Laserfiche WebLink
<br />--______m-- __LeJC!ted - GQOgitiOrlSuand _~p~çific~tiQn$_as --- establisbe_d_by_Cjty - according_to- Jts_- -- --- ---- <br /> <br />-.-------. -- --- ---.----.-- -- <br /> <br />standard practice. Should RCN remove the Fiber Optic Network Facilities from <br /> <br />the Public Right-of-way, RCN shall, within ten (10) Days after such removal, give <br /> <br />written notice thereof to City specifying the right-of-way affected and the location <br /> <br />thereof as well as the date of removal. <br /> <br />Before proceeding with removal or <br /> <br />relocation work, RCN shall obtain an Encroachment Permit from the City. If RCN <br /> <br />does not return the affected site to a safe and satisfactory condition, then City <br /> <br />shall have the option to perform or cause to be performed such reasonable and <br /> <br />necessary work on behalf of RCN and charge the actual costs incurred to RCN. <br /> <br />Upon receipt of a demand for payment by City, RCN shall reimburse City for such <br /> <br />costs. <br /> <br />9. Construction Encroachment Permit and Fees: Trench Cut Fees: <br />Inspector. <br /> <br />(a) <br /> <br />RCN shall apply for a project specific Encroachment Permit for all <br /> <br />work within the Public Right-of-Way and any other regulatory permits. RCN shall <br /> <br />furnish detailed plans of the work and other such information as required by the <br /> <br />Director, including a detailed map showing the layout of the proposed facilities <br /> <br />and all existing facilities located in or immediately adjacent to the area subject to <br /> <br />the Encroachment Permit, and shall payor deposit with City all applicable costs <br /> <br />such as processing fees, field marking, plan review, engineering and inspection <br /> <br />fees related to the proposed work, and City's actual legal fees for the preparation <br /> <br />Agmt-245 <br />G\shared\share d\Red wood\Co un e i I <br />FXS/fs <br />03/15/99 <br />04/05/99; 04/20/99 <br /> <br />14 <br />