My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt89 Kennedy Jenks Chi... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1989
>
Agmt89 Kennedy Jenks Chi... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:27 PM
Creation date
6/11/2002 9:31:28 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Chilton
PROJECT NAME
water storage reservoir No. 2 RWS
RMP File Number
304
Date
5/10/1989
Reso Ref
10977
Box
2772
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit 'A" <br /> <br /> SCOPE OF ENGINEERING SERVICES <br /> <br /> CONSTRUCTION MANAGEMENT FOR <br /> WATER STORAGE RESERVOIR NO. 2 <br /> <br /> This scope of services includes only the construction engineering services <br /> work associated with this project, designed by CB2M Bill, as follows: <br /> <br /> OFFICE ENGINEERING SERVICES <br /> <br /> 1. Bid and Award Phase <br /> <br /> 1.1 Attend prebid conference. <br /> <br /> 1.2 Prepare Contracts Administration Manual (CAM). <br /> <br /> CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES <br /> <br /> The Engineer shall appoint from the Engineer's staff, a Construction Manager. <br /> The Construction Manager shall represent and act on behalf of the City in <br /> administering the agreements between the City and the Contractor. In doing <br /> this, the Construction Manager shall be the single point of communication <br /> between the Engineer, and the Contractor, and the City. The authority limits <br /> of the Construction Manager in contract administration shall be as defined in <br /> the CAM prepared by the Construction Manager and approved by the City. <br /> <br /> Following award and execution of the Contract, provide field construction <br /> management and inspection services as follows: <br /> <br /> 2. Bazardous Waste Removal <br /> <br /> Provide full-time on-site inspection services during the removal of <br /> contaminated site materials. A trained hazardous waste specialist must <br /> be assigned specifically to monitor the Contractor's contaminated <br /> materials removal program. The hazardous waste engineer will be <br /> responsible for: <br /> <br /> 2.1 Establishing and f ~f''~ : '~' a personal health and safety plan <br />~;// &~/~¢ .... _~._= ,aintaining and operating appropriate monitoring <br /> equipment (BNu) and personal protective clothing. We assume that <br /> level D protective gear (as defined by EPA) will be used. <br /> <br /> Page 1 of 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.