My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-04-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 3:01:42 PM
Creation date
4/21/2005 4:08:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/25/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ð ,ð- /?' <br /> <br />Mitigation: The following mitigation measure, as set forth in the FEIR, is hereby <br />adopted and will be implemented as provided in the mitigation monitoring and reporting <br />effort: <br /> <br />No disturbance of archaeological nature is anticipated at the Project site <br />since the Plans show that excavation will not occur deeper than the <br />existing building footings of the South Annex. The sole area which has the <br />potential for undisturbed soil is the "hyphen" or building connection <br />between the South Annex and the Courthouse. Further archival and field <br />study and monitoring (as needed) by a qualified archaeologist will be <br />required to address the presence (or lack thereof) of archaeological <br />resources in conformance with the Standards and the City-adopted <br />Cultural Resources Management Plan. <br /> <br />Monitoring: Prior to City Council consideration of the Project, staff hired a <br />qualified archeologist who submitted additional documented evidence that confirmed <br />that Project excavation would not result in an impact on archeological resources. Staff <br />has secured an agreement with a qualified archeologist whose presence on site during <br />excavation of the "hyphen" between the South Annex and the old Courthouse will be <br />coordinated by staff in conformance with the Standards and City-adopted Cultural <br />Resources Management Plan. <br /> <br />Finding: The mitigation measure is feasible and would reduce the impacts of the <br />Project to less-than-significant levels because the measure would conform to the <br />Standards and the City's Cultural Resources Management Plan relating to the treatment <br />of such historic resources. <br /> <br />Atty/Reso/Reso.1530 <br />042005 <br /> <br />7 <br /> <br />..,." "".-"""--.""'.'.'.'.""---""'-"'T--"--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.