Laserfiche WebLink
<br />SCOPE OF SERVICES <br />Exhibit "A" <br /> <br />To <br /> <br />Agreement for At-Risk Construction Management/General Contractor Services <br />During Construction of the <br />Historic Courthouse Renovation Project <br /> <br />GENERAL DESCRIPTION. The CM/GC's Services on the Project will include, but not <br />necessarily be limited to, the activities described below. Terms that are defined in the <br />Agreement for At-Risk Construction Management/General Contractor (CM/GC) Services during <br />Construction will have the same meaning in this Exhibit "A". <br /> <br />PRECONSTRUCTION PHASE. <br /> <br />2.1.1 Budqet and Cost Review. Services shall include preparation of conceptual and periodic <br />estimates, budget assessment and cost containment advice, and value engineering studies and <br />recommendations. <br /> <br />.1 CM/GC will prepare a Project Budget in CSI Format and cash flow analysis <br />including all preconstruction and construction activities. The budgets shall include all <br />Construction Costs, General Conditions, bonds and insurance and "soft costs" such as design <br />fees, permits. CM/GC shall review the budgets with the City/Agency and submit the Project <br />Budget to the City/Agency for review and acceptance. The Project Budget shall be revised as <br />directed by the City/Agency, and as agreed upon by CM/GC. <br /> <br />.2 CM/GC shall prepare an estimate of construction costs for each Trade Contract <br />construction package based on drawings and specifications approved by City/Agency. Each <br />approved estimate will supersede the prior estimate upon approval of the cost summary by <br />City/Agency. CM/GC shall advise City/Agency in writing, if it appears that the costs of the <br />Project will exceed the Project Budget and CM/GC shall identify and make recommendations for <br />completion of the Project within the Project Budget. <br /> <br />2.1.2 Phased Construction. Certain portions of the Work may be bid before final documents <br />for the remainder of the Work are complete and approved by City/Agency. CM/GC shall <br />manage these phased construction bids and contracts in accordance with the proposed Project <br />Budget and the Master Schedule. Should the costs for any phase of construction or any <br />Atty/Agr/2005.003 <br />030805/L. Beck/50? 588v? <br /> <br />Page 19 of 30 <br />