My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
BOOK 23_1950-05-15 to 1952-04-21
RedwoodCity
>
City Clerk
>
Minutes
>
1950 to 1952 Book 23
>
BOOK 23_1950-05-15 to 1952-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 4:19:34 PM
Creation date
10/12/2017 3:43:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Regular
Agency Type
City Council
Date
5/15/1950
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
58 SAPPHIRE STREET AND HARDING AVENUE <br />Tb2PROVEMENTS. City Engineer sub.. <br />ST. FRANCIS STREET, Street, between James Ave. <br />that drainage conditions on Ruby <br />mitted a report stating neo <br />nue and Jefferson Avenue would be egg <br />ravated and this street was already flooded ti <br />during storm periods. <br />It shwas believed that the storm drain shoulc e Dans ructed <br />art'af the improvement but that its cost should be borne from the lql� Bond <br />Red <br />as p <br />;I+ Funds for drainage improvements. <br />The reason was that the small area to be improved ; <br />of 1I <br />comprised only about one of the entire drainage area contributing to the flood cosi <br />rol <br />waters in this street and it was not felt that the property owners in this partieu- <br />Dis <br />Cast of the storm dral,o saiI <br />t, lar small improvement district should bear the entire cast. Sta# <br />p, <br />u't approximately 0,3600 and it was recommended that this amount be allocated from the <br />�. July <br />u1 lq�}l{ Bond Funds to construct storm drain under the same contract, provided that the recd <br />Mont <br />City Attorney and City Auditor rule that the conditions of the Band issue cover recol <br />this particular area• The decision should be made so that improvements could start Whit <br />Homell <br />i <br />{� before September 15th, otherwise it would have to be deferred until next summer. #p couni <br />Councilman itilargan moved that this be studied further at an adjourned meeting on the <br />j of t� <br />I <br />tl following Monday, July 10th, seconded by Councilman Jones and carried. <br />RESOLUTION No. 903 OF PRELIMINARY DETERMINATION - OAK, REESE AND JOHNSON STREET IMPROVE- <br />approximate cost .of 013 per <br />{� MENTS. This included a portion of Hawes Park b$ x 13, <br />I <br />front foot which would be paid by the'City. Councilman Royer offered a resolution <br />and moved its adoption, seconded by Councilman Morgan and carried on roll call, <br />Councilman Spillers noted absent. f <br />nt I <br />RESOLUTION No. 903 <br />I <br />RESOLUTION OF PRELIMINARY DETERMINATION <br />OAK, REESE AND JOHNSON STREETS <br />RESOLVED, by the City Council of the City of Redwood City, that it does here. <br />r by preliminarily determine that the public convenience and necessity require, and <br />that it intends to order, the following work to be done and improvements to be <br />made in and for said City, to wit: <br />(1) The improvement of Oak Avenue from King Street to a point opposite the <br />northerly line of Lot q, Block 1, resubdivision of Lot 29 Reese Subdivision, the <br />improvement of Johnson Street from Oak Avenue to Redwood Avenue, and the improve- <br />is went of Reese Street from Oak Avenue to Redwood Avenue by constructing and in <br />stalling therein 21' asphaltic concrete paving 311 wide on a 6" crusher run bock <br />base, standard concrete sidewalks on either side thereof and standard concrete <br />r; driveway approaches. <br />i; (2) The construction and installation of a stormm sewer system complete in <br />place as follows: <br />ii (a) In Reese Street a 15" reinforced concrete pipe storm sewer ex- <br />tending approximately 4$1 in a northwesterly direction in said <br />street from a standard reinforced concrete catch basin to be There <br />If constructed at the intersection of Reese Street and Redwood <br />Avenue to Redwood Creek, <br />$p25.0 <br />(b) In Johnson Street a 1511 reinforced concrete pipe storm sewer ex- issue <br />!I tending approximately 321 in a northwesterly direction in said P' City <br />street from a standard reinforced concrete catch basin to be insta <br />constructed at the intersection of Redwood Avenue and Johnson next <br />Street to Redwood Creek. <br />(c) 15" reinforced concrete pipe siphons at the following locations eightl <br />' complete with standard reinforced concrete catch basins at either fixed <br />end thereof, as follows: and s <br />that <br />1.- One across Reese Street at Oak Avenue. refer <br />I 2.- One across Johnson Street at Oak Avenue. Ment, <br />r, <br />(3) The construction and installation of 141 Calif <br />x 61 reinforced concrete box the <br />culverts complete with welded pipes, hand rails and reinforced concrete head walls <br />-at the following locations: <br />ing a <br />t (a) One across Johnson Street coveringRedwood Creek ata point newsp <br />approximately 701 northwesterly fom the intersection <br />tion of Johnson Counc <br />s' Street and Redwood Aveneu. least <br />(b) One across Reese Street coverin Redwood Creek at a paint aper°x" <br />1 imately 901 northwesterly from the intersection of Redwood Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.