Laserfiche WebLink
<br />ORIGINAL <br /> <br />FXS:djk 09/16/99 <br />F:Shared/R.~. \'Ood/Council/Agmt-291 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, hereinafter <br />referred to as "City", and SALIBA CORPORATION of San Francisco, California, hereinafter <br />referred to as "Contractor", for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br />of the labor, equipment, materials, and tools to perform, within Ninety (90) calendar days <br />after the NOTICE TO PROCEED, the following work: <br /> <br />1999-2000 SEWER MAIN REPLACEMENT PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the City Engineer of Redwood City, which Documents are <br />incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Four Hundred Eighty-six Thousand <br />Six Hundred Thirteen and 64/100 Dollars ($486,613.64) computed in accordance with <br />Contractor's accepted Proposal dated September 15, 1999, which accepted Proposal is <br />incorporated herein by reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, City or its authorized representative, and the work shall be done in the best <br />workmanlike manner, conforming strictly to the provisions of the specifications and plans <br />made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, inclusive, <br />of the California Labor Code relating to working hours. Contractor shall, as a penalty <br />to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed in <br />the execution of the Contract by Contractor or by any subcontractor for each calendar <br />day during which such worker is required or permitted to work more than 8 hours in <br />anyone calendar day and 40 hours in anyone calendar week, unless such worker <br />receives compensation for all hours Worked in excess of eight (8) hours at not less <br />than 1-1/2 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per <br />diem wages as determined by the Director of the California Department of Industrial <br />Relations. Pursuant to the provisions of California Labor Code Section 1773.2, <br />Contractor is hereby advised that copies of the prevailing rate of per diem wages and <br />a general prevailing rate for holidays, Saturdays and Sundays and overtime work in <br />the locality in which the work is to be performed for each craft, classification, or type of <br />worker required to execute the Contract, are on file in the office of the City Clerk, <br />which copies shall be made available to any interested party on request. Contractor <br />shall post a copy of said prevailing rate of per diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay <br />travel and subsistence payments to each worker needed to execute the work, as such <br /> <br />".--...--.....-....................-.,...-..--.--...-----.. ..'" <br />