structed at the center line of Redwood
<br />That a six (6) Inch salt glazed tile! tines on Both 'sues thereof, and at
<br />tending 'from main Sewer in osntef of
<br />avenue at center line of May street
<br />''extended
<br />pipe sewer be eomtrueted along the!
<br />the following places, to -writ: one lat-
<br />avenue to lot 31 Block 6 all as shown
<br />thereto; that a brick man- �
<br />hole
<br />center line of Regent street commene-,
<br />eral at line dividing lots 12 and 13
<br />on last mentioned map, and all extend,
<br />with cast iron frame and cover
<br />In at a point 25 feet westerly from'
<br />Block 12 and one lateral at line divid-
<br />Ing from main Sewer In the center of
<br />The constructed on the center line of
<br />the easterly end of saidstreetand ex -1
<br />lots 10 and 11 Block 12 and one later-
<br />said Ramona avenue to property line
<br />May street 25 feet westerly from the
<br />],easterly
<br />tending to the center line of Redwood
<br />al at, line dividing lots 8 Slid '9 Block
<br />on the northerly side thereof; and all
<br />end of said May street; and
<br />avenue and to connect with manhole
<br />12 ae shown on Inst mentioned map,
<br />the hereinbefore described laterals on
<br />also that it brick manhole with cast
<br />to be constructed at said point of be-
<br />and all extending from main sewer In
<br />Ramona avenue are to be connected
<br />Iron frame and cover be constructed
<br />ginning of said sewer and also to con-,
<br />center of street to property line on
<br />with the main sewer In the center of
<br />on the center line of May street 200,
<br />sect with manhole to be constructed at,
<br />the southerly side thereof; and one
<br />said avenue with six (6) Inch by four
<br />feet westerly from the easterly end Of,�ter
<br />cem line of Redwood avenue and'.
<br />lateral at line divlding lots 22 and 23
<br />(4) Inch salt glazed toe pipe wyes, a
<br />said May street; that four (4) inch
<br />salt glazed tile Pipe sewer laterals,
<br />center line of Regent street extended'
<br />Block 13 and one lateral
<br />separate Wye being used for each lat-
<br />24
<br />thereto;, that brick manholes with cast
<br />at line dividing lots 24 and 25
<br />eral,
<br />feet in length be constructed on
<br />May street from the main sewer in
<br />Iron frames and covers be constructed
<br />Block 13 and one lateral at line di-
<br />That a six (6) Inch salt glazed the
<br />the
<br />center of the to the
<br />on Regent street at the following
<br />viding lots 1 and 26 block 13 all as
<br />pipe sewer be constructed along the
<br />street property
<br />lines on both sides of the street the
<br />places, to -wit: one manhole on the
<br />shown on last mentioned map, and all
<br />center line of Sequoia avenue from the
<br />at
<br />following places, to -wit: one lateral
<br />center line of said street at a point
<br />25 feet
<br />extending from main sewer In center
<br />center line of Oak avenue to the center
<br />`., from the main sewer to the property
<br />line the
<br />westerly from the easterly end
<br />thereof; and one manhole on the center
<br />of street to property line on the
<br />northerly side thereof; and all the
<br />line of Roosevelt avenue and
<br />to connect with manhole to be con -
<br />on southerly side of said
<br />line of said street at a Point 200 feet
<br />hereinbefore described laterals on
<br />structed at center line of Oak avenue
<br />street 100 feet easterly from Redwood
<br />westerly from the easterly end there-
<br />Sierra street are to be connected with
<br />and center line of 'Sequoia avenue ex -1
<br />avenue; one lateral to the line divid-
<br />Ing lots 25 and 26 Block 2 lot-
<br />of; that foul, (4) Inch salt glazed the
<br />the main sewer In the center of the i
<br />tended anti also to connect with man-,
<br />and one
<br />pipe sewer laterals, 24 feet to length be
<br />street with six (6) inch by four (4)
<br />hole now in place at center line of;
<br />eras to line dividing lots 23 and 29
<br />constructed on Regent street extendingInch
<br />salt glazed tile pip, w ea, a sap-
<br />t'
<br />Roosevelt avenue and center line, of,
<br />I Block 2 and one lateral to line divid-
<br />from the main sewer In the center o
<br />agate Wye being used foreach lat-
<br />Sequoia avenue extended; that brick
<br />Ing lots 21 and 22 Block 2 anti one lat.
<br />the street to the Oroperty lines at both
<br />eral.
<br />manholes with cast Iron frames and
<br />eral to line dividing lots 19 and 20'
<br />Block 2 and one lateral to line divid-
<br />sides o1 said street at the following
<br />That a (6) Inch salt glazed the pipe
<br />%overs be constructed on Sequoia av-
<br />Ing lots 17 IS Block
<br />places, to -wit: one lateral 'at line
<br />sewer be constructed along the center
<br />enue at the following Places, to -Wit:
<br />and 2 and one
<br />lateral to line dividing lots 15 and 16
<br />dividing lots 34 and 85 Block 4 one
<br />lateral at line dividing lots 86 87
<br />line of Junipero avenue from the cen-
<br />one manhole on the center line of Se -
<br />Block 2 as shown on Dfap of Redwood
<br />and
<br />Block 4 and one lateral at line divid-
<br />ter line of Oak avenue to the center
<br />line of Roosevelt avenue to
<br />quoia avenue at a point 245 feet west.
<br />erly froth the westerly line of Oak
<br />Oaks, and all said laterals running to
<br />Ing lots 88 and 89 Block 4 and one lat-
<br />and con-
<br />noct with manhole to be constructed'
<br />av-
<br />enue; and one manhole_ on the center
<br />the property line on the southerly side
<br />of said May street; and lateral to
<br />eral at line dividing Iota 90 and 91 Block
<br />4
<br />at center line of Oak avenue and cen-t
<br />line of Sequoia avenue at a point 515
<br />one
<br />and one lateral at line
<br />ter line of Junipero avenue and to con -I
<br />feet westerly from the westerly line,
<br />line dividing lots 3 and 4 Block 1 and
<br />dividing lots 92 and 93 Block
<br />nett With manhole now In place ata
<br />of Oak avenue; that four (4) inch salt
<br />one lateral to line dividing lots 5 and
<br />4 and one lateral at line dividing
<br />center line of Roosevelt avenue at can-'
<br />glazed Lila pipe sewer laterals, 34 feet
<br />6 Block I and one lateal to line di-
<br />lots 94 and 95 Block 4 all as shown on
<br />ter line of Junipero avenue extended;{
<br />in length, be constructed on Sequoia
<br />viding lots 7 and 8 Block 1 and one
<br />lateral to line dividing 'lots 9 and 10 ling
<br />last mentioned map, and all extend-
<br />from main sewer in center
<br />that brick manholes with cast iron
<br />avenue and extending from the malty
<br />Block 1 and one lateral to line divid-
<br />of said
<br />street to property line on the norther-
<br />frames and covers be constructed on
<br />Junipero avenue at the following
<br />sewer in the center of said avenue to
<br />the Property lines on each side there-
<br />ing lots 11 and 12 Block 1 and one lat-
<br />1t' side thereof; and one lateral at line
<br />places, to -wit: one manhole on the
<br />of, at the following places, to -wit: one
<br />oral to line dividing lots 13 and 14
<br />Block I all as shown on last mentioned
<br />dividing lots 9G and 97 Block 5 and
<br />one lateral at line dividing lots 98 and
<br />center line of Junipero avenue 245
<br />lateral extending from the main sewer
<br />In
<br />map, and all of said laterals extending
<br />99 Block 5 and one lateral at line di-
<br />feet westerly'from the westerly line of
<br />Oak avenue; the
<br />the center of said avenue to lot 38
<br />Block 5 and one lateral at line divid-
<br />to the property line on the northerly i
<br />i
<br />viding lots 100 and 101 Block and
<br />and one manhole on
<br />center line of Junipero avenue at a
<br />ing lots 39 and 40 Block 5 and one lat-
<br />side of said May street; all the here-
<br />one lateral at line dividing lots 102
<br />point 515 feet westerly from the west-
<br />eral at line dividing lots 41 and 42
<br />before described laterals on May I
<br />and 103 Block 6 and one lateral at line
<br />erly line of Oak avenue; that four (4)
<br />Block 5 and one lateral at line dividing
<br />street are to be connected with the
<br />dividing Iots,104 and 105 Block 5 and
<br />inch salt glazed the pipe sewer lat.
<br />lots 43 and 44 Block 5 and one lat-
<br />main sewer in the center of said street
<br />one lateral at line dividing lots 106
<br />erals, 34 feet in length, and extending
<br />oral at line dividing lots 45 and 46
<br />with six (6) inch by four (4) inch salt
<br />and 107 Block 5 all as shown on last
<br />from the main sewer in the center of
<br />Block 5 and one lateral at line dividing
<br />glazed Life Pipe wyes, a separate Wye
<br />being used for each lateral,
<br />mentioned map, and all extending'
<br />from main sewer in the center of salt]
<br />the avenue to the property lines on
<br />lots 47 and 48 Block 5 and one tater-
<br />That a six (6) Inch salt glazed tile'
<br />street to Property line on the south -I
<br />both sides thereof be constructed on
<br />Junipero avenue at the followings
<br />al at line dividing lots 49 and 50 Block
<br />pipe sewer be constructed along the
<br />Orly side thereof; all the hereinbefore!
<br />places, to -wit: one lateral extending
<br />5 and one lateral at line dividinglots
<br />51 and 52 Block 5 and one laterl at
<br />center line of Norman street commene-
<br />dseribed laterals on Regent ) street
<br />1
<br />to the property line of lot 19 Block'
<br />line dividing lots 53 and 54 Block 5
<br />Ing at a Point 25 feet westerly from,
<br />are to be connected with the main
<br />'3 and one lateral at line dividing lots land
<br />one lateral at line dividing lots 65
<br />the easterly end of said street and ex -sewer
<br />I
<br />in the center of said street with
<br />six (6) inch by four (4) Inch salt
<br />20 and 21 Block3 and one lateral at
<br />and 66 Block 5 and one lateral at line
<br />ad
<br />tending to the center line of Redwood
<br />avenue to
<br />glaz-
<br />ed tile pipe Wyss, a separate Wye being
<br />line dividing lots 22 and 23 Blocir 3 I
<br />lateral line dividing 241
<br />1"lot%-, 57 and 68 Block 5 and
<br />and connect with a man-
<br />used for each lateral.,
<br />and one at lots
<br />one lateral at line dividing lots 59 and
<br />hole to,be constructed at the point of
<br />and 25 Block 3 and one lateral at line j
<br />60 Block 5 all as shown on the last
<br />beginning of said sewer and als , to
<br />That a six (6) inch salt glazed tile
<br />dividing lots 26 and 27 Block 3 and one I
<br />mentioned map and all extending from
<br />connect with a manhole at the center
<br />nine sewer be constructed along the
<br />lateral at line dividing lots 28 and 29'
<br />the main sewer in the center of the
<br />line of Redwood avenue at the con. 'I
<br />center line of Oak avenue commene-
<br />Block 3 and one lateral at line divid-
<br />said avenue to the property line on the
<br />ter line of Norman street extended to
<br />ing at the center line,of Sierra street
<br />Ing lots 30 and 31 Block 3 andonc tat -II
<br />southerly side thereof; and one lateral'
<br />said ,center line of Redwood avenue,
<br />extended to center of Oak avenue and
<br />oral at line dividing lots 32 and 33I
<br />at dividing line of lots 5 and 6 Block
<br />which manhole is to be constructed;,
<br />extending southerly to the center line
<br />Block 3.and one lateral at line dlviding{ll
<br />6 and one lateral at line dividing lots
<br />• that brick manholes with cast Iron)
<br />of .,Junipero avenue and to connect
<br />lots 34 and 35 Block 3 and one lateral,
<br />7 and 8 Block 6 and one lateral at
<br />frames and covers be constructed on
<br />with manholes to be constructed at
<br />at line dividing lots '36 -and 37 Block
<br />line dividing lots 9 and 10 Block 6
<br />Norman street at the following plac-1
<br />center line of Oak avenue and center
<br />3 and one lateral at line dividing IOtSI
<br />and one lateral at line dividing lots 11
<br />es, to -wit: one on the center line of
<br />line of Junipero avenue, Ramona av-
<br />38 and 39 Block 3 and one lateral nil
<br />and 12 Block 6 and one lateral at line
<br />salt] street at a point 25 feet westerly
<br />enue, Sequoia avenue at center line
<br />line dividing lots 40' and 41 Block 3
<br />dividing lots 13 and 14 Block 6•and one
<br />from the easterly end of said street;
<br />of Sierra street extended to centr line
<br />all as shown on last mentioned map,
<br />lateral at line dividing lots
<br />and one manhole on the center line of
<br />of Oak avenue; that brick manholes
<br />and all extending from main sewer)
<br />15 and 16 Block C and one
<br />said street at a point 200 feet westerly
<br />with cast Iron frames and covers be
<br />In tine center of said avenue to prop-�
<br />lateral at line dividing lots 17
<br />from the easterly end of said street;
<br />constructed on Oak avenue at the fol-
<br />arty line on the southerly side thereof;,
<br />and 18 Block 6 and one lateral at line
<br />that four (4) Inch salt glazed tile piper
<br />lowing places, to -wit: one manhole on
<br />and one lateral at line dividing lots
<br />dividing lots 19 and 20 Block 6 and one
<br />sewer laterals, 24 feet in length be con-
<br />{ center line of Oak avenue at center
<br />10 and 11 Block 4 and one lateral at
<br />lateral at line dividing Iota 21 and 22
<br />structed on Norman street from the
<br />line Sierra street extended to the
<br />line dividing lots 12 and 13 Block4
<br />Block6 and one lateral at line divid-
<br />main sewer in the center- of the street
<br />center line of Oak avenue; one on cen-
<br />and one lateral at line dividing lots
<br />Ing lots 23 and 24 Block 6 and one
<br />Ito the property lines on both sides of
<br />ter line of Oak avenue at center line!
<br />14 and 35 Block 4 and one lateral at,
<br />lateral at line dividing lots 25 and 26
<br />said street at the following places, to-
<br />of Sequoia avenue; one on Oak avenue
<br />line dividing lots 16 and 17 Block 4'
<br />Block 6 and one lateral extending from
<br />wit: one lateral to line dividing lots
<br />at center line of Romona avenue; and
<br />and one lateral at line dividing lots
<br />the main sewer to the center of said
<br />30 and 31 Block 2 and one lateral to line
<br />one on Oak avenue at center line of
<br />1S and 19 Block 4 and one Interal lit
<br />'avenue -to Lot 27 Block 6 all as. shown
<br />` dividing lots 32 and 33 Block 2 and one
<br />Junipero avenue; that four (4) inch
<br />line dividing lots 20 and 21 Block 9
<br />on the last mentioned map, and all ex -
<br />lateral to line didittng lots 34 and 35
<br />salt glazed the pipe sewer laterals be
<br />and one lateral at line dl -
<br />tending from the main sewer in the
<br />Block 2 and one lateral to line divid-
<br />constructed on Oak avenue, 28 feet
<br />viding lots 22 and 23 Blockl
<br />center of said Sequoia avenue to the
<br />ing lots 36 and 37 Block 2 and one
<br />in length, slid extending from the
<br />4 and one lateral at line divid-1
<br />property line on the northerly side
<br />lateral to line dividing lots 38 and 39
<br />main sewer in the center o[ said av-
<br />Ing lots 24 and 26 Block 4 • and one]
<br />thereof; and ¢71 the hereinbefore des -
<br />lBlock 2 and one lateral to line divid-
<br />enue to the property lines on both
<br />lateral at line dividing lots 26 and 27
<br />cribed laterals on Sequoia avenue are
<br />i ing lots 40 and 41 Block 2 all as shown)
<br />sides of said avenue at the following
<br />Block 4 find one lateral at line divid-
<br />to_be connected to the main sewer in
<br />Ion last mentioned map and all extend-
<br />places, to -wit: one lateral at line dl-.
<br />Ing lots 28 and 29 Block 4 and one
<br />the center of said avenue with six (6)
<br />Ing from main sewer to northerly prop-
<br />viding lots 1 and 2%lock 12 and one
<br />lateral at line dividing lots 30 and 31
<br />Inch by four (4) inch salt glazed the
<br />e•tyline of said Norman Street; and one
<br />lateral at line dividing lots 3 and 4
<br />Block 4 and one lateral extending from
<br />pipe Wye$, a separate Wye being used
<br />lateral extending from main sewer
<br />Block 12 and one lateral at line dl-
<br />main $ewe• In center of street to lot
<br />for each lateral.
<br />on said Norman street to property line
<br />viding lots 5 and 6 Block 12 and one
<br />32 Block 4, all as shown on last men-
<br />That a six (0} Inch salt glazed the
<br />on southerly side thereof at a point
<br />lateral at lino dividing lots 7 and 3
<br />ttoned map, and all of said laterals
<br />-pipe sewer be constructed along the
<br />110 feet easterly from tine easterly
<br />Block 12 as showwon tine map of }Vest
<br />extending from main sewer in the
<br />center line of Oliver street nommene-
<br />line of Redwood avenue; one lateral
<br />Redwood; and one lateral at line di-
<br />center of ,said avenue to the property
<br />Ing at a point 25 feet westerly
<br />to line dividing lots 46 and 47 Block
<br />viding lots 1 and 2 Block 11 and one
<br />line on the northerly side thereof; and
<br />fronx.the easterly end of said street'
<br />3 and one lateral to line dividing Iota
<br />lateral at line dividing lots 3 and 4
<br />all the hereinbefore described laterals
<br />i
<br />and extending to the center line of
<br />i94 and 45 Block 3 and one lateral to
<br />(Block 11 and one interni at Ilse dl-
<br />on on avenue are oto be connect-
<br />Roosevelt avenue and to connect with
<br />line dividing lots 42 and 42 Block 3 all
<br />viding lots 5 and 6 Block It and one
<br />I ed with the main sewer In the center
<br />a mantels to be constructed at the
<br />as shown on the last mentioned map,
<br />lateral at line dividing lots 7 and 8
<br />of said avenue with six (6) inch by
<br />id sewer
<br />beginning o1 said sewer and also to
<br />and all extending from main sewer to
<br />Block 11 as shown on last mentioned
<br />tour (4) Inch salt glazed the Pipe
<br />connect with a now is pinta
<br />property line on the southerly side of
<br />map; and one lateral at line dividing
<br />n separate wYe being used for
<br />at the center ]ilia o1 Roosevelt avenue
<br />said Norman street; all the hereinbe-,
<br />)ons 1 and 2 Block 30 and one lateralwyes,
<br />each lateral.
<br />at center line of Oliver street extended;
<br />fore described laterals on Norman
<br />to be connected with the
<br />at line dividing lots 3 and 4 Block 10
<br />That n Six (C) Inch salt glazed fife Pine
<br />that brick manholes with cast Iron
<br />street are
<br />main sewer in the center of said street
<br />and one lateral at line dividing lots 6
<br />Block 10 lateral at line
<br />sewer be constructed along the con-
<br />frames and covers be constructed on
<br />with six (G) Inch by Lour (4) Inch Salt'
<br />and 6 and one
<br />dividing lots 7 -and 8 Block 10 slid
<br />ter line of Ramona avenue from the
<br />Oliver street at the following places,
<br />to one manhole on the center line
<br />glazed tile pipe wyes, a separate Wye
<br />one lateral extending from main new.
<br />cents- line of Oak avenue to the center
<br />to
<br />-wit:
<br />of Oliver street at a point 25 feet west -
<br />beim; used for each lateral.
<br />e• in center of Oak avenue to lot 9
<br />line of Roosevelt avenue and con-
<br />to be constructed
<br />erly from the easterly end of said
<br />That a six (6) inch salt glazed the
<br />Block 10, all as Shown on last men-
<br />nett with manhole
<br />at center line of Ramona avenue at
<br />street; and one manhole on the center
<br />pipe sewer be constructed along the
<br />toned map, and all of said laterals
<br />line of Onk avenue and to con-
<br />line of Oliver street at a point 360 feet
<br />conte• line of Oxford street commene-,
<br />extending from main sewer In center
<br />center
<br />now In Place st
<br />westerly from the easterly end of said
<br />Ing at a point, 25 feet westerly from the
<br />of avenue to property line on the
<br />, sect with manhole
<br />line of Roosevelt avenue at
<br />street; that four (4) Inch salt glazed
<br />easterly cud of said street and extend-
<br />easterly side thereof; and one lateral
<br />center
<br />conte• line of Ramous avenue extend-
<br />,tile pipe sewer laterals, 28 feet In
<br />Ing to the center line of Redwood av-
<br />at line dividing lots 27 and 28 Block
<br />'
<br />ed; that brick manholes with cast Iron
<br />' length be constructed on Oliver street
<br />Ienue and to connect with manhole to
<br />6 and one lateral at line dividing lots
<br />frames and covers be constructed on
<br />and extending from the main sewer on
<br />(be constructed at Point of beginning!
<br />29 and 30 Block 6 and one lateral at
<br />Ramona avenue at the following nine-
<br />amid street to the property Imes both
<br />II and also to connect with manhole to beI
<br />,constructed at center line of Redwood
<br />line dividing lots 31 .and 32 Block 6
<br />lateral at line dividing lots 33
<br />es, to -wit: one manhole on the center
<br />sides thereof, at the following places,
<br />p
<br />divlding
<br />avenue at center line of Oxford street
<br />and one
<br />,and 34 Block 6 as shown on last men-
<br />line of Ramona avenue at a point 245
<br />feet westerly from the westerly line. of
<br />to -wit: one lateral at ]Ise
<br />lots 3 and -4 Block 1 and one lateral of
<br />extended thereto; that brick manholes
<br />toned man; and one Interal-at line di-
<br />Oak and one manhole- on the
<br />.line dividing lots 6 and 7 Block 1 and
<br />with asst Iron frames and covers be
<br />viding lots 31 and 32 Block 5 and one
<br />avenue;
<br />Ramona avenue at n
<br />one latera] at line dividing lots 9 and,
<br />constructed on Oxford street at the
<br />- lateral at line divJding lots 33 anid 34
<br />center line of
<br />Mr, feet westerly from the west-
<br />ater
<br />10 Block 1 and one lateral -at line divid-?
<br />following places, to -wit: one manhole
<br />' Block 5 and one lateral at line di-
<br />`viding
<br />point
<br />Orly line of Oak avenue; that foul- (4) Inch
<br />Ing lots 10 and 11 Block 1 and one'
<br />on the center line of said street at ¢
<br />lots 36 and 3G Block fi and one
<br />the pipe sew s• Laterals,
<br />lateral at line dividing Ipte�
<br />point 25 feet westerly from the east-
<br />- lateral at line dividing lots 37 and 38
<br />'
<br />salt glazed
<br />34 feet in length, and extending from
<br />1 and one �lat-
<br />erly end of said street; and one man-
<br />Block 6 all as shown on last men-
<br />divid-
<br />the main Sewer in the center of said
<br />12 and 13 131001t
<br />dividing lots 14 and 15
<br />hole on the center line of said street at
<br />• a point 200 feet westerly from the east-
<br />• ttoned map; one lateral at line
<br />° ing lots 32 and 33 Block 4 and one
<br />avenue to the property lines on both
<br />oral at line
<br />Blocic 1 and one lateral at line dividing
<br />erly end of said street; that four (4)
<br />;lateral at line dividing lots 34 and 35
<br />sidesthereof becontsructedon Ramona
<br />lots 16 and 17 Block 1 and one lateral
<br />Inch salt glazed tile pipe sewer-
<br />avenue it the following places, to -wit:
<br />at line dividing lots 38 and 19 Block
<br />erals be constructed on Oxford street,
<br />I Ing lots 36 and 37 Block 4 and one
<br />one lateral extending from the main
<br />40 Block 4 and one lateral
<br />and one lateral at line dividing lots
<br />lateral at
<br />24 fret in length and extending from
<br />the
<br />!lateral at line dividing lots 38 and 39
<br />'Block lateral extending
<br />sewer to lot
<br />at line dividing lots 41 and 42 Block
<br />20 and 21 Block I and one
<br />dividing lots 22 and 23 Block 1 all
<br />the main sewer in the center of
<br />street to the property lines on both
<br />4 and one
<br />; from; main sewer in center of sold Oak
<br />4 and ane lateral at line dividing lots
<br />line
<br />as shown on map of resubdlvi$ion of
<br />sides of said street at the following
<br />- avenue to lot 40 Block 4 all as shown
<br />43 and 44 Block 4 and one lateral at
<br />4
<br />Lot 20 of the l,_Vooster, lVhit-
<br />places, to -wit: one lateral at line di-
<br />son last mentioned map, and all
<br />line dividing lots 46 and 46 Block
<br />ton anti Dlontgomery^s subdi-
<br />viding lots 52 and 53 Block 3 and one
<br />extending from main sewer in the cen-
<br />and one lateral at line dividing lots
<br />vision Of a part of .,the
<br />lateral at line dividing lots 54 and 55
<br />ter of said Oak avenue to property
<br />47 and 48 Block and one lateral at
<br />lots 49 and 50 Block 4 and
<br />Redwood Farm, and all extending from
<br />of Bald
<br />Block 3 and one lateral at line dividing
<br />line on the westerly side thereof; and
<br />line dividing
<br />line dividing lots 61 anti
<br />the main sewer in the center
<br />line on the
<br />lots 56 and 57 Block3 and one lateral
<br />all the hereinbefore described laterals
<br />one lateral .,it
<br />lateral at line dl-
<br />street to the property
<br />lat-
<br />• at line dividing lots 58 and 59 Block 3
<br />1 on Oak avenue are to be connected
<br />52 Block 4 and one
<br />lots 53 and 54 Block 4 and one,
<br />northerly Side thereof, and one
<br />lots 22 and 21
<br />and one lateral at line dividing lots
<br />Interal
<br />with the main sewer on said avenue
<br />Inch by four (4) Inch
<br />viding
<br />lateral at line dividing lots 55 and 56
<br />oral at line dividing
<br />Blockand one lateral at iinedivlding
<br />60 and 61 Block 3 and one at
<br />IInG dividing lots G2 and G3 Block 3 all
<br />with six (6)
<br />salt glazed file Pipe wyes, a separate'
<br />Block 4 and one lateral at line dividing
<br />.2
<br />lots 20 and 19 (hock 2 and one lateral
<br />Be shown on last mentioned map, and
<br />Wye being used for each lateral.
<br />' tiles
<br />lots 57 and 68 Block 4 and one (sterni
<br />line dividing lots 59 and Go Block 4
<br />at line dividing lots 18 and, 1.7 BI ck 2
<br />line dividing lots 1G
<br />all extending from main sewer in con-
<br />That a six (6) Inch salt glazed
<br />the
<br />at
<br />find one lateral at line dividing lots
<br />,and one lateral at
<br />n 'Block 2 and one lateral at line
<br />ter of Street to the property' line on the
<br />pipe sewer be constructed along
<br />from the
<br />61 and G2 Block 4 all as shown on
<br />and It;
<br />dividing lots 14 and 13 Block 2 and one
<br />northerly side thereof; and one lateral
<br />line dividing lots 64 anti G5 Block 4
<br />center line of Sierra street
<br />line of Redwood avenue to the
<br />last mentioned malt, and all extending
<br />lateral at line dividing letB 12 and Il
<br />at
<br />lateral at line dividing lots
<br />center
<br />center line of Oak avenue and to con-
<br />from main sewer in ,the center of said
<br />Block 2 and one lateral at line divid-
<br />and one
<br />66 67 Block 4 and one lateral at
<br />pact with a manhole to be constructed
<br />avenue to property lineoil the South-
<br />'Ing lots 10 and 9 Block 2 and one lat-
<br />and
<br />line dividing lots CS and 69 Block 4 and
<br />at center line of Redwood avenue and
<br />Orly side thereof; and one ]Steal atd
<br />line dividing lots 9 and 10 Shock 6 and
<br />oral at line dividing lots 8 and 7 Block
<br />'2 at line dividing lots
<br />one Lateral at line dividing lots 70 and
<br />lateral at line di-
<br />center line of Sierra street extended,
<br />to connect with manhole to be
<br />one lateral at line dividing lots 11 and
<br />and one lateral
<br />6 and 5 Block 2 and one lateral at line
<br />71 Block 4 and one
<br />viding lots 72 and 73 Block 4 and one
<br />and also
<br />constructed at center line of Oak av-
<br />12 Block 5 and one lateral at line dl-'
<br />lots 13 and •14 Block 6 and one
<br />dividing lots S and 4 Block 2 all as
<br />last map. and
<br />lateral at line dividing lots 74 and 75
<br />enue at center line of Sierra street ex-�,
<br />a brick manhole with,;
<br />viding
<br />at line dividing lots 15 and 16'
<br />Shown on the mentioned
<br />from the main sewer in
<br />Bldek 4 all as shown on the Inst men-
<br />tended; that
<br />be con -1
<br />rlateral
<br />Block 5 and one lateral at 11ne dividing'
<br />all extending
<br />the of said street the Prop -
<br />ttoned map, and all extending from
<br />in the center of said
<br />cast Iron frame and cover
<br />'structed on the center line of Slerra
<br />Iota 17 and 18 Block 6 and oma lateral
<br />center
<br />Bi
<br />arty line on the southerly side thereof;
<br />the main sewer
<br />'street line the
<br />200 feet west-,
<br />at line dividing lots 19 and 20 Block'
<br />and all of said hereinbefore described
<br />to the property on
<br />side thereof; all the herein-
<br />street at a point
<br />I.ly along the line of said sewer from
<br />5 and one lateral at line dividing lotsi
<br />laterals on Oliver street are to be con -
<br />southerly
<br />before described laterals on Oxford,
<br />the center line of Redwood avenue;�i
<br />21 and 22 Block 5 and one lateral at;
<br />24 Block 5'
<br />nected with the main sewer on said
<br />street are to ins connected with the.,
<br />that tour (4) Inch salt glazed the
<br />line.dlviding lots 23 and
<br />dividing lots
<br />Street wth six 44nch by four .Inch
<br />main sewer In the center of the street,
<br />pipe sewer laterals be constructed onl
<br />and one lateral at line
<br />(Sacral at
<br />salt glazed the pipe wyes, a separate
<br />with six (G) inch by Your (4) Inch salt
<br />Sierra street 28 feet In length and ex-
<br />20 and 26 Block 5 and one
<br />27 28 Block 6
<br />Wye being used for each lateral.
<br />glazed' fila pipe nvyeS, a separate wYe
<br />tending from the main sewer in the
<br />line dividing lots and
<br />line dividing Iota
<br />That a six (6) Inch salt glazed tile;
<br />being used for each lateral.
<br />11 center of said street to the propenyl
<br />and one lateral at
<br />129 and 30 Block 5 and one lateral ex-
<br />pipe sewer be constructed along the
<br />center Line of Ramona street commene-1
<br />
|