My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RDA Min 1983-11-07
RedwoodCity
>
City Clerk
>
Minutes
>
Redevelopment
>
1980-1989 partial
>
1983
>
RDA Min 1983-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2005 10:35:59 AM
Creation date
3/30/2005 2:01:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Date
11/7/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Discussion followed and Mr. Friedman, Mr. Smith and City Attorney Schricker <br />commented and replied to questions regarding estimated time frames and phasing; <br />role of existing property owners; the fact that much of the affected area is owned <br />by the City; the preliminary steps necessary to proceed; the desire of the City <br />Center Development Company to enter into an agreement for exclusive right to <br />negotiate before proceeding with specific design; the requirements of the City; <br />the need for review stages during any period affected by an exclusive right in <br />order to determine if progress is being made; whether or not interest has been <br />expressed by or solicited from other developers; the avenues available to the City <br />with regard to redevelopment projects; the need for cooperation between the <br />developer and the City in working out designs; and the expectation of the Downtown <br />Plan being presented to Council soon for consideration before proceeding. <br /> <br />CONSENSUS: Mayor Stangel determined it to be the consensus of Council to refer <br />the Concept Master Plan presented by City Center Development Company to staff for <br />revi ew and further study. (memo 11/8/83) <br /> <br />Chairman Stangel thanked Mr. Brugger and his associates for the presentation. <br /> <br />ADJOURNMENT <br /> <br />Upon motion duly made, seconded and carried, the Redevelopment Agency adjourned at <br />7:40 p.m. <br /> <br />JACQUELINE C. HILDEBRAND <br />City Clerk <br /> <br />Redev.Agency <br />11/7 /83 <br />Page 2 <br /> <br />MINUTE BOOK NO. 44 <br />Page No. 265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.