My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 S J Amoroso Construction
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 S J Amoroso Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:59:51 PM
Creation date
5/19/2005 2:54:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
S J Amoroso Construction
PROJECT NAME
police facility roof drainage
RMP File Number
304
Date
6/29/1999
Reso Ref
13634
Box
5900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fifty (50) percent of the cost of Reconstruction. The estimated maximum cost of <br />Reconstruction and City's maximum contribution are calculated as follows: <br />(i) 370 lineal feet ("Lt.") of flashing @ $65 per Lt. = $24.050 <br /> and gutter <br /> 1020 Lt. of flashing @ $45 per Lt. = 45,900 <br /> tie-in to catch basin = 2.500 <br /> Total = 72,450 <br />(ii) Maximum amount to be contributed by <br /> City and Architect: 50% of $72,450 = 36.225 <br />(iii) City's maximum contribution: <br /> 36,225.00 - 7,684.00 (Architect's maximum <br /> contribution) = 28.541 <br /> <br />Upon completion of the Reconstruction, Contractor shall determine the <br /> <br />actual cost of Reconstruction corresponding to the foregoing unit cost items (i.e., <br /> <br />based upon the actual lineal footage constructed corresponding to the above <br /> <br />rates of $65 per I.f. and $45 per Lt., respectively, plus the lump-sum cost for the <br /> <br />tie-in to catch basin). From one-half of said actual cost, Architect's contribution <br /> <br />in the amount of 10.6 percent of the actual cost of Reconstruction (not to exceed <br /> <br />$7684) shall be deducted and the remaining balance shall be City's actual <br /> <br />contribution toward the cost of Reconstruction; provided, that said amount shall <br /> <br />not exceed the aforementioned maximum amount of $28,541. <br /> <br />(b) <br /> <br />Upon verification by City to City's satisfaction of the aforesaid <br /> <br />actual cost of Reconstruction, and with thirty (30) day of submittal of the <br /> <br />aforesaid invoice (unless City shall protest the amount of said payment) City <br /> <br />Agmt-194 <br />f\sh\sh\RC\Councii <br />DES:rg <br />09/09/98; 02/08/99R; 03/01/99R <br /> <br />9 <br /> <br />..".,._-............~-_..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.