My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 FTB - Freedman Tung & Bo
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 FTB - Freedman Tung & Bo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 4:04:03 PM
Creation date
5/4/2005 11:17:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
FTB - Freedman Tung & Bottomley
PROJECT NAME
Courthouse Plaza Design
RMP File Number
304
Date
4/27/2005
MO Ref
05-72 RD-05-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SFE <br /> <br />7. Prepare Landscape Architectural (LA) General Notes, Legend and <br />Abbreviations Sheet: Prepare a 60% complete LA General Notes, Legend and <br />Abbreviations sheet that establishes the key landscape architectural drawing notes, <br />graphic symbols and construction detail references. <br /> <br />8. Prepare Plaza and Hardscape Layout and Reference Plans: Prepare the 60% <br />complete Layout and Reference Plans that locates the key plaza and hardscape features of <br />the project, and references the associated LA plan enlargements and construction details. <br /> <br />9. Prepare Planting Plans: Prepare the 60% complete Planting Plans that locate and <br />identify the primary and secondary plant materials, based on the plant palette previously <br />developed by FTB, SFE, the arborist and the City. <br /> <br />10. Prepare Irrigation Plans: Prepare the 60% complete Irrigation Plans. These plans <br />will identify the primary irrigation equipment, and establish the irrigation layout based on <br />the on the 60% complete Planting Plans. <br /> <br />11. Prepare Plaza and Hardscape Construction Detail Sheets: Based on FTB's <br />schematic design details, prepare 60% complete plaza and hardscape construction detail <br />sheets. <br /> <br />12. Prepare Planting Detail Sheets: Based on the Planting Plans, prepare 60% <br />complete planting detail sheets based on the standard details of the City of Redwood City <br />and the best practices for unique planting conditions. <br /> <br />13. Prepare Irrigation Detail Sheets: Based on the Irrigation Plans, prepare 60% <br />complete irrigation detail sheets based on the standard details of the City of Redwood <br />City and the best practices for unique irrigation conditions. <br /> <br />14. Prepare LA Technical Specifications: Based on the standard specification fonnat <br />of the City of Redwood City, prepare a 60% complete LA technical specification. <br /> <br />15. Post 60% Complete LA Construction Documents to Reprographic FTP Site: <br />Post the 60% complete LA Construction Documents to the repro graphic company FTP <br />site for copying and distribution to FTB and the project team. <br /> <br />16. Revise 60% CD's based on FTB Review: Based on the review ofFTB, revise the <br />60% complete LA construction documents. <br /> <br />17. Attend All Day 60% Review Meeting: Attend an all day 60% review meeting at <br />FTB to identify key areas of work prior to the city submittal, and further the coordination <br />between the project team members. <br /> <br /> <br /> <br /> <br /> <br />'>".".'~""'---'._'_._"'--'T."-""'. ..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.