My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 CALTRANS
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 CALTRANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2007 9:00:02 AM
Creation date
5/17/2005 8:28:27 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CALTRANS
PROJECT NAME
Ralston - Marine Pkwy cooperative agreement
RMP File Number
304
Date
6/23/2003
MO Ref
03-138 05-78
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />015599 <br /> <br />Distnct Agreement No. 4-1964-C <br /> <br />request by STATE to discontinue the services of any personnel considered by STATE to be <br />unqualified on the basis of credentials, professional expertise, failure to perform in <br />accordance with scope of work, andl or other pertinent criteria. <br /> <br />4. <br /> <br />If a consultant is used to prepare plans and specifications and administer a construction <br />contract for PROJECT, to follow the consultant Selection Procedures for Federally-funded <br />Highway Projects specified in Volume I, Section II of STATE's current Local Programs <br />Manual. <br /> <br />5. <br /> <br />Personnel who prepare the PS&E shall be available to STATE, at no cost to STATE, <br />through completion of construction of PROJECT to discuss problems which may arise <br />during construction andl or to make design revisions for contract change orders. <br /> <br />6. <br /> <br />Personnel who prepare right of way maps, documents and related materials shall be <br />available to STATE, at no cost to STATE, during and after construction until completion <br />and acceptance by STATE of Right of Way Record Maps and Records of Surveys. <br /> <br />7. <br /> <br />To apply for necessary encroachment permits in accordance with STATE's standard permit <br />procedures for required work within State highway rights of way, including performing <br />surveying and other investigative activities required for preparation of the ED and/ or <br />PS&E. <br /> <br />8. <br /> <br />Material testing and quality control shall conform to the State Construction Manual and <br />the State Material Testing Method issued by the Transportation Lab, Volumes 1, 2 and 3, <br />and shall be performed, at CITY expense, by a certified material tester acceptable to <br />STATE. Independent assurance testing, specialty testing, and off-site source inspection <br />and testing shall be performed by STATE, at no cost to CITY except as noted herein. CITY <br />shall reimburse STATE for any additional travel expenses incurred by STATE for off-site <br />inspection and testing performed by STATE which is more than 300 airline miles from both <br />Sacramento and Los Angeles. Approval of the type of asphalt and concrete plants shall be <br />by STATE, at STATE expense. <br /> <br />9. <br /> <br />To identify and locate all high and low risk underground facilities within the PROJECT <br />area, and to protect or otherwise provide for such facilities, all in accordance with STATE's <br />"Manual on High and Low Risk Underground Facilities Within Highwav Rights of Way." <br />CITY hereby acknowledges receipt of STATE's "Manual on High and Low Risk Underground <br />Facilities Within Highway Rights of Way." Liability for the positive identification of utilities <br />(potholing) shall be determined in accordance with STATE policies and procedures <br />including, but not limited to, the Streets and Highways Code and Agreements executed <br />with the owners of such facilities (e.g., Master Agreements and Agreements for the Positive <br />Location of Underground Utilities). <br /> <br />10. To identify and locate all utility facilities within the PROJECT area as part of its PROJECT <br />design responsibility. All utility facilities not relocated or removed in advance of <br />construction shall be identified on the PROJECT plans and specifications. <br /> <br />11. To furnish evidence to STATE, in a form acceptable to STATE, that arrangements have <br />been made for the protection, relocation, or removal of all conflicting facilities within <br />STATE's right of way and that such work will be completed prior to the award of the <br />contract to construct PROJECT or as covered in the Special Provisions for said contract. <br />This evidence shall include a reference to all required State highway encroachment <br />permits. <br /> <br />2 <br /> <br />... """""""""--"""""""--""T""" <br />
The URL can be used to link to this page
Your browser does not support the video tag.