Laserfiche WebLink
<br />~ Green , <br />~Envlronment me. <br /> <br />WWW,¡'~."""'i'oome"t com <br /> <br />"On Broadway" Parking Garage Dewatering Proposal <br /> <br />Page 6 <br /> <br />of Intent Contents (attached) signed by the design engineer. The City will pay <br />the NPDES permit annual fee. <br /> <br />Design, installation and maintenance (except where specifically stated) of the <br />treatment system are not included in this proposal. <br /> <br />All waste disposal and storage costs, including treated water, will be paid directly <br />by the City. This estimate does not include a cost for temporary holding tanks <br />during system test periods. <br /> <br />GEl assumes start-up will only require one cycle. <br /> <br />GEl assumes the treatment design will incorporate two (2) effluent discharge <br />sampling points. If the actual number of discharge points differs, estimated costs <br />would be adjusted accordingly. <br /> <br />Respectfully submitted, <br /> <br />Pl~ ~~ <br />Mark Green <br />President, Green Environment inc. <br /> <br />Page 6 <br /> <br />r <br /> <br />r- <br /> <br />. r .,. d_- T <br />