Laserfiche WebLink
structed at the center line of Redwood <br />That a six (6) Inch salt glazed tile! tines on Both 'sues thereof, and at <br />tending 'from main Sewer in osntef of <br />avenue at center line of May street <br />''extended <br />pipe sewer be eomtrueted along the! <br />the following places, to -writ: one lat- <br />avenue to lot 31 Block 6 all as shown <br />thereto; that a brick man- � <br />hole <br />center line of Regent street commene-, <br />eral at line dividing lots 12 and 13 <br />on last mentioned map, and all extend, <br />with cast iron frame and cover <br />In at a point 25 feet westerly from' <br />Block 12 and one lateral at line divid- <br />Ing from main Sewer In the center of <br />The constructed on the center line of <br />the easterly end of saidstreetand ex -1 <br />lots 10 and 11 Block 12 and one later- <br />said Ramona avenue to property line <br />May street 25 feet westerly from the <br />],easterly <br />tending to the center line of Redwood <br />al at, line dividing lots 8 Slid '9 Block <br />on the northerly side thereof; and all <br />end of said May street; and <br />avenue and to connect with manhole <br />12 ae shown on Inst mentioned map, <br />the hereinbefore described laterals on <br />also that it brick manhole with cast <br />to be constructed at said point of be- <br />and all extending from main sewer In <br />Ramona avenue are to be connected <br />Iron frame and cover be constructed <br />ginning of said sewer and also to con-, <br />center of street to property line on <br />with the main sewer In the center of <br />on the center line of May street 200, <br />sect with manhole to be constructed at, <br />the southerly side thereof; and one <br />said avenue with six (6) Inch by four <br />feet westerly from the easterly end Of,�ter <br />cem line of Redwood avenue and'. <br />lateral at line divlding lots 22 and 23 <br />(4) Inch salt glazed toe pipe wyes, a <br />said May street; that four (4) inch <br />salt glazed tile Pipe sewer laterals, <br />center line of Regent street extended' <br />Block 13 and one lateral <br />separate Wye being used for each lat- <br />24 <br />thereto;, that brick manholes with cast <br />at line dividing lots 24 and 25 <br />eral, <br />feet in length be constructed on <br />May street from the main sewer in <br />Iron frames and covers be constructed <br />Block 13 and one lateral at line di- <br />That a six (6) Inch salt glazed the <br />the <br />center of the to the <br />on Regent street at the following <br />viding lots 1 and 26 block 13 all as <br />pipe sewer be constructed along the <br />street property <br />lines on both sides of the street the <br />places, to -wit: one manhole on the <br />shown on last mentioned map, and all <br />center line of Sequoia avenue from the <br />at <br />following places, to -wit: one lateral <br />center line of said street at a point <br />25 feet <br />extending from main sewer In center <br />center line of Oak avenue to the center <br />`., from the main sewer to the property <br />line the <br />westerly from the easterly end <br />thereof; and one manhole on the center <br />of street to property line on the <br />northerly side thereof; and all the <br />line of Roosevelt avenue and <br />to connect with manhole to be con - <br />on southerly side of said <br />line of said street at a Point 200 feet <br />hereinbefore described laterals on <br />structed at center line of Oak avenue <br />street 100 feet easterly from Redwood <br />westerly from the easterly end there- <br />Sierra street are to be connected with <br />and center line of 'Sequoia avenue ex -1 <br />avenue; one lateral to the line divid- <br />Ing lots 25 and 26 Block 2 lot- <br />of; that foul, (4) Inch salt glazed the <br />the main sewer In the center of the i <br />tended anti also to connect with man-, <br />and one <br />pipe sewer laterals, 24 feet to length be <br />street with six (6) inch by four (4) <br />hole now in place at center line of; <br />eras to line dividing lots 23 and 29 <br />constructed on Regent street extendingInch <br />salt glazed tile pip, w ea, a sap- <br />t' <br />Roosevelt avenue and center line, of, <br />I Block 2 and one lateral to line divid- <br />from the main sewer In the center o <br />agate Wye being used foreach lat- <br />Sequoia avenue extended; that brick <br />Ing lots 21 and 22 Block 2 anti one lat. <br />the street to the Oroperty lines at both <br />eral. <br />manholes with cast Iron frames and <br />eral to line dividing lots 19 and 20' <br />Block 2 and one lateral to line divid- <br />sides o1 said street at the following <br />That a (6) Inch salt glazed the pipe <br />%overs be constructed on Sequoia av- <br />Ing lots 17 IS Block <br />places, to -wit: one lateral 'at line <br />sewer be constructed along the center <br />enue at the following Places, to -Wit: <br />and 2 and one <br />lateral to line dividing lots 15 and 16 <br />dividing lots 34 and 85 Block 4 one <br />lateral at line dividing lots 86 87 <br />line of Junipero avenue from the cen- <br />one manhole on the center line of Se - <br />Block 2 as shown on Dfap of Redwood <br />and <br />Block 4 and one lateral at line divid- <br />ter line of Oak avenue to the center <br />line of Roosevelt avenue to <br />quoia avenue at a point 245 feet west. <br />erly froth the westerly line of Oak <br />Oaks, and all said laterals running to <br />Ing lots 88 and 89 Block 4 and one lat- <br />and con- <br />noct with manhole to be constructed' <br />av- <br />enue; and one manhole_ on the center <br />the property line on the southerly side <br />of said May street; and lateral to <br />eral at line dividing Iota 90 and 91 Block <br />4 <br />at center line of Oak avenue and cen-t <br />line of Sequoia avenue at a point 515 <br />one <br />and one lateral at line <br />ter line of Junipero avenue and to con -I <br />feet westerly from the westerly line, <br />line dividing lots 3 and 4 Block 1 and <br />dividing lots 92 and 93 Block <br />nett With manhole now In place ata <br />of Oak avenue; that four (4) inch salt <br />one lateral to line dividing lots 5 and <br />4 and one lateral at line dividing <br />center line of Roosevelt avenue at can-' <br />glazed Lila pipe sewer laterals, 34 feet <br />6 Block I and one lateal to line di- <br />lots 94 and 95 Block 4 all as shown on <br />ter line of Junipero avenue extended;{ <br />in length, be constructed on Sequoia <br />viding lots 7 and 8 Block 1 and one <br />lateral to line dividing 'lots 9 and 10 ling <br />last mentioned map, and all extend- <br />from main sewer in center <br />that brick manholes with cast iron <br />avenue and extending from the malty <br />Block 1 and one lateral to line divid- <br />of said <br />street to property line on the norther- <br />frames and covers be constructed on <br />Junipero avenue at the following <br />sewer in the center of said avenue to <br />the Property lines on each side there- <br />ing lots 11 and 12 Block 1 and one lat- <br />1t' side thereof; and one lateral at line <br />places, to -wit: one manhole on the <br />of, at the following places, to -wit: one <br />oral to line dividing lots 13 and 14 <br />Block I all as shown on last mentioned <br />dividing lots 9G and 97 Block 5 and <br />one lateral at line dividing lots 98 and <br />center line of Junipero avenue 245 <br />lateral extending from the main sewer <br />In <br />map, and all of said laterals extending <br />99 Block 5 and one lateral at line di- <br />feet westerly'from the westerly line of <br />Oak avenue; the <br />the center of said avenue to lot 38 <br />Block 5 and one lateral at line divid- <br />to the property line on the northerly i <br />i <br />viding lots 100 and 101 Block and <br />and one manhole on <br />center line of Junipero avenue at a <br />ing lots 39 and 40 Block 5 and one lat- <br />side of said May street; all the here- <br />one lateral at line dividing lots 102 <br />point 515 feet westerly from the west- <br />eral at line dividing lots 41 and 42 <br />before described laterals on May I <br />and 103 Block 6 and one lateral at line <br />erly line of Oak avenue; that four (4) <br />Block 5 and one lateral at line dividing <br />street are to be connected with the <br />dividing Iots,104 and 105 Block 5 and <br />inch salt glazed the pipe sewer lat. <br />lots 43 and 44 Block 5 and one lat- <br />main sewer in the center of said street <br />one lateral at line dividing lots 106 <br />erals, 34 feet in length, and extending <br />oral at line dividing lots 45 and 46 <br />with six (6) inch by four (4) inch salt <br />and 107 Block 5 all as shown on last <br />from the main sewer in the center of <br />Block 5 and one lateral at line dividing <br />glazed Life Pipe wyes, a separate Wye <br />being used for each lateral, <br />mentioned map, and all extending' <br />from main sewer in the center of salt] <br />the avenue to the property lines on <br />lots 47 and 48 Block 5 and one tater- <br />That a six (6) Inch salt glazed tile' <br />street to Property line on the south -I <br />both sides thereof be constructed on <br />Junipero avenue at the followings <br />al at line dividing lots 49 and 50 Block <br />pipe sewer be constructed along the <br />Orly side thereof; all the hereinbefore! <br />places, to -wit: one lateral extending <br />5 and one lateral at line dividinglots <br />51 and 52 Block 5 and one laterl at <br />center line of Norman street commene- <br />dseribed laterals on Regent ) street <br />1 <br />to the property line of lot 19 Block' <br />line dividing lots 53 and 54 Block 5 <br />Ing at a Point 25 feet westerly from, <br />are to be connected with the main <br />'3 and one lateral at line dividing lots land <br />one lateral at line dividing lots 65 <br />the easterly end of said street and ex -sewer <br />I <br />in the center of said street with <br />six (6) inch by four (4) Inch salt <br />20 and 21 Block3 and one lateral at <br />and 66 Block 5 and one lateral at line <br />ad <br />tending to the center line of Redwood <br />avenue to <br />glaz- <br />ed tile pipe Wyss, a separate Wye being <br />line dividing lots 22 and 23 Blocir 3 I <br />lateral line dividing 241 <br />1"lot%-, 57 and 68 Block 5 and <br />and connect with a man- <br />used for each lateral., <br />and one at lots <br />one lateral at line dividing lots 59 and <br />hole to,be constructed at the point of <br />and 25 Block 3 and one lateral at line j <br />60 Block 5 all as shown on the last <br />beginning of said sewer and als , to <br />That a six (6) inch salt glazed tile <br />dividing lots 26 and 27 Block 3 and one I <br />mentioned map and all extending from <br />connect with a manhole at the center <br />nine sewer be constructed along the <br />lateral at line dividing lots 28 and 29' <br />the main sewer in the center of the <br />line of Redwood avenue at the con. 'I <br />center line of Oak avenue commene- <br />Block 3 and one lateral at line divid- <br />said avenue to the property line on the <br />ter line of Norman street extended to <br />ing at the center line,of Sierra street <br />Ing lots 30 and 31 Block 3 andonc tat -II <br />southerly side thereof; and one lateral' <br />said ,center line of Redwood avenue, <br />extended to center of Oak avenue and <br />oral at line dividing lots 32 and 33I <br />at dividing line of lots 5 and 6 Block <br />which manhole is to be constructed;, <br />extending southerly to the center line <br />Block 3.and one lateral at line dlviding{ll <br />6 and one lateral at line dividing lots <br />• that brick manholes with cast Iron) <br />of .,Junipero avenue and to connect <br />lots 34 and 35 Block 3 and one lateral, <br />7 and 8 Block 6 and one lateral at <br />frames and covers be constructed on <br />with manholes to be constructed at <br />at line dividing lots '36 -and 37 Block <br />line dividing lots 9 and 10 Block 6 <br />Norman street at the following plac-1 <br />center line of Oak avenue and center <br />3 and one lateral at line dividing IOtSI <br />and one lateral at line dividing lots 11 <br />es, to -wit: one on the center line of <br />line of Junipero avenue, Ramona av- <br />38 and 39 Block 3 and one lateral nil <br />and 12 Block 6 and one lateral at line <br />salt] street at a point 25 feet westerly <br />enue, Sequoia avenue at center line <br />line dividing lots 40' and 41 Block 3 <br />dividing lots 13 and 14 Block 6•and one <br />from the easterly end of said street; <br />of Sierra street extended to centr line <br />all as shown on last mentioned map, <br />lateral at line dividing lots <br />and one manhole on the center line of <br />of Oak avenue; that brick manholes <br />and all extending from main sewer) <br />15 and 16 Block C and one <br />said street at a point 200 feet westerly <br />with cast Iron frames and covers be <br />In tine center of said avenue to prop-� <br />lateral at line dividing lots 17 <br />from the easterly end of said street; <br />constructed on Oak avenue at the fol- <br />arty line on the southerly side thereof;, <br />and 18 Block 6 and one lateral at line <br />that four (4) Inch salt glazed tile piper <br />lowing places, to -wit: one manhole on <br />and one lateral at line dividing lots <br />dividing lots 19 and 20 Block 6 and one <br />sewer laterals, 24 feet in length be con- <br />{ center line of Oak avenue at center <br />10 and 11 Block 4 and one lateral at <br />lateral at line dividing Iota 21 and 22 <br />structed on Norman street from the <br />line Sierra street extended to the <br />line dividing lots 12 and 13 Block4 <br />Block6 and one lateral at line divid- <br />main sewer in the center- of the street <br />center line of Oak avenue; one on cen- <br />and one lateral at line dividing lots <br />Ing lots 23 and 24 Block 6 and one <br />Ito the property lines on both sides of <br />ter line of Oak avenue at center line! <br />14 and 35 Block 4 and one lateral at, <br />lateral at line dividing lots 25 and 26 <br />said street at the following places, to- <br />of Sequoia avenue; one on Oak avenue <br />line dividing lots 16 and 17 Block 4' <br />Block 6 and one lateral extending from <br />wit: one lateral to line dividing lots <br />at center line of Romona avenue; and <br />and one lateral at line dividing lots <br />the main sewer to the center of said <br />30 and 31 Block 2 and one lateral to line <br />one on Oak avenue at center line of <br />1S and 19 Block 4 and one Interal lit <br />'avenue -to Lot 27 Block 6 all as. shown <br />` dividing lots 32 and 33 Block 2 and one <br />Junipero avenue; that four (4) inch <br />line dividing lots 20 and 21 Block 9 <br />on the last mentioned map, and all ex - <br />lateral to line didittng lots 34 and 35 <br />salt glazed the pipe sewer laterals be <br />and one lateral at line dl - <br />tending from the main sewer in the <br />Block 2 and one lateral to line divid- <br />constructed on Oak avenue, 28 feet <br />viding lots 22 and 23 Blockl <br />center of said Sequoia avenue to the <br />ing lots 36 and 37 Block 2 and one <br />in length, slid extending from the <br />4 and one lateral at line divid-1 <br />property line on the northerly side <br />lateral to line dividing lots 38 and 39 <br />main sewer in the center o[ said av- <br />Ing lots 24 and 26 Block 4 • and one] <br />thereof; and ¢71 the hereinbefore des - <br />lBlock 2 and one lateral to line divid- <br />enue to the property lines on both <br />lateral at line dividing lots 26 and 27 <br />cribed laterals on Sequoia avenue are <br />i ing lots 40 and 41 Block 2 all as shown) <br />sides of said avenue at the following <br />Block 4 find one lateral at line divid- <br />to_be connected to the main sewer in <br />Ion last mentioned map and all extend- <br />places, to -wit: one lateral at line dl-. <br />Ing lots 28 and 29 Block 4 and one <br />the center of said avenue with six (6) <br />Ing from main sewer to northerly prop- <br />viding lots 1 and 2%lock 12 and one <br />lateral at line dividing lots 30 and 31 <br />Inch by four (4) inch salt glazed the <br />e•tyline of said Norman Street; and one <br />lateral at line dividing lots 3 and 4 <br />Block 4 and one lateral extending from <br />pipe Wye$, a separate Wye being used <br />lateral extending from main sewer <br />Block 12 and one lateral at line dl- <br />main $ewe• In center of street to lot <br />for each lateral. <br />on said Norman street to property line <br />viding lots 5 and 6 Block 12 and one <br />32 Block 4, all as shown on last men- <br />That a six (0} Inch salt glazed the <br />on southerly side thereof at a point <br />lateral at lino dividing lots 7 and 3 <br />ttoned map, and all of said laterals <br />-pipe sewer be constructed along the <br />110 feet easterly from tine easterly <br />Block 12 as showwon tine map of }Vest <br />extending from main sewer in the <br />center line of Oliver street nommene- <br />line of Redwood avenue; one lateral <br />Redwood; and one lateral at line di- <br />center of ,said avenue to the property <br />Ing at a point 25 feet westerly <br />to line dividing lots 46 and 47 Block <br />viding lots 1 and 2 Block 11 and one <br />line on the northerly side thereof; and <br />fronx.the easterly end of said street' <br />3 and one lateral to line dividing Iota <br />lateral at line dividing lots 3 and 4 <br />all the hereinbefore described laterals <br />i <br />and extending to the center line of <br />i94 and 45 Block 3 and one lateral to <br />(Block 11 and one interni at Ilse dl- <br />on on avenue are oto be connect- <br />Roosevelt avenue and to connect with <br />line dividing lots 42 and 42 Block 3 all <br />viding lots 5 and 6 Block It and one <br />I ed with the main sewer In the center <br />a mantels to be constructed at the <br />as shown on the last mentioned map, <br />lateral at line dividing lots 7 and 8 <br />of said avenue with six (6) inch by <br />id sewer <br />beginning o1 said sewer and also to <br />and all extending from main sewer to <br />Block 11 as shown on last mentioned <br />tour (4) Inch salt glazed the Pipe <br />connect with a now is pinta <br />property line on the southerly side of <br />map; and one lateral at line dividing <br />n separate wYe being used for <br />at the center ]ilia o1 Roosevelt avenue <br />said Norman street; all the hereinbe-, <br />)ons 1 and 2 Block 30 and one lateralwyes, <br />each lateral. <br />at center line of Oliver street extended; <br />fore described laterals on Norman <br />to be connected with the <br />at line dividing lots 3 and 4 Block 10 <br />That n Six (C) Inch salt glazed fife Pine <br />that brick manholes with cast Iron <br />street are <br />main sewer in the center of said street <br />and one lateral at line dividing lots 6 <br />Block 10 lateral at line <br />sewer be constructed along the con- <br />frames and covers be constructed on <br />with six (G) Inch by Lour (4) Inch Salt' <br />and 6 and one <br />dividing lots 7 -and 8 Block 10 slid <br />ter line of Ramona avenue from the <br />Oliver street at the following places, <br />to one manhole on the center line <br />glazed tile pipe wyes, a separate Wye <br />one lateral extending from main new. <br />cents- line of Oak avenue to the center <br />to <br />-wit: <br />of Oliver street at a point 25 feet west - <br />beim; used for each lateral. <br />e• in center of Oak avenue to lot 9 <br />line of Roosevelt avenue and con- <br />to be constructed <br />erly from the easterly end of said <br />That a six (6) inch salt glazed the <br />Block 10, all as Shown on last men- <br />nett with manhole <br />at center line of Ramona avenue at <br />street; and one manhole on the center <br />pipe sewer be constructed along the <br />toned map, and all of said laterals <br />line of Onk avenue and to con- <br />line of Oliver street at a point 360 feet <br />conte• line of Oxford street commene-, <br />extending from main sewer In center <br />center <br />now In Place st <br />westerly from the easterly end of said <br />Ing at a point, 25 feet westerly from the <br />of avenue to property line on the <br />, sect with manhole <br />line of Roosevelt avenue at <br />street; that four (4) Inch salt glazed <br />easterly cud of said street and extend- <br />easterly side thereof; and one lateral <br />center <br />conte• line of Ramous avenue extend- <br />,tile pipe sewer laterals, 28 feet In <br />Ing to the center line of Redwood av- <br />at line dividing lots 27 and 28 Block <br />' <br />ed; that brick manholes with cast Iron <br />' length be constructed on Oliver street <br />Ienue and to connect with manhole to <br />6 and one lateral at line dividing lots <br />frames and covers be constructed on <br />and extending from the main sewer on <br />(be constructed at Point of beginning! <br />29 and 30 Block 6 and one lateral at <br />Ramona avenue at the following nine- <br />amid street to the property Imes both <br />II and also to connect with manhole to beI <br />,constructed at center line of Redwood <br />line dividing lots 31 .and 32 Block 6 <br />lateral at line dividing lots 33 <br />es, to -wit: one manhole on the center <br />sides thereof, at the following places, <br />p <br />divlding <br />avenue at center line of Oxford street <br />and one <br />,and 34 Block 6 as shown on last men- <br />line of Ramona avenue at a point 245 <br />feet westerly from the westerly line. of <br />to -wit: one lateral at ]Ise <br />lots 3 and -4 Block 1 and one lateral of <br />extended thereto; that brick manholes <br />toned man; and one Interal-at line di- <br />Oak and one manhole- on the <br />.line dividing lots 6 and 7 Block 1 and <br />with asst Iron frames and covers be <br />viding lots 31 and 32 Block 5 and one <br />avenue; <br />Ramona avenue at n <br />one latera] at line dividing lots 9 and, <br />constructed on Oxford street at the <br />- lateral at line divJding lots 33 anid 34 <br />center line of <br />Mr, feet westerly from the west- <br />ater <br />10 Block 1 and one lateral -at line divid-? <br />following places, to -wit: one manhole <br />' Block 5 and one lateral at line di- <br />`viding <br />point <br />Orly line of Oak avenue; that foul- (4) Inch <br />Ing lots 10 and 11 Block 1 and one' <br />on the center line of said street at ¢ <br />lots 36 and 3G Block fi and one <br />the pipe sew s• Laterals, <br />lateral at line dividing Ipte� <br />point 25 feet westerly from the east- <br />- lateral at line dividing lots 37 and 38 <br />' <br />salt glazed <br />34 feet in length, and extending from <br />1 and one �lat- <br />erly end of said street; and one man- <br />Block 6 all as shown on last men- <br />divid- <br />the main Sewer in the center of said <br />12 and 13 131001t <br />dividing lots 14 and 15 <br />hole on the center line of said street at <br />• a point 200 feet westerly from the east- <br />• ttoned map; one lateral at line <br />° ing lots 32 and 33 Block 4 and one <br />avenue to the property lines on both <br />oral at line <br />Blocic 1 and one lateral at line dividing <br />erly end of said street; that four (4) <br />;lateral at line dividing lots 34 and 35 <br />sidesthereof becontsructedon Ramona <br />lots 16 and 17 Block 1 and one lateral <br />Inch salt glazed tile pipe sewer- <br />avenue it the following places, to -wit: <br />at line dividing lots 38 and 19 Block <br />erals be constructed on Oxford street, <br />I Ing lots 36 and 37 Block 4 and one <br />one lateral extending from the main <br />40 Block 4 and one lateral <br />and one lateral at line dividing lots <br />lateral at <br />24 fret in length and extending from <br />the <br />!lateral at line dividing lots 38 and 39 <br />'Block lateral extending <br />sewer to lot <br />at line dividing lots 41 and 42 Block <br />20 and 21 Block I and one <br />dividing lots 22 and 23 Block 1 all <br />the main sewer in the center of <br />street to the property lines on both <br />4 and one <br />; from; main sewer in center of sold Oak <br />4 and ane lateral at line dividing lots <br />line <br />as shown on map of resubdlvi$ion of <br />sides of said street at the following <br />- avenue to lot 40 Block 4 all as shown <br />43 and 44 Block 4 and one lateral at <br />4 <br />Lot 20 of the l,_Vooster, lVhit- <br />places, to -wit: one lateral at line di- <br />son last mentioned map, and all <br />line dividing lots 46 and 46 Block <br />ton anti Dlontgomery^s subdi- <br />viding lots 52 and 53 Block 3 and one <br />extending from main sewer in the cen- <br />and one lateral at line dividing lots <br />vision Of a part of .,the <br />lateral at line dividing lots 54 and 55 <br />ter of said Oak avenue to property <br />47 and 48 Block and one lateral at <br />lots 49 and 50 Block 4 and <br />Redwood Farm, and all extending from <br />of Bald <br />Block 3 and one lateral at line dividing <br />line on the westerly side thereof; and <br />line dividing <br />line dividing lots 61 anti <br />the main sewer in the center <br />line on the <br />lots 56 and 57 Block3 and one lateral <br />all the hereinbefore described laterals <br />one lateral .,it <br />lateral at line dl- <br />street to the property <br />lat- <br />• at line dividing lots 58 and 59 Block 3 <br />1 on Oak avenue are to be connected <br />52 Block 4 and one <br />lots 53 and 54 Block 4 and one, <br />northerly Side thereof, and one <br />lots 22 and 21 <br />and one lateral at line dividing lots <br />Interal <br />with the main sewer on said avenue <br />Inch by four (4) Inch <br />viding <br />lateral at line dividing lots 55 and 56 <br />oral at line dividing <br />Blockand one lateral at iinedivlding <br />60 and 61 Block 3 and one at <br />IInG dividing lots G2 and G3 Block 3 all <br />with six (6) <br />salt glazed file Pipe wyes, a separate' <br />Block 4 and one lateral at line dividing <br />.2 <br />lots 20 and 19 (hock 2 and one lateral <br />Be shown on last mentioned map, and <br />Wye being used for each lateral. <br />' tiles <br />lots 57 and 68 Block 4 and one (sterni <br />line dividing lots 59 and Go Block 4 <br />at line dividing lots 18 and, 1.7 BI ck 2 <br />line dividing lots 1G <br />all extending from main sewer in con- <br />That a six (6) Inch salt glazed <br />the <br />at <br />find one lateral at line dividing lots <br />,and one lateral at <br />n 'Block 2 and one lateral at line <br />ter of Street to the property' line on the <br />pipe sewer be constructed along <br />from the <br />61 and G2 Block 4 all as shown on <br />and It; <br />dividing lots 14 and 13 Block 2 and one <br />northerly side thereof; and one lateral <br />line dividing lots 64 anti G5 Block 4 <br />center line of Sierra street <br />line of Redwood avenue to the <br />last mentioned malt, and all extending <br />lateral at line dividing letB 12 and Il <br />at <br />lateral at line dividing lots <br />center <br />center line of Oak avenue and to con- <br />from main sewer in ,the center of said <br />Block 2 and one lateral at line divid- <br />and one <br />66 67 Block 4 and one lateral at <br />pact with a manhole to be constructed <br />avenue to property lineoil the South- <br />'Ing lots 10 and 9 Block 2 and one lat- <br />and <br />line dividing lots CS and 69 Block 4 and <br />at center line of Redwood avenue and <br />Orly side thereof; and one ]Steal atd <br />line dividing lots 9 and 10 Shock 6 and <br />oral at line dividing lots 8 and 7 Block <br />'2 at line dividing lots <br />one Lateral at line dividing lots 70 and <br />lateral at line di- <br />center line of Sierra street extended, <br />to connect with manhole to be <br />one lateral at line dividing lots 11 and <br />and one lateral <br />6 and 5 Block 2 and one lateral at line <br />71 Block 4 and one <br />viding lots 72 and 73 Block 4 and one <br />and also <br />constructed at center line of Oak av- <br />12 Block 5 and one lateral at line dl-' <br />lots 13 and •14 Block 6 and one <br />dividing lots S and 4 Block 2 all as <br />last map. and <br />lateral at line dividing lots 74 and 75 <br />enue at center line of Sierra street ex-�, <br />a brick manhole with,; <br />viding <br />at line dividing lots 15 and 16' <br />Shown on the mentioned <br />from the main sewer in <br />Bldek 4 all as shown on the Inst men- <br />tended; that <br />be con -1 <br />rlateral <br />Block 5 and one lateral at 11ne dividing' <br />all extending <br />the of said street the Prop - <br />ttoned map, and all extending from <br />in the center of said <br />cast Iron frame and cover <br />'structed on the center line of Slerra <br />Iota 17 and 18 Block 6 and oma lateral <br />center <br />Bi <br />arty line on the southerly side thereof; <br />the main sewer <br />'street line the <br />200 feet west-, <br />at line dividing lots 19 and 20 Block' <br />and all of said hereinbefore described <br />to the property on <br />side thereof; all the herein- <br />street at a point <br />I.ly along the line of said sewer from <br />5 and one lateral at line dividing lotsi <br />laterals on Oliver street are to be con - <br />southerly <br />before described laterals on Oxford, <br />the center line of Redwood avenue;�i <br />21 and 22 Block 5 and one lateral at; <br />24 Block 5' <br />nected with the main sewer on said <br />street are to ins connected with the., <br />that tour (4) Inch salt glazed the <br />line.dlviding lots 23 and <br />dividing lots <br />Street wth six 44nch by four .Inch <br />main sewer In the center of the street, <br />pipe sewer laterals be constructed onl <br />and one lateral at line <br />(Sacral at <br />salt glazed the pipe wyes, a separate <br />with six (G) inch by Your (4) Inch salt <br />Sierra street 28 feet In length and ex- <br />20 and 26 Block 5 and one <br />27 28 Block 6 <br />Wye being used for each lateral. <br />glazed' fila pipe nvyeS, a separate wYe <br />tending from the main sewer in the <br />line dividing lots and <br />line dividing Iota <br />That a six (6) Inch salt glazed tile; <br />being used for each lateral. <br />11 center of said street to the propenyl <br />and one lateral at <br />129 and 30 Block 5 and one lateral ex- <br />pipe sewer be constructed along the <br />center Line of Ramona street commene-1 <br />