Laserfiche WebLink
100 <br />t <br />I <br />That Phelps Street between the <br />of Phelps Street and Spruce <br />Street; southwest corner of <br />street to inside the curb line an <br />street grades of said streets and <br />aforesaid, said streets or portions <br />easterly line of Main Street and <br />Street: southwest corner of <br />Phelps Street and Maple Street; <br />the southwesterly aide thereof, <br />portions thereof, crown grades, <br />thereof now being in public <br />the easterly limits of the Town <br />Phelps Street and Spruce Street; <br />northwest corner of Phelps Street <br />That a six (6) Inch vitrified <br />curb grades and grade elevations <br />use. <br />NOTICE is hereby <br />of Redwood City, including all <br />southeast corner of Phelps Street <br />and Cassia Street; northeast car- <br />salt glazed tile pipe sewer be can. <br />for top ofegutters be changed and <br />given that <br />aerial bonds to <br />street intersections and portions <br />and Spruce Street; northwest car- <br />ner of Phelps Street and Cassia <br />structed along the center line of <br />grades different from those estab- <br />represent unpaid j <br />assessments and bear <br />thereof, be as follows, <br />ner of Phelps Street and Manza- <br />Street; southwest corner of <br />Phelps Street commencing at a <br />fished or adopted prior to the <br />interest at <br />the rate <br />_improved <br />to -wit: <br />vita Street; northeast corner of <br />Phelps Street and Cassia Street; <br />point fifty (50) feet southeasterly <br />adoption by the Board of Trustees <br />of seven (7%) per cent <br />per annum be <br />That the roadway of said <br />Phelps Street anA Manzanita <br />southeast corner of Phelps Street <br />from the southeasterly line of <br />of said Town of Redwood City of <br />will issued here- <br />under in the <br />Phelps Street above described with <br />Street; southwest corner of <br />and Cassia Street; northwest car. <br />Elm Street produced southwest- <br />the plans, profiles and specifics. <br />manner provided by <br />the Improvement <br />Intersections above described be <br />Phelps Street and Manzanita <br />ner of Phelps Street and Pine <br />Orly across Phelps Street and ex- <br />tions hereinafter referred to here- <br />Bond Act of <br />1915, the last installment <br />graded and paved with a six (6) <br />Street; northwest corner of <br />Street; northeast corner of Phelps <br />tending southeasterly to a point <br />In shall be adopted, and such of. <br />of which <br />bonds shall mature and be <br />Inch cement concrete pavement <br />Phelps Street and Laurel Street; <br />Street and Pine Street; southwest <br />50.75 feet northwesterly from the <br />ficial and different and prior <br />pay. <br />able nine (9) years from the see. <br />on a four (4) inh.h base or cushion <br />northeast corner of Phelps Street <br />corner of Phelps Street and Pine <br />northwesterly line of Cedar <br />grades shall be modified and are <br />and day of July ' <br />of broken stone, with a one (1) <br />and Willow Street; southeast cor. <br />Street; southeast corner of Phelps <br />Street; that two (2) lampholes <br />hereby modified and changed eo <br />next succeeding <br />ten (10) months from their <br />Inch sand cushion `tetween, pro- <br />ner of Phelps Street and Willow <br />Street and Pine Street; northwest <br />with cast iron frames and covers <br />that the official grades shall be <br />date. <br />vided, however, that said con- <br />Street; northwest corner of <br />corner of Phelps Street and Buck- <br />be constructed along the line of <br />and conform to the grades as <br />Except as hereinabove other• <br />trete pavement shall hav, a thick., <br />Phelps Street and Charter Street. <br />eye Street; northeast corner of <br />said sewer on Phelps Street, one <br />shown on the plans, profiles and <br />wise provided for the issuance of <br />ness of eight (8) inches to the <br />That the open concrete gutter <br />Phelps Street and Buckeye <br />(1) at each end thereof; that <br />specifications for said work and <br />serial bonds, all the herein <br />serpro- <br />center of said street and taper to <br />now In place along the south. <br />Street; southwest corner of <br />eight (8), four (4) inch vitrified <br />improvements, which plane, pro- <br />posed work and improvements <br />-a thickness of six (6) inches It <br />westerly curb line of Phelps <br />Phelps Street and Buckeye Street; <br />salt glazed tile pipe sewer laterals <br />files and specifications were here- <br />shall be done In pursuance of <br />points three (3) feet each sada <br />Street and extending from the <br />southeast corner of Phelps Street <br />be constructed along the line of <br />tofore adopted by the Board of <br />and In conformity with an act <br />of the center line thereof. There <br />southeasterly line of Maple Street <br />and Buckeye Street; northwest <br />said sewer on Phelps Street and <br />Trustees of the Town of Redwood <br />of the Legislature of the State "'• <br />Is excepted, however, from the <br />to the northwesterly line of Maple <br />corner of Phelps Street and <br />extending from the main sewer in <br />City on the 30th day of August, <br />"Resolution <br />of, California entitled "Improve - <br />ment Act of 1911", approved April <br />above described work a strip th)r- <br />Street be removed. <br />Spruce Street; northeast corner . <br />the center of the street to inside <br />1926, by Adopting <br />, <br />7th, 1911, <br />ty (30) inches in width immedi• <br />That the culverts now in place <br />of Phelps Street and Spruce <br />the curb line on the northeasterly <br />Plans and Specifications No. I.14," <br />and acts amendatory - <br />ately adjacent, to the curb line <br />at the following places be re- <br />Street; southwest corner of <br />side thereof; that eight (8), four <br />which plane, profiles and specifi- <br />thereof. <br />on the southwesterly side of <br />moved: Along the southwesterly <br />Phelps Street and Spruce Street; <br />(4) inch vitrified salt glazed tile <br />cations are now on file in the <br />And the Board of Trustees of <br />Phelps Street and extending from <br />curb line of Phelps Street from <br />southeast corner of Phelps Street <br />pipe sewer laterals be constructed <br />office of the Clerk of said Town <br />the Town of Redwood City does <br />the northwesterly line of Cassia <br />the southeasterly line of Cassia <br />and Spruce Street; northwest cor- <br />along the line of said sewer on <br />of Redwood City. All the work <br />hereby order and declare that " <br />Street to the southeasterly line <br />Street to the northwesterly line <br />ner of Phelps Street and Manza• <br />Phelps Street and extending from <br />and improvements herein de- <br />the Sum of thirteen thousand <br />of Maple Street,• and also from <br />of Cassia Street; across Phelps <br />nits Street; northeast corner of <br />the main sewer in the center of <br />scribed shall be done and made to <br />three hundred and thirty-three <br />the northwesterly line of Maple <br />Street along the southeasterly line <br />Phelps Street and Manzanita <br />the street to Inside the curb line <br />such new official grades as shown <br />($13,333.00) dollars be paid out of <br />Street to the easterly line of Main <br />of Cassia Street from the north. <br />Street; southwest corner of <br />on the southwesterly side thereof. <br />on the plans, profiles and specifi• <br />the general fund of said Town of ' <br />Street, concrete gutter now being <br />easterly line of Phelps Street to <br />Phelps Street and Manzanita <br />That a six (6) inch vitrified salt <br />cations hereinbefore mentioned, <br />Redwood City on the costs and <br />in place at said places; there is <br />the southwesterly curb line of <br />Street; northwest corner of <br />glazed tile pipe sewer be can- <br />to which plana, profiles and speci- <br />expenses of the work and im- <br />also excepted from the above de- <br />Phelps Street; across Phelps <br />Phelps Street and Laurel Street; <br />structed along the center line of <br />fications reference is hereby made <br />provementa herein described. <br />scribed work a strip between the <br />Street at the southeasterly curb <br />northeast corner of Phelps Street <br />Phelps Street and extending from <br />for a description of the grades at' <br />rails and on two (2) feet each <br />line of Chestnut Street, and from <br />and Willow Street; southeast car, <br />a point 50.30 feet southeasterly <br />which said work is to be done, <br />side thereof of the railroad track <br />the northeasterly line of Phelps <br />ner of Phelps Street and Willow <br />from the southeasterly line of Ce- <br />and said improvements made, and <br />f <br />across the intersection of Phelps <br />Street to the southwesterly line <br />Street; and northwest corner of <br />dar Street to the manhole now <br />the same are made a part hereof. <br />Street and Chestnut Street. <br />of Phelps Street; across Phelps <br />Phelps Street and Charter Street. <br />In place at the center line of <br />All the hereinbefore and here- <br />That the concrete curb now in <br />Street at the southeasterly curb <br />That a six (6) Inch' vitrified <br />Phelps Street and the center line <br />Inabove mentioned and described <br />place on said Phelps Street at <br />line,of Pine Street, and from the, <br />salt tyle pipe sewer be <br />of Chestnut Street; ,that one (1) <br />work and improvements are to be <br />k <br />-, <br />the following places be removed: <br />northeasterly line of Phelps Street <br />glazed <br />constructed along the center line <br />lamphole with cast Iron frame <br />done in accordance with the spe- <br />On the northeasterly side of said <br />to the southwesterly line of Phelps <br />of Phelps Street commencing at <br />and cover be constructed on tlhe <br />cial plans, profiles and specifica- <br />Phelps Street from the easterly <br />Street; across Phelps Street at <br />a SC.33 feet southeasterly <br />line of said sewer on Phelps <br />tions herefnbefore herein men - <br />line of main Street to the north- <br />the southeasterly curb line of <br />point <br />along the center line of Phelps <br />Street at the northwesterly end <br />boned, which plans, profiles and <br />westerly line of Maple Street; on <br />Spruce Street, and from the north- <br />Street from the easterly line of <br />thereof; that four (4), four (4) <br />specifications, are now on file In <br />.. <br />the northeasterly side of Phelps <br />easterly line of Phelps Street to <br />Main Street and extending south- <br />Inch vitrified salt glazed tile pipe <br />the office of the Clerk of the <br />' <br />Street from the southeasterly line <br />the southwesterly lin- of Phelps <br />easterly to a fifty (50) feet <br />sewer laterals be constructed <br />Town of Redwood City, and to <br />of Beech Street southeasterly for <br />Street; across Phelps Street at <br />point <br />northwesterly from tine northwest- <br />along the line of said sewer on <br />which plans, profi)es and speciflea- <br />a distance of fifty (50) feet; on <br />the southeasterly curb line of <br />erly property line of that portion <br />Phelps Street and extending from <br />tions reference is hereby made for <br />the northeasterly side of Phelps <br />Willow Street, and from the <br />of Cassia Street lying northeast- <br />the main sewer in the center of <br />an accurate, detailed and complete <br />Street from the northwesterly line <br />northeasterly line of Phelps Street <br />Orly from Phelps Street extended <br />the street to insidd the curb line <br />description and location of said) <br />of Laurel Street northwesterly for <br />to the southwesterly line of <br />southwesterly across Phelps <br />on the northeasterly side thereof; <br />work and improvements, and the <br />a distance of fifty (50) feet, on <br />Phelps Street. <br />Street; that two (2) lampholes <br />that four (4), four (4) Inch vitri- <br />same are matte a part hereof. <br />the northeasterly side of Phelps <br />That hydraulic cement concrete <br />with cast iron frames robe covers <br />fled salt glazed tile pipe sewer <br />And the Board of Trustees of <br />Street from the northwesterly line <br />curb six (6) inches acrosZ the top, <br />1)a constructed on the line of said <br />laterals be constructed along the <br />the Town of Rpdwood City does <br />of Charter Street northwesterly <br />eight (3) inches across the bot- <br />sewer, one (1) at each end there- <br />line of said sewer on Phelps <br />hereby determine and declare that <br />for a distance of thirty (30) feet; <br />tom and fourteen (14) inches deep <br />of; that seven (7), four (4) inch <br />Street and extending from the <br />the foregoing described work and <br />on the northeasterly side of <br />be constructed on sale Phelps <br />vitrified salt glazed tile pipe <br />main sewer in the center of the <br />improvements are of more than <br />Phelps Street from the northwest <br />Street at the following places, to- <br />laterals be <br />street to inside the curb line on <br />local or ordinary public benefit <br />arty line of Pine Street north- <br />wit: Along the northeasterly curb <br />sewer constructed on <br />the line of said sewer on Phelps <br />the southwesterly side thereof. <br />and will affect and benefit the <br />westerly for a distance of twenty <br />line of Phelps Street from the <br />Street and extending from themain <br />All the foregoing laterals are <br />lands and district hereinafter <br />(20) feet; on the northeasterly <br />easterly line of Main Street to <br />to inside the curb <br />to be connected with the main <br />mentioned, and said district is <br />side of Phelps Street from the <br />the northwesterly line of Maple <br />sewer <br />line on the northeasterly side <br />sewer by four (4) inch by six <br />hereby declared to be the district <br />northwesterly line of Spruce <br />Street; along the northeasterly <br />thereof; that six (6), -four (4) <br />(6) inch vitrified salt glazedtile <br />benefitted by said work' and Im- <br />Street northwesterly for a dis- <br />curb line of Phelps Street from <br />Inch vitrified salt glazed tile pipe <br />pipe sewer wyes, a separate wye <br />provement; that therefore the en. <br />tance of ten (10) feet, <br />the southeasterly line of Beech <br />sewer laterals be constructed on <br />being used for each lateral. All <br />ire costs and expenses of said <br />' <br />That the concrete curb returns <br />Street southeasterly for a dis- <br />the line of said sewer on Phelps <br />the foregoing laterals are to have <br />work and improvements shall be <br />now in place at the following <br />tante of fifty (50) feet; along the <br />Street and extending the <br />a four (4) inch by four (4) inch <br />and are hereby made chargeable <br />corners on said Phelps Street be <br />northeasterly curb line of Phelps <br />,from <br />in the the <br />wye at the end thereof Inside the <br />against and shall be assessed <br />removed, to -wit: northwest cor- <br />Street from the northwesterly line <br />ronin sewer center of <br />to inside the line <br />curb line. Where laterals go under <br />upon said lands and district, <br />ner of Phelps Street and Maple <br />of Pine Street northwesterly for <br />street curb on <br />the southwesterly side thereof, <br />curb a small cross shall be cut on <br />which district fa within the limits <br />Street; southwest corner of <br />a distance of twenty (20) feet; <br />face of curb. <br />of the Town of Redwood City, <br />Phelps Street and Maple .Street; <br />along the northeasterly curb line <br />That a six (6) Inch vitrified <br />Whenever the manholes or <br />County of San Mateo, State of <br />northwest corner of Phelps Street <br />of Phelps Street from the north• <br />salt glazed tile pipe sewer be <br />lampholes are to be constructed <br />California, and the said district <br />Ll <br />and Cassia Street; northeast cor- <br />westerly line of Spruce Street <br />constructed along the center line <br />the line of any sewer men- <br />Is described and shown on a cer- <br />ner of Phelps Street and Cassia <br />northwesterly for a distance of <br />of Phelps Street commencing at <br />along <br />boned herein said manholes and <br />tain map or plat entitled "Map <br />Street; southwest corner of <br />ten (10) feet; along the north- <br />the manhole now in place at the <br />said lampholes shall be connected <br />Showing Assessment District Un- <br />' <br />Phelps Street and Cassia Street; <br />easterly curb line of Phelps <br />center line of Cassia Street and <br />der Resolution of Intention No. <br />southeast corner of Phelps Street <br />Street from the northwesterly line <br />extending southeasterly to the <br />with said sewer. <br />1.14,' which Map or Plat was ap- <br />and Cassla Street; northwest cor- <br />of Laurel Street northwesterly for <br />manhole now In place at the cen- <br />Whenever any sewer fa to be <br />proved by the Board of -Trustees <br />_ <br />ner of Phelps Street and Pine <br />a distance of fifty (50) feet; <br />ter line of Elm Street extended; <br />constructed as herein provided <br />of said Town August 30, 1926, <br />Street; northeast corner of Phelps <br />along the northeasterly curb line <br />that four (4), Your (4) inch vitri- <br />and there are manholes or lamp- <br />and which map or plat Is now <br />Street and Pine Street; south- <br />of Phelps Street from the north- <br />fled salt glazed tyle pipe sewer <br />holes existing along the linethere- <br />on file in the office of the Clerk <br />west corner of Phelps Street and <br />westerly line of Charter Street <br />laterals be constructed along the <br />of, said sewer is to be connected <br />of the Town of Redwood City and <br />Pine Street; southeast corner of <br />northwesterly for a distance of <br />line of said sewer on Phelps <br />with said existing manholes or <br />to which map reference is hereby <br />Phelps Street and Pine Street; <br />thirty (30) feet, and along the <br />Street and extending from the <br />lampholes <br />made for an accurate location and <br />northwest corner of Phelps Street <br />southeasterly curb line of Phelps <br />main sewer in the center of the <br />The width of the streets above <br />description of said assessment dis• <br />and Buckeye Street; northeast <br />Street from the northwesterly line <br />street to inside the curb line on <br />described and the width of the <br />tract and the same is made a part <br />corner of Phelps Street and Buck- <br />of Charter Street southeasterly <br />the northeasterly side thereof; <br />roadways of said streets and the <br />hereof; provided, however, that <br />eye Street; southwest corner of <br />for a distance of 35.9 feet. That <br />that six (6), four (4) Inch vitri- <br />width of the sidewalks of said <br />all the streets or portions there. <br />Phelps Street and Buckeye <br />said hydraulic cement concrete <br />fied salt glazed tyle pipe sewer <br />streets are to be and are as <br />of included within said assess. <br />Street; southeast corner of Phelps <br />curb also be constructed upon <br />laterals be constructed along the <br />shown on the plans, profiles and <br />meat district and shown on the <br />Street and Buckeye Street; north- <br />the following corners along <br />line of said sewer on Phelps <br />specifications hereinafter particu• <br />map thereof shall be excepted <br />west corner of Phelps Street and <br />Phelps Street, to -wit: Northwest <br />Street and extending from the <br />larly referred to herein. <br />from any assessment levied for <br />Spruce Street; northeast corner <br />corner of Phelps Street and Maple <br />main sewer in the center of the <br />That the official elevations for <br />the cost and expenses of the work <br />