|
- -covers b �...._
<br />t)(iaty-nine, four inch sal gtazed tile to be ronatructed on said Brews r av- four nc aafi:"gazed7lilw D pC e�Bedree"
<br />pipe sewer laterals ba constructed, Onuo.aa' herein provided lar, and also tAtarata�be. construokad a€ong, tbNtiina.
<br />along the line of said Sewer on Nevada that two brltX manholes'with,oast iron of said sewer.Oxtending'from said sew -
<br />street, extending £roto said eawer to frAmCs and a construct• Or to the property line on the'n0rth-
<br />the property lineson Roth sides there- ed along the lige of sald'sewer,, one in Orly'slde of said road, each of such
<br />:of, all of such laterals connecting With Block 6 And one in Block 2, Oak Knoll lateral, to be connected with afhaln
<br />AIx Inch sew'or-to be connected by six Manor. and also that eight, four inch fawor by six Inch by four inch Salt
<br />Inch by tpur Inch salt glazed tile pipe salt glazed Elie pipe sewer laWAln be glazed tile pipe ewer wve,.
<br />:sayer wyes, One wye for each lateral, constructed Along the line of said Sew= That a six (6) inch vitrified salt glaz-
<br />and'•all ofilafd laterals connecting with er, five of said laterals In Block, 6 and of the pipe sewer be constructed on
<br />eight (8) inch sewer to be connected three of said, laterals in, Block 2, Oak Canyon Road eommenetng�at the center,
<br />eight inch by four Inch salt glazed tale Knoll Manor, each of such laterals to line of Brewster* Avenue and extend,
<br />'pipe Sewer' wyes, a separate wye for be connected with main Sewer by eight fng westerly 'to a point In the center
<br />each lateral. Inch, by lour inch salt glazed tile pipe line of, said Canyon Road where the
<br />That a six (6) Inch vitrified .salt sewer wyes, .The beret,
<br />men- westerly line of Lot $3. of a re-shbdl»'
<br />glazed file pipe sewer be constructed tfoned, alley or lane. running through vision of Block X16 of Oak'Knpll Manor
<br />on Myrtle 'Street commencing at a Blacks 2 and 6 of Oak Knoll Manor was extended northerly in a -straight tine
<br />point' tour test northerly from the deeded to the Town of Redwood'City .by Intersects , sande; and also that three
<br />Southerly
<br />line of said street and .125 deed recorded'In-.the Office 'Of the Re- brick manholes with cast iron frames
<br />south
<br />feet erly ik from the westerly line of corder 'of the -County. of San Mateo, and -covers, be constructed along the
<br />estBrBWsler avenue and extending west- state of California, In Volume 38 of tine of said sewer, And also that thir-
<br />eriy and parallel to and ..four teat Official Records at page 166. - _, teen, four inch salt glazed the Was
<br />'northerly from sold southerly line of That, d ix (6) Inch vitrified salt sower laterals be construetedalchgthe
<br />,Myrtle, street to a point 125 ,feet east- glazed 'tile 4plpe-sower be OanstTueted line of said sewer extending from said
<br />(eriy train the easterly line of Hopkins on Eilfivtew,-avenue commencing at,' a sewer to the property line .on the
<br />Ii Avenue, and also that three brick man point in the center liar of Said avenue such laterals to be outherly side of_said Road,, each of
<br />holes with cast iron frames and tbv- 20 feet easterly from the westerly line sconnected with the
<br />1era ))a- constructed along the line of -Of Lot 12 Block 8, Oak Knoll Manor ex- main sewer by six inch by tour Inch
<br />said sewer, and also •that ten, 'six' Anch tended southern: in , a straight line salt glazed tile pipe' Newer wyes:
<br />try tour inch salt glazed the pipe`ewer abroas safd`ayenue and extending in a That a, Six ,(6) inch vitrified salt
<br />v,Yes be constructed along the line of westerly direction ^:to.•the" center' lino glazed' tile Pirie sewer be constructed
<br />said aewor on the southerly silo tftore- of Brewster avenue - and to ..connect on Canyon Road commencing -At a, point
<br />of. x- with sewer to .be constructed therein on flip center line, of said. Road where
<br />That, an.,etght (8T inch vitrihod salt As herein provided for, and also that the westerly line of Lot 27 of n b-
<br />Man -
<br />glazed .tile pipe sewer be ,constructed four brick manholes with east Iran division of Black 15 of OaIc KnollMan-
<br />as, follows; Commenting At the exist- frames and covers be.constructed along or extended northerly In m Straight
<br />tng manhole 2.5 feet easterly from the the line of saisewer, and also that line Intersects- same and extending
<br />westerly line of Lot 27 In Black 43 of nineteen, four'fuohr salt glazed'the-,pipe westorT7 to a acini an the westerly,
<br />Redwood Highlands and extending sewer laterals be constructed along the line produced Of. Lot 35 of a ReSulidi-
<br />southerly and 2.6 feet easterly from line of said sewer and extending, from vision of Block 15- of, Oak Knoll Manor
<br />and parallel to ,the westerly lines, of said sewer to the property lines on extend ed, northerly, said point being 25
<br />lots 27, 28 and 29 In said Block 43 lied- both stdw, of said avenue, each`of' Such feet northerly_ from the southerly line
<br />wood Highlands to the northerly line laterals to be connoted with Main of said Canyon Road. and also tbat two
<br />of Myrtle: street and thence contlnu, sewer by six Inch by four Inch •salt .brick: manholes with on, iron frames
<br />Ing In .A' straight line across.Myrtle glazed tile pipe sewer wyes. and covers be constructed along the
<br />istreot,and thence' continuing southerly line of said 'sewer, and also that six,
<br />[• That an eleht �(8)Fngh ,vitrified salt 'four- Inch salt ,glazed the pipe sewer
<br />,And 2',6 fent easterly from And parallel tile ]
<br />• Fto #ha westerly line of lots 26,'26, 27, 28 qn Htivfaw a"ivenue comfuencinstat the of said ewer extending froructed laterals be constructed m thnmain
<br />and 29 Block 46 Redwood Highlands' to g' g
<br />the pertherly line of Nevada street and center line pf'Brewoter avenue.•and ex-' sewer to property line on the southerly
<br />;thence aontTnuing In a straight cine tending to a point where the center side of said Canyon rand, each Of such
<br />'southerly to't]ie cantor line of Nevada line of aIIQV or. lane running through laterals to be connected with the main
<br />South
<br />' .lo connect with newer a be -Block• 6 Onk Knoll Manor, extend ad sewer by six inch by four inch salt
<br />S pipe
<br />southerly in , straight line Intersects lazed tile, pipsewer wyes:
<br />constructed therein, and that=seven,
<br />eight Inch by. four inch salt, glazed- tile the center line of said HIIlvlew avenue, . That a six (6) Inch vltrlfled salt giaz-
<br />and also that one'rbrick manhole with
<br />thea sower ,wyes be r. Tile las a)am� art iiia PIPs. sower be, constructed, on
<br />the lino of said sower. The Inst nam- cast Iron tname.and cover be construct- Westgate Street, Commrnctng at the
<br />ed sewer Is to be -constructed thrOU_it eclat the end of said la5tmentioned Sew- server to be constructed an Foothill
<br />said BlgClis 43 ,and 46 of Redwood °r'ai'd alsothatfivir,fovr Inch ,salt glaaad Boulevard and extending westerly
<br />1i Highlands upon a right of waV-grant- the pipe sewer laterals lie' constructed along said Westgate street to connect
<br />$ad to tbeTown'of Redwood City in that slang the line of said sel;er extending with sew,or to be constructed on Can -
<br />certain deed recorded In the Recorder's from the main sewer to the, property on Road as herein prbvlded for, and
<br />'office of.the County'of San Mateo, State lines on bothsidesof the avenue; cath three
<br />of such, laterals to -be connected' with also -that ram brick, man holes with
<br />of California, in Volume 30 of �Mlseel- main sewer by eight inch by four Inch, 'Cast crop' irnmes .end abverS be icon-
<br />laneous Records at page 266, " •", structed along the line of 'Said sewer;
<br />salt That
<br />the h v sewer wyes.
<br />That a 'she (0) .Inch vitrified salt -� and also that Seventeen, four ineH snit
<br />glazed Ile pipe sewer be constructed That a six Inch 'vltrlfled salt glazed glazed tile pigs sewer' laterals be con -
<br />as 'follows; Commencing. tit a point ,2.6 -tile pipe sewer be 'constru,cted, on'Hfll- structed along the line of said sewer,
<br />feet westerly from 'the easterly lino of. view • avenue commencing At a point extending, from the main sewer to the
<br />Lot A Bloek'40 Redwood Highlands on the center' line of said avenue where property lines' on both'. sldes'of said
<br />and 55 fent northerly from the norther- - the center Ifne of the alley or lane run- street, each of such laterals to be con -
<br />IV tne'of.Nevada street and extending nine through Block 6 Oak Knoll,Manor nected'with nlaln sewer by six inch by
<br />northerly -and 2.5 feet westerly from extended southerly in'a straight line four .Inch salt glazed klle.pipe sctifer
<br />And parallel to the easterly line of iota Intersects same, and extending wyes
<br />4;'3, 2 and 1 to said Brock 46 Redwood w'eataril' to a Point'in,thO center Ila That a Six' (6) Inch vitrified salt
<br />Hlghfanda and continuing to a point of said avenue where a line 20 feet glazed the pipe sewer„ be, constructed
<br />tour feet northerly from, the southerly 'westerly from and, parallet' to the on that portion of Circle Road extend-
<br />' �lfna .of Myrtle street and& to connect westerly line of Lot 9 Block 6 -Oak Ing northerly from - Oak Knoll .Drive,
<br />with sewer, to be constructed In said Knob hfanor extended southwesterly and commencing at a point on the cen-
<br />Myrtiestreet, and that one brick Than-.,deross said avenue Intersects same, ter line of said Road 75 feet easterly
<br />hole with cast it on frame and cover be and also that two brick manholes with ' from the westerly end of amid road
<br />constructed at the point of beginning cast Iron frames and Covers be con- and extending southerly to connect
<br />of said sewer, and also that four, six structed along the ilne.of said sewer, with existing sewer' on' Oak Knoll
<br />Inch by four In salt glazed 'tile pipe and: Arse that fourteen, Your inch salt Drive, and also that three brick man -
<br />sewer wyes be constructed along the glazed ,tile pipe Sewer Iaterals be con- hole. .with cast Iron frames and covers
<br />line of said sower. The said last nam- structed along the line of said sewer be constructed along the line of said
<br />ed sewer Is to, be constructed through extending from said sewgelo the prop- sewer, -.and 'also that fen,, tour inch
<br />-said Block 46 of Redwood Iitghlatids arty Ilnes stn both sides• o£'said avenue, salt glazed tiler pipe sewer laterals be
<br />upon a, right of way granted to the and also that each of such laterals be constructed along t"he ;linWiit said sew -
<br />Town of Redwood CItY. in that certain connected with sold -sewer by six 7nchi er "extending from 'the niaia'sewer to
<br />deed recorded In the allies of the Re- bl''four Inch Salt glazed the pipe sew -II the, property lines on both sides of said
<br />corder of the County of Ban Mateo, er wYes. Road, -each of such rateTat>j to be eon -
<br />In of, Caiffornla, In 'V"olume 30- of Tnnk a six (6)' Inch vitrified' salt nectd with main sewer, by six inch by
<br />Miscellaneous Records .at page 266: glazed the pipe sewer be constructed on, four inch Balt glazed. ilia plpe sower
<br />That a six (6) Inch. vitrified Salt gihz- 'H111view avenue. commencing at a point' wyes, -
<br />ed tile -Pipe sewer, be constructed .pn in the eenter line of said avenue 75 feet, That A blx (6)„ Inch 'Vltrlflgd,, salt
<br />Inner Circle commenting In the cez(tbr easterly from tins easterly line oft g1wied the pipe sewer be constructed
<br />final thereof At a point 64.66 feet w t- Whihplo avenue and'extending 'easter- on that portion of Circle Road .extenq-
<br />city from the easterly end thereof and ly to Oak. Knoll -Drives and to connect Ing westerly. from Oak Knoll Drive
<br />extending t0 Southgate streets and I, with existing sewer therein, and also and commencing at.o, .point on a line
<br />bo. that, four -brick � nhOlea with- cast that three brick mahllWh with bast 10 feet w sterly-from and parallel, to
<br />Iron frames and covers ba. conOtr4trtad iron frames and elvers be construdted the westerly fine of Lot 3 Block 16 Oak
<br />along the-lin a of sold sewer, and also along the tine of Said sewer on Hili- Knoll Manor extonded northerly In a
<br />that seventeen, four inch salt. Blazed view avenue: and also that twenty=one, straight line, said point being 30 feat
<br />the pipe sower laterals be cons- etetl four' inch salt glazed the -pipe sewer southerly from ,the northerly line of
<br />along-thq line of said sewer axtondIng laterals be cgnstructod Along the' line said Circle Road, and extending easter.
<br />from the main sewer. to the property of said sewer extending from the main 1'•v to connect with existing sewer. -In
<br />lines CoA both sides of'sald street, and, sewer to the property lines on bath Oak Knoll, Drtve,.'and ,also that two
<br />also that, each of each laterals be con- aides of said Avenue. each Of inch lot= brick manholes with cast Iron frames
<br />,.acted, with the main sower by six Inch orals to be connnoeted with main sewer And- covers be constructed along• the
<br />by four inch salt glazed tile pipe sow- by six inch by four Inch salt glazed Ifne of said lower, and also that seven,
<br />at wYOp.the pipe sewer wyes. four, Inch salt glazed tile' pipe seiner
<br />'That A six (6) melt vitrified ,Sit g)az- That a six (0) inch vitrified salt glaz- iaternls be, cdnetructed along the tine
<br />ed tile' pipe ewer be constructed on ed the pipe sewer -be constructed on of said sewer extending from the main
<br />Southgate street commencing at the Foothill 'Boulevard 'commencing at a rawer toy the -property Iines an both
<br />Intersection of the sewer t0 be con- point on the center line of said bottle- %Ides of said Road; each of such lateir,
<br />strueted on Nevada street and the Sew- vard 90 feat from tlm easterly end ale -to be connected with the main sew,
<br />• er to be constructed on Brewster av- thereof and extending -northwesterly or by six Inch by four inch salt glazed,
<br />anus as herein provided for and extend- to a point In the center line of said til, Plpe'sewer wvea.
<br />ing southeasterlY.along said Southgate boulevard where a 21na'20'feet north-. Whenever the, words "skit glazed"
<br />-street 'to Inner Circle and to connect westerly frons and parallel to the are used berebi they shall x6ean vltrl-
<br />with sower to. be constructed therein noithwcSterlY' line of lot 4, 30100(* 13 fled salt glazed, •' •
<br />as herein Provided far, and also that Oak Knoll Manor extended northeast-- lvihonever mmaholea are to be COa-
<br />ttwo brick manholes with cast iron epiv In a straight line intereeots Said structed •Along• -the -line •bf ^ any Sower
<br />frames And Covera be constructed along center line, of said Footlhill •Boulevard; 'to be constructed ,herein said man -
<br />the line'ot said, sower, and that, also and also that eight'.briok' mhnhelos tholes, shall be, connected with the sew-
<br />fiye, ,tour inch salt glazed.. Mile PIP0 with cast Iran! frames and covers be ers so to be constructed herein.
<br />sewer laterals he constructed along the constructed along tll'e line of said sew- The various maps referred to here -
<br />line of Said sewer extending train the err and Also that' 'forty-six, four Inch in are of record In the Retarders office
<br />said eawer to the property lines. 'oh salt glazed the 0106' sewer laterAla be Of the County of San Mfateo, State of
<br />=both sides of said street,.each Of Such constructed Along *tile )ins of Bald California. In books and pages as fol;
<br />laterals to be connected with the main sewer extending from said sewer to, tile low's )to -wit
<br />sewer by six inch by four � inch. salt property' Sines' on both sides of sold Mffap of Oak Knoll Mfanor m Book 10
<br />glazed tile pipe ewer wyes. boulevard, each, OL .Buell 'laterals to be of Maps at Pastes 4, to 11 inclusive.
<br />_ That a 'Six .(0). inch vitrified snit connected with main sewer by'six.fn�h Map .of Redwood Highlands ln'Book
<br />glazed the pipe sewer be constructed by four Inch stilt glazed the pipe sewer p of Mesa at pages 0 and 7,
<br />on Opal Avenue commencing at the cen- wyes• MAP of Re -subdivision of Block 16 Of
<br />ter fine of the lane or mile-' running -That a. six (6) Stich 'vifrifled salt Oak Knoll Manor In Rook 10 of Mfaps
<br />through Black 0 of Oak Knoll liter ar glazed tile pipe sewer be constructed at
<br />extended across Opni avenue and', ax- on 'Foot'hill Boulevard commencing at"",._'-.„'
<br />- tending westerly along Haiti deal ai- a Point on the center .line thereof 16
<br />canuo to a line 20 Leet westerly from feet easterly from the easterly line
<br />and parallel .to the westerly line of df '4vhilrpla avenue and extending east=
<br />Lot 13 Block 2 Oalt Knoll Manor ax- erll" to Oak 3tnoB jirive and to connect
<br />-,tended In a straight lime across said ".itis exiting sewer now in sold drive;
<br />-Opal' avenue, hall also that three Amid sewer in order to connect with
<br />brick manholes with rest Iron frames existing manhole in Oak Knoll Drive
<br />and covers be constructed 'along the to be constructed across the corner at
<br />line of said sewer on Opal hivenue, and the little park located At the Intersec.
<br />also that fourteen. four inch, haft glaz-. tion f Foothill
<br />Boulevard,
<br />vardthat and s brick
<br />ed the pipe Sewer laterals be con-
<br />=structed aiang the line of said sewer ma 110108 'With cast iron frames and
<br />extending, from said, sewer to prop- covers be constructed along the line of
<br />arty •lines' On bath sides of said avellue, said sewer -ori Foothill., oulevard,, and
<br />Slat. -each of such •lateral to, be 'connected .also that fliteen, four inch salt Slat.-
<br />with said sewer by six Inch by four ad tilt pipe.sawer laterals be construc-
<br />_ inch Halt glazed Ole .pipo ewer wyes. ted along the line of said Sewer on
<br />That an eight (8) Inch vitrified salt 'Foothill BCulevArd, 'extending fr6m,
<br />- glazed file Pipe sewer be constructed main sewer to property .lines on both
<br />Along the alley or lane.. running through aides of Haid boulevard, each of such
<br />Blacks 6 and r of Oak Kn� I Manor laterals to be connected with main
<br />and commencing at the cont line at sewer by six inch by four -inch. Halt
<br />13111view aventhc where the center line glazed tele pipe sewer wyes.
<br />at said, alley or lane running through That a six (6) Inch vitrified salt glaz-
<br />Block t Oak Knoll "Manor f ttsrecto ed the pipe sower -be constructed on
<br />same and extending' thence northerly Canyon Read conforenelhg at A point
<br />-_
<br />and along the center line of said alley on the center line or said rend where
<br />or lane rdnnfrig through said Block the easterly line Of Lat 4 Block II Oak_
<br />6 Oak Knoll Manor . iW the south- Knoll southwesterly in
<br />_ Westerly line Of Opal avenue and thehct A Straight line intersects same and ex -
<br />continuing In a Straight 'lana across tending westerly to Brewster avenue
<br />Opal avenue and 'thence continuing And to Connect' with 'Hewer to be 0011 -
<br />along the center line of the alley, or structed therein as herein provided for,
<br />lane running through' Block of Oak and Also that ahs brick manhole with
<br />Knoll Manor to ,the Westerly line Of cast 'Iron' tfiamo and cover, b6 construct-
<br />RrAWater avenueiland continuing In a ed at the beginning of Said Sower on
<br />
|