My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 PLS Surveys Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 PLS Surveys Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 9:46:24 AM
Creation date
1/20/2005 11:03:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
PLS Surveys Inc
PROJECT NAME
engineering surveying services
RMP File Number
304.5
Date
1/14/2005
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />æ <br /> <br />PLS Surveys, Inc. <br />e-mail: plssurv@pacbell.net <br /> <br />2220 Livingston Street. Suite 202 <br />Oakland. California 94606 <br />510.261.0900 FAX 510.261.3303 <br /> <br />EXHIBIT IIA" <br /> <br />PROPOSAL <br /> <br />TO: <br />FROM: <br /> <br />TONIA TABUCCHI - CITY OF REDWOOD CITY <br /> <br />SUBJECT: <br />DATE: <br /> <br />JOSEPH M. BRAJKOVICH, PLS <br />SIPHON ELIMINATION PROGRAM - REDWOOD CITY, CA <br /> <br />OCTOBER 19, 2004 <br /> <br />DELIVERY VIA US MAIL <br /> <br />Surveying services will include the items as outlined in the scope of work date October 15,2004. <br /> <br />The "City Block Book" will be reviewed to detennine the approximate boundary and right-of-way <br />lines to be included on the base maps. <br /> <br />The controlling utility companies will be asked to supply mapping information in order to show <br />services and laterals. This mapping may only show approximate locations and may be the best <br />evidence of the utilities. The City should have u.S.A. mark the utilities prior to our surveying the <br />site. <br /> <br />We will establish control points that can be used for construction if no monuments exist. Levels will <br />be run over the control points based upon the City's datum. . <br /> <br />Following is a breakdown of the man-hours involved: <br /> <br />A. A 2-man crew will be used to perfonn the fieldwork <br />B. Research and meetings will be perfonned by the land surveyor in charge <br />C. Office drafting and plan preparation <br /> <br />32 MS. <br />20 MS. <br />40 ills. <br /> <br />TOTAL <br /> <br />$ 6,080. <br />1,700. <br />3.000. <br /> <br />$10,780. <br /> <br />Fees: <br /> <br />A. 32 MS. @ $190'/M. <br />B. 20 MS. @ $85./hr. <br />C. 40 MS. @ $75./hr. <br /> <br />Project sched2 be Z;: from nori.e to proceed <br /> <br />~raj~ <br /> <br />Vice-President <br /> <br />If you have any question, please call. <br /> <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.