My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
BOOK 22_1948-08-17 to 1950-05-15
RedwoodCity
>
City Clerk
>
Minutes
>
1948 to 1950 Book 22
>
BOOK 22_1948-08-17 to 1950-05-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 2:56:33 PM
Creation date
10/12/2017 2:39:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Regular
Agency Type
City Council
Date
8/17/1948
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with City in regard to the allocation of property, Leslie Salt Company was also 407 <br />agreeable to turning the creek over to the City should the project go through. <br />�?201000 to ;25,000 more would be necessary in order to dredge the creek..5�11�,Q00 was <br />on hand. Councilman Granger suggested this be dropped from the agenda, study would <br />be continued until other recommendations could be made. Councilman Britschgi so moved, <br />z <br />seconded by Councilman Morgan, and carried. <br />�) REQUEST FOR PERMIT TO STORE BUILDING TEMPORARILY PENDING FURTHER A14D PERMANENT MOVING was <br />made by Chas. Archibald. Councilman Britschgi moved that request be granted subject <br />to time limit of 60 days, seconded by Councilman Swift. Dir. Archibald agreed to <br />furnish sufficient bond. Motion carried. <br />3 <br />PROPOSED PAVING ALAMEDA de las PULGAS FROM 1WITIPPLE AVENUE TO SAN CARLOS CITY LIMITS. City <br />Engineer Jain reported that the person circulating petitions had not reported to his <br />office. They were trying to get 60 of the residents' signatures. Councilman <br />Spillers moved that this be carried further on agenda, seconded by Councilman Morgan <br />and carried. <br />STORM DRAINS, WEST OF OAK RIDGE SUBDIVISION. City Engineer Jain reported that cost of <br />constructing a storm drain along Jefferson Avenue and along the west line of Oak <br />Ridge Subdivision to pick up storm waters originating west of Canyon Road in the <br />4 <br />County area would be about $3040. This would include 520 lineal feet of 1.5 inch <br />storm sewer and two catch basins, storm sewer to connect into existing catch basin atf <br />the NE corner of Jefferson Avenue and Oak Ridge Drive. He further stated that this <br />" improvement should be borne by the property owners who would benefit directly as this <br />policy had been followed in other sections of the City. Four lots would"be benefitted. <br />Dr. Jain thought a retaining wall would protect them from flood water at leas expense., <br />Councilman Granger thought Mr. Murphy, the original subdivider might be contacted and <br />a notified that he had some responsibility twoard alleviating this condition as the <br />1 <br />dyke he built indicated that drainage problem existed there. City Attorney Currie <br />t� <br />thought it would be between the people out there and the subdivider. It was conceded <br />that the City might assume some responsibility in asking the subdivider to h-elp. IJ[r. <br />Leslie Herman appeared and stated that 100 dump truck loads had been used to fill in <br />in addition to what Mr. D4urphy had done. Mr. Jain stated the natural channel had not <br />been diverted which was through the houses. Communication was to be written to Mr. <br />Yurphy and also the County in an effort to get some cooperation on their,part toward <br />3 <br />F <br />the problem. <br />WALKWAY ESTIMATE, COMMUNITY PARK. City Engineer Jain submitted estimate of the cost of <br />constructing an asphaltic plant mix walkway,around the exterior of the Ball Diamond <br />between the Recreation Center and the Creek and a redrock walkway from the.Creek to <br />Madison Avenue at $1070. This did not include the expense of moving the existing <br />foot bridge to a new location. Auditor Brophy stated there was no money left,in <br />Recreation Fund on account of the swimming pool. There was probably not enough in <br />the Park account, or the Street department. Councilman Granger moved that this be <br />referred to the budget study for the next fiscal budget, seconded by Councilman <br />Britschgi, and carried. <br />BOURQUIITIL:OTORS APPLICATION FOR USED CAR LOT PERMIT had been carried over on the, agenda to <br />check as to whether or not a new car dealer could have two lots for used trade-ins. <br />A second permit had previously been dinied to Weltner Motors for another used car lot <br />in addition to the first. City Attorney Currie thought there was some distinction <br />
The URL can be used to link to this page
Your browser does not support the video tag.