My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Josh Cahalan ASLA
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Josh Cahalan ASLA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:57:56 PM
Creation date
5/9/2005 11:29:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Josh Cahalan ASLA
PROJECT NAME
landscape architectural services
RMP File Number
304
Date
3/1/1999
Reso Ref
13561
MO Ref
99-125 01-110
Task Order
Yes
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />John Cahalan <br />Landscape Architect <br /> <br />Landscape Architecture <br />Urban Planning & Design <br />Environmental Planning <br /> <br />0 \J,@ffiU\'U\i,~ <br />~ JUL Z i\ '/.061 <br />WOOD C\1'l <br />C\1'l Of RE.~ CO~S1RUC1\ON <br />tNG\~£tR\t-\G <br /> <br />July 20, 2001 <br />(650) 780-7371 <br /> <br />Mr. Jon Lynch, City Engineer <br />Engineering & Construction <br />1017 Middlefield Road <br />P.O. Box 391 <br />Redwood City, CA 94064-0391 <br /> <br />RE; EI Camino Real Medians Landscaping/Task Order Amendment #2 <br /> <br />Dear Jon, <br /> <br />As requested, the following is a description of the additional tasks necessary to assist you with <br />Construction Support Services. The fee for the electrical plans is lump sum in the amount of <br />$2,500. Tasks 3.05 through 3.07 will be invoiced on an hourly basis as authorized by you. <br /> <br />3.0 <br /> <br />BIDDING & CONSTRUCTION ADMINISTRATION: <br /> <br />3.05 <br /> <br />3.06 <br /> <br />3.07 <br /> <br />3.û8 <br /> <br />Site Reviews/Field Reports: Conduct an additional nine (9) site reviews of work in <br />progress to verify conformance with plans and specifications. Issue written field report <br />documenting observations and making recommendations to the City Representative and <br />Contractor(s). (This brings the total number of site visits to seventeen (17)). <br /> <br />Substantial Completion Walk-Through: Conduct a walk through after the project is <br />considered substantially complete by City Representative and Landscape Architect. <br />Compile a "punch list" of items to be completed prior to final walk-through. <br /> <br />Final Walk-Through: Conduct a final walk through to verify that all work has been <br />completed prior to issuance of final payment to Contractor. <br /> <br />Eiectrical PansiCaiculations: Prepare electrical plans for the irrigation controllers <br />utilizing the existing electrical points of connections at the existing irrigation controllers <br />and booster transformers. Provide calculations for voltage drops. <br /> <br />Fee.................................................................................................................$9,500 <br /> <br />Please feel fr e to call me if you have any questions. <br /> <br /> <br />John Cahalan,ASLA <br />CA Reg. No. 2894 <br /> <br />15495 Los Gatos Blvd" Suite 5 . Los Gatos, California 95032 . (408) 358-5122 . Fax (408) 358-5133 . CA Reg. No, 2894 <br />. jcahalan@JPS.net <br /> <br />..._,.........._-,._".,-_.~..__.._..._-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.