My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Beals Group, The
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Beals Group, The
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:28:35 PM
Creation date
4/19/2005 11:13:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Group, The
PROJECT NAME
Redwood City school fields
RMP File Number
304
Date
7/8/1999
Reso Ref
13617
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT B <br /> <br />PROJECT PAYMENT SCHEDULE MATRIX <br /> <br />FOR <br /> <br />CITY OF REDWOOD CITY <br /> <br />REDWOOD CITY SCHOOL RENOVATIONS PROJECT <br /> <br />I. <br /> <br />PROFESSIONAL COMPENSATION <br /> <br />Based on Scope of Services shown under "Exhibit A," "Scope of Services. for <br />REDWOOD CITY SCHOOL RENOVATIONS PROJECT, the beals group, inc. <br />proposes the following fixed fee for completion of the Scope of Work. <br /> <br />A. Project Start-up and Pre-planning $ 12,110.00 <br />B. Analysis and Design $ 35,595.00 <br />C. Design Development $ 19,055.00 <br />D. Construction Documents $ 54,150.00 <br />E. Construction Services $ 60,550.00 <br />F. Reimbursables $ 6,000.00 <br />G. MTH Engineers (Sub-Consultant) - $8,100 x 1.20 $ 9,720.00 <br />TOTAL PROPOSED FEES: $197,180.00 <br /> <br />PROJECT HOURS MATRIX <br /> <br />II. <br /> <br />Please refer to the pages that follow for the task and hourly breakdown. <br /> <br />III. <br /> <br />DIRECT EXPENSES <br /> <br />Direct expenses charged by the beals group, inc. team include mileage, in-house <br />computer plotting, and printing, and outside services such as printing, reproduction, soil <br />fertility testing, photo processing, etc. <br /> <br />IV. <br /> <br />ADDITIONAL EXPENSES <br /> <br />The following are expenses that are not included in the PSE. <br /> <br />. Production printing for check sets and bid sets will be paid directly by the City and <br />are not included in these additional expenses. <br /> <br />. Topographic survey <br /> <br />. Aerial survey <br /> <br />J:IPROPOSALSIP99\P99-06 RWCITY SCHOOL RENOVA TIONSIP-SCOPE- EXHIBIT B 4-16-99.DOC <br /> <br />Page: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.