Laserfiche WebLink
<br />Project Deliverables: <br /> <br />Task 1 Project Management and Coordination <br />1.1 Meeting minutes and agendas <br /> <br />Task 2 Miscellaneous Technical Studies <br />2.1 Project base topographic mapping <br />2.1 Field survey results <br />2.2 Geotechnical Report <br /> <br />Task 3 Conceptual Engineering <br />3.1 Conceptual Geometries, including typical sections (as appropriate) <br />3.2 Public Meeting Exhibits <br /> <br />Task 4 <br /> <br />Final Design <br /> <br />4.1 65% Plans, Outline Specifications, Quantities, and Preliminary Construction Cost <br />Estimate <br /> <br />4,1 90% Plans, Specifications and Estimate <br /> <br />4.1 100% Plans, Specifications and Estimate <br /> <br />4.1 Final, Mylar reproducible set of plans and electronic files, camera ready specifications <br />and special provisions and electronic files, Final Estimate of Construction Cost <br /> <br />M:\O'6-99IProposa~PRP -' V6WPD <br /> <br />Shores Area Street System Improvements <br />Page 11 <br /> <br />Proposal- City of Redwood City (April 26, 1999) <br /> <br />"""""".""."-"'- <br />