property line on the south-
<br />sides thereof be constructed On
<br />Junipero avenue at the - following
<br />at at line dividing lots 49 and 60 Block
<br />6 and one lateral at line dividing lots
<br />pipe sewer be constructed along the
<br />erly side thereof; all the hereinbefore
<br />ascribed laterals on Regent j street
<br />places, to-wit: one lateral extending
<br />61 and 62 Block 6 and, one lateral, at
<br />center line of Norman street commepe.
<br />to be connected
<br />to the property' line of let 19 Block
<br />line dividing lots 63 and 64 Block 6
<br />Ing at a point 26, fact westerly frora,.are
<br />with the main
<br />3 and one lateral at line dividing lots
<br />and one lateral at line dividing lots 66
<br />the easterly end of said street and ex-�
<br />tending to the line Redwood!
<br />sewer in the center of said street with
<br />six (6) inch by four,(4) inch salt glaz-
<br />20 and 21 Block 8 and one lateral, at
<br />line dividing lots 22 and 23 Block 3
<br />and 66 Block 6 and One lateral "at line
<br />center of
<br />avenue and to connect with a man-'ed
<br />tile pipe wyes, a separate Wye being
<br />and one lateral at line dividing lots 24
<br />dividing lotto 67 and 68 Block 6 and
<br />one lateral at line dividing lots 59 and
<br />hole toy be constructed at the point Of I
<br />used for .each lateral.,
<br />slid 26 Block 8 aria one lateral at line
<br />60 Block 6 all as shown on' the last
<br />beginning o1 said sewer and ate, tO
<br />That a six (6) Inch salt glazed till
<br />dividing late 26 and 27 Block 3 and one
<br />mentioned map and all extending from
<br />connect with a'manhole at the center,
<br />Pipe sewer :be constructed along the
<br />lateral at line dividing lots 28 and 29
<br />the main sewer In the center of the
<br />line "of Redwood avenue at the cen-
<br />center line of Oak avenue commene-
<br />Block 3 and one lateral at line divid-
<br />said avenue to thftroperty line on the
<br />ter line of Norman str0et, extended to!
<br />Ong at the center line, of Sierra street
<br />inW late 30 and 31 Block 8 and-one lat-
<br />southerly side thereof; and one lateral
<br />said -center line of -Redwood avenue,
<br />extended to center of Oak, avenue and
<br />eral at line dividing lots 82 and 38
<br />at dividing line of lots 6 and 6 Block
<br />which manhole is to be, constructed;
<br />extending southerly to the center line
<br />Block 3 and one lateral at line dividing
<br />6 and one.lateral at .line. dividing lots
<br />' that brick manholes with cast Iron
<br />of Junipero avenue and to connect
<br />lots 34 and 86 Block 8 and lateral
<br />7 and 8 'Block 6 and one lateral at
<br />frames and •covers be constructed on
<br />r!`
<br />w manholes to, be constructed at
<br />,one
<br />at line dividing lots. S6',and 37 Block
<br />line dividing lots 9 and 10 Block 6
<br />.Norman street at the following plac-
<br />center line of Oak avenue and center
<br />3 and one lateral at, llne dividing lots
<br />and one lateral atlinedividing lots 11
<br />es, to-wit: .one an the center line of
<br />line of Junipero avenue, Ramona av,
<br />38 and 39 Block 3,-And one lateral at
<br />and 12 Block 6 and one lateral at line
<br />said street at a point -26 feet westerly
<br />from 'of
<br />enue, Sequoia avenue at center line
<br />of, Sierra street extended to
<br />line Pdividing lots 40' and 41 $look 8
<br />115
<br />dividing lots 18 and 14 Block 6,and one
<br />the easterly end said street;
<br />centr line
<br />all as shown on )Hat mantioned map,
<br />lateral a_ t line dividing lots
<br />and one manhole on the center line of
<br />of Oak avenue, that brlcko manholes
<br />and all extending' from main sower-
<br />and 16 Block 6• -and one
<br />said street at a point 200 Yeet westerly
<br />with cast Iron frames and covers be
<br />in the center of said avenue to prop- .lateral
<br />at line dividing lots 17
<br />from the easterly end of said street;
<br />constructed on Oak avenue at the fol-
<br />arty line on the southerly side* thereof; :and
<br />18 Block 6 and one lateral at line
<br />that four (4) Inch salt glazed tile pipe'
<br />lowing places, to-wit: one manhole on
<br />,and one lateral at line dividing lots
<br />dividing lots 19 and 20, Block 6 and one
<br />sewer laterals,. 24 feet in length be con-
<br />center line of Oak avenue at center
<br />10 and 11 Block 4 and one lateral at
<br />lateral at line dividing lots 21 and 22
<br />structed on Norman street from the
<br />Jlne Sierra street extended to the
<br />line dividing lots 12 and 13 Block 4. !
<br />Block 6 and one lateral at line divid-
<br />Main sewer in the center of the street
<br />center line of Oak avenue; one on cen-
<br />and one lateral at line divlding lots
<br />Ing lots 23 and 24 Block 6 and one
<br />to the property lines on both sides of
<br />'ter line of Oak avenue at center lino
<br />14 and 16 Block A and one lateral at '
<br />lateral at line dividing lots 26 and 26
<br />said street at the following places, to-
<br />of Sequoia avenue; one on Oak avenue
<br />tine dividing lots 16 and 19 Block 4
<br />Blocic 6 and one lateral extending from
<br />wit: one lateral to line dividing lots
<br />at center Mlle o1 Ramona avenue; and
<br />and one lateral at line dividing lots
<br />the main sewer in the center of said
<br />30 and 31 Block 2' and one lateral to line
<br />one on Oak avenue -at center line of
<br />18 and 19 Block 4 and 'one lateral at
<br />avenue'to Lot 27 Block 6 all ae. shown
<br />_dividing tots, 32 and 33 Block 2 and one
<br />Junipero avenue; that four (4) Inch
<br />line dividing lots 20 and 21 Block 4
<br />on the last mentioned map, and all ex-
<br />lateral to Ilse dididing Mata 34 and 36
<br />salt glazed Lite pipe sewer laterals be
<br />and one lateral at line "di-
<br />tending from the main newer 1n the
<br />;Block 2 and one lateral to line d)vld-
<br />constructed on Oak avenue, 28 feet
<br />viding lots 22 and 23' Block
<br />center of said Sequoia avenue to the
<br />' Ing lots 36 and 37 Block 2 and one
<br />in length, and extending from the
<br />4 -and one lateral at line dlyid-
<br />property line on the northerly side
<br />I lateral to line dividing Iota 38 and 39
<br />main sewer In the center of said av-
<br />Ing lots' 24 and 26 Block 4, and one
<br />thereof; and an the' hereinbefore des-
<br />Block 2-and one lateral to line divid-)
<br />snug to the property lilies on both
<br />lateral at line dividing lots 26 and 27
<br />cribed laterals on Sequoia avenue are
<br />Ing lots 40 and 41 Block 2 all an Shown
<br />Bides of said avenue at the following
<br />Block 4 and one lateral at line divid-
<br />toje connected to the main sewer in
<br />on last mentioned map and all extend-
<br />places, to-wit- one lateral at line di-,Ing
<br />lots 28 and .!29 Block 4 and One
<br />the center of, Said avenue with six (6)
<br />i Ing from main sewer to northerly prop-
<br />viding lots' 1 and 2 °Block 12 and one
<br />lateral 'at line dividing lots 30 and 81
<br />inch by four (4) inch salt glazed tile' l
<br />' erty]Ine of said Norman street; and one
<br />lateral at line dividing lots 3 and 4
<br />Block and one lateral extending from
<br />pipe Wyss,- a separate Wye being used
<br />lateral extending' from main sewer
<br />Block 12 and one lateral at line di-
<br />main sewer in center of street to lot.
<br />for each lateral,
<br />on. said Norman street to property line
<br />viding lots 6 and 6 Block 12 and one
<br />32 Block 4, all as shown on last men-
<br />That &'six (0 inch salt glazed tile
<br />on southerly aide thereofata point
<br />the
<br />lateral at line dlvidtngt-lots 7 and 8
<br />tioned map. and all of said laterals
<br />from
<br />Pipe newer be constructed along the
<br />110 feet easterly from easterly
<br />Block 12 as shown'on the map of West
<br />extending main sewer in the
<br />center line of Oliver street commene-
<br />line- of Redwood avenue; one, lateral
<br />Redwood; and one lateral at line di-
<br />center, of said avenue to the property
<br />ing at a point 26 feet westerly
<br />to tine divlding lots 46 and 47 Block}
<br />viding lots 1 and 2 Block 11 and one
<br />'line on the northerly, Side thereof; and
<br />front'. the easterly and of said Street
<br />3 and one lateral to line dividing°lots
<br />lateral_ at line dividing lots 3 and 4
<br />all the hereinbefore described laterals
<br />and extending to the center line of
<br />44 and ,46 Block 3 and one lateral to
<br />Block 11 and one lateral at line di-
<br />on Junipero avenue are-to be connect-
<br />Rgoaevelt aVenbe and to connect with
<br />line dividing tota,42 and A3 Block 3 d11
<br />viding Iota 6 and 6' Block 11 and one
<br />ed with the main Hewer in the center
<br />'inch
<br />a jnnnholo to be constructed at fife
<br />as shown on the last'mon'tioned map,
<br />lateral at line dividing lots 7 and 8
<br />of said avenue with six (6) by-
<br />y
<br />beginning of said sewer and-also to
<br />and all extending from main sewer to
<br />and
<br />property line on the southerly side of
<br />Block li as shown on last mentioned
<br />Ileo dlViding--
<br />four (4) Inch salt glazed tile pipe
<br />- "'-' _
<br />connect with a manhole now In place
<br />'avenue
<br />said Norman street; all the herelnbe-
<br />map; and one lateral at
<br />late. 1 and 2 Block 10 and one lateral
<br />Wyss, a separate Wye used for
<br />each lateral. I
<br />at the center line of Roosevelt
<br />� at center line of Oliver strabt extended:
<br />fare described laterals on Norman
<br />to be connected the
<br />at line dividibg lots 3 and 4 Block 10
<br />That n six (e) inch calf glazed file pipe
<br />that brick manholes with cast iron
<br />street arok ,with
<br />main Hewer in the center of said strgot
<br />and one lateral at line dtvtding lots 6
<br />and 6 Block 10 and. one lateral-at line
<br />sewer be,constructed along the cen-
<br />frames and covers be constructed On
<br />Oliver at the following places,
<br />with six (0) inch by four (4) Inch salt
<br />glazed the pipe Wyss, a separate Wye
<br />dividing. lots 7 -and. 81 Block, 10 and
<br />lateral- Iro'm main-sew-
<br />ter, line of Ramona avenue from, the
<br />center line of Oak avenue' to the center
<br />street
<br />to-wit: one manhole on the center line
<br />being used for each lateral',
<br />one extending
<br />er in canter of Oak, avenue tolot,9
<br />line o1 Roosevelt avenue and to con-
<br />of Oliver street at a point 26 feet west-
<br />1 edy from the easterly end of said
<br />That a six (6) inch snit, glazed the
<br />Block 10, all as Shown on last men-
<br />nett with manhole to be constructed
<br />line of Ramona avenue at
<br />street; and One manhole on the center
<br />pipe sewer be constructed along the
<br />tioned map:, and all of 'Sold laterals
<br />at center
<br />center line of avenue and to con-
<br />(line of Oliver street at a point 860 feet
<br />center line-of Oxford street comment-
<br />extending from_ main sewer in center
<br />.Oak
<br />nett with manhole now Ili place at
<br />westerly from the easterly end of Bald
<br />Ing at a point 26 feet westerly from the
<br />of avenue to property .line on the
<br />center line o1 Roosevelt avenue Nat
<br />d
<br />Street; that four (4) inch salt glazeIn
<br />easterly end of said street and extend-
<br />easterly $14.0 thereof; and one lateral_
<br />centereline of Ramona avenue extend.
<br />b sewer laterals,
<br />ing to the center line of Redwood av-
<br />at line dividing lots 27' and 28 Block;
<br />ad; that brick manholes with cast Iron
<br />lengthle
<br />Oliverfeet. et
<br />length be constructed on liStreet
<br />enue and to connect with manhole to
<br />6 and one lateral at line dividing lots-
<br />frames and covers be constructed an
<br />and extending from the mato sewer on
<br />be constructed at point of beginning
<br />29 and 30 Block 6 and one lateral at,
<br />Ramona avenue at the following plan-
<br />said street to the property lines on both
<br />and also to connect with manhole to be
<br />constructed at center line of Redwood
<br />line `dtvtding lots 31 and 32' Block 6
<br />lateral at tine dividing lots 33,
<br />ea, to-wit: one manhole on the center
<br />Idea thereof, at 'the following places,
<br />lino dividing
<br />avenue at denier line of Oxford street
<br />and one
<br />and.34 Block 6 aa;shpwn on last men-j
<br />line of Ramona avenue at a point 246
<br />feet from the westerly line of
<br />to-wit: one lateral at
<br />Iota 3 andel Block 1 and and lateral at
<br />extended thereto; that brick manholes
<br />with cast Iron frames ,and covers be
<br />tioned map; and one lateral at line dl�;
<br />viding lots 31 and 32 Block 6 and one!
<br />westerly
<br />Oak avenue; and one manhole on the
<br />,tine dividing Jots 6 and 7 Block-1 and,
<br />lateral at line dividing, lots 9 aid
<br />constructed on Oxford street at thb
<br />constructed
<br />gateral at line divlding lots 33 anti 34i
<br />-at
<br />center line. of Ramona avenue at a
<br />616 feet westerly from the west-
<br />one
<br />30 flock 1 e line di id-
<br />places, to-wit: one manhole
<br />dock 6• and one lateral line di-
<br />point
<br />four (4) Inch
<br />0 and 1 Block one
<br />Ing lots 10 and 11 Block 1 and one]
<br />on the center line of "said street at a
<br />viding lots 36 and 36 Block 6 and one
<br />38
<br />erlylineof=ayerme;that
<br />tile pipe *sewer laterals,
<br />lateral at line dividing Iota=
<br />point 26 feet westerly from the cast-
<br />lateral at line, dividing lots 37 and
<br />salt glazed
<br />34 feet In length, and extending from
<br />13 Block Y and one lat=
<br />erly end of said street; and one mah-
<br />hole the center line Of said street at
<br />Block 6, all as shown on last men-
<br />tioned map; one lateral at line divid-
<br />the main sewer In the center of Said
<br />12 and
<br />era% at line dividing lots 14 and 16
<br />on
<br />a point 200 feet westerly from the east-
<br />Ing lots 32 and 33 Block 4 and one
<br />avenue to the, property lines on both
<br />Block 1 and one lateral at line deveding
<br />erly end of said street; that, four, (4)
<br />the fat-
<br />lateral at line dividing lots 34 and 36
<br />4 one lateral at line divid-
<br />Sidesthereof becontsructedon Ramona
<br />avenue at the following places,•to-wit:
<br />lots 16 and 17 block 1 and one latera.]
<br />at line dividing lots 18• and 19Block1
<br />inch salt glazed pipe sewer
<br />• Stale 'be constructed on Oxford Street,
<br />Block and
<br />Ing lots -36 and 37 Block 4 and one
<br />one lateral extending from the main
<br />"Hewer to lot 40 Block 4 and one IaterAl
<br />and mne lateral At line dividing Iota
<br />lateral at
<br />24- feet in length and extending from
<br />lateral at line dividing lots 38 and 39-
<br />at life dividing lots 41 and 42 Block
<br />20and 21 Block 1 and one
<br />dividing lots 22 and 23 Block 1 all
<br />the main sewer In the center of the
<br />to the lines on both
<br />Block 4 and one lateral extending
<br />from! main Sewer in center of said Oak
<br />4 and one lateral at Line dividing Iota
<br />line
<br />as shown on map of resubdivlsloq qt
<br />street property
<br />Hides of said street at the following
<br />avenue to lot 40 Block 4 all as Bhown
<br />43 and 44 Block 4 and one lateral at
<br />Block 4
<br />Lot.. 20 o1 the ' Wooster, Whit-
<br />places, to-wit: one lateral at line di-
<br />on last mentioned map, and all
<br />line dividing lots 46 and 46
<br />line 'dividing lots
<br />ton and Montgomery's subdi-
<br />the.
<br />i viding lots 62 and 63 Block 3 and one
<br />line dividing lots 64 and 66
<br />extending from main sewer In the cen-
<br />ter Oak avenue to property
<br />and one lateral at
<br />t'7 and 48 Block 4 and one lateral at
<br />vision of a part Of
<br />Redwood Farm, and all extending from
<br />t lateral at
<br />Black 3 and one lateral at line dividing
<br />of Bald
<br />line on the westerly side -thereof; and
<br />line dividing lots 43 and 6o Block 4.and
<br />Iota 61 and
<br />the main sewer In the center of Bald
<br />lots 56 and 67' Block 3 and one lateral
<br />all • the hereinbefore described laterals
<br />one lateral at lige dividing
<br />4 one lateral at lineae-
<br />atrget to the property Ifno on the
<br />'aide one lat-
<br />• at line,divlding lots 68 and 69 Block 3
<br />on Oak avenue are to be connected
<br />62 Block and
<br />lots 63 and 54 Block 4 and ane
<br />northerly thereof; and
<br />dividing Iota 22 and 21!
<br />and ode lateral at line dlvidfng lots
<br />- lateral
<br />with the main sewer on said avenue
<br />inch by four (4)
<br />viding
<br />lateral at line dividing Iota 66 and 66
<br />oral at line
<br />Block 2 and onA lateral at line divlding
<br />66 and 61 Block 3 and one at
<br />line dividing lots 62 and 03 Block 3 all
<br />with six (6) "inch
<br />salt•glazed tile pipe Wyss, a Separate
<br />Block 4 and one lateral at line .dividing
<br />lots 20 and 19 Block 2 and one lateral
<br />ias shown on last mentioned map. and
<br />in cen-1
<br />WYe being used for each ,lateral,
<br />(6) Inch Balt glazed tile
<br />.tots 67 and 68 Block 4 and one lateral
<br />at line dividing lots=69 and 60�_Block L
<br />at line dividing tots 18 and 17 BI ck 2
<br />and one lateral at lino dividing Iota 16
<br />all extending, from males¢Wer
<br />ter of street to the property line on the(
<br />That a six
<br />pipe sewer be constructed along the
<br />and one. lateral at line dividing lots
<br />9 as shown on
<br />and 15 Mock 2 and one lateral at line,
<br />2
<br />northerly Hide thereof; and onelateral
<br />at line dividing lots 64•and 66 Slock'4{
<br />center line, of Sierra street from the
<br />center line of Redwood avenue to the
<br />61 and 62 Block .all
<br />last mentioned malt, .and all extending
<br />dividing lots 14 and 12 Block and one
<br />lateral at line dividing lots Y2 and 11
<br />and one lateral at line dividing lots!
<br />center Ihle of Oak avenue and to con-'
<br />i from mhln sewer In`the center of said
<br />the
<br />Block 2 and one lateral at line diVid-
<br />I66 and 67 Block 4 and one lateral at,,
<br />nett with a manhole to be•constructed;:
<br />avenue to property line on south-
<br />lateral at
<br />Ing lots SO and 9 Black 2 and and )at-
<br />line dividing lots 68� and 69 Slack 4 and i
<br />dividing 70
<br />at center line of Redwood avenue and
<br />Sierra Street extendedo
<br />arty aide thereof; and' one
<br />line dividing lots 9 and to Block 6 and
<br />oral at line dividing lots 8 and 7 Block
<br />2 and one lateral at line dividing tots
<br />one lateral at line lots ands
<br />71 Block 4 and one lateral at line di-'
<br />center line of
<br />also to connect with manhole to be,
<br />one lateral at I(n¢ dividing lots 11 and
<br />'lateral
<br />6 and 6 Block 2 and one lateral at'line
<br />lots 72 and 73 Block 4- and one!
<br />and
<br />constructed at center line of Oak av-
<br />12 Block 6 and one at line di-
<br />dividing Jots. Y and 4, Block 2 all as
<br />viding
<br />ilateral at line dividing lots 74 and 751.
<br />anus at center line of Sierra street ex-
<br />vlding lots 13 and 14 Block 6 and one
<br />line dividing lots 16 and 16
<br />shown on the last mentioned map, and
<br />the main sewer In
<br />Block 4 all as'shown on the last men-'tended;
<br />that a brick manhole with
<br />be con-
<br />lateral at
<br />°i)10eit 6 and one lateral at line dividing
<br />oil extending from
<br />the center of said street to the prop+
<br />tioned map, and all extending from•
<br />'sewer in the of said
<br />cast Iron frame and cover
<br />1 on the center line of Sierra
<br />lots 17 and 18 Block y and one lateral
<br />arty line on the southerly side thereof;
<br />the main center
<br />to the line on the
<br />Strutted
<br />at a point 200. feet west-
<br />at line dividing Iota 19 and 20 Black
<br />and all of bald hereinbefore described
<br />street property
<br />southerly aide thereof; all the herein
<br />street
<br />BAY along the line of said sower from
<br />6 and one lateral at line dividing lots
<br />22 Block 6 and One lateral at
<br />laterals on Oliver street are to be con-
<br />on.. said
<br />before described .laterals on Oxford
<br />the center line 'of Redwood ave"e;
<br />the
<br />21 and
<br />line AlViding late 23 and 24 Block 6
<br />netted With the main'- sewer !
<br />Wth six, ftell by four ,.Inch
<br />street are to be connected with the
<br />In the center" of the street
<br />that four (4), inch Salt glazed
<br />sewer laterals be constructed on
<br />street
<br />and one lateral at .line dividing lots salt glazed tile, pipe wyes, a separate
<br />main sewer
<br />with six (6) inch by four (4) Inch salt
<br />pipe
<br />Sierra street 28 feet in length and ex-
<br />26 and 26 Block.6 and one lateral at
<br />27 wnd 26 Block 6
<br />Wyebeing used for each lateral.
<br />glazed tile pipe wyes, a separate'WYe
<br />tending from the main sewer in the
<br />tine dividing lots
<br />and one lateral at line dividing loth
<br />- That a nix (6) inch Sait glazed the
<br />along the
<br />— _g"used for inch lateral.
<br />bean,.,,,_ _, --�„_,_._..., -„ ,.,._„_._..-..._�.
<br />gent er'_A,f_,safd,,.str-Qat_,tq th(l_vroporty.
<br />9 and 30 Block, wand ong_aategal„ga pica sewer be aonstructed
<br />,,..,�.„.....-...-,-- _ - oenter,teng_oi liafhol.1.¢,.atet cy],ntglenat.
<br />
|