Laserfiche WebLink
6.1.D. - Page 11 <br />CE&G <br />Schedule of Charges 2017 <br />1. Professional Services. These are "all -up" rates, and include direct salary cost, overhead, general and administrative costs <br />not separately accounted for, and profit <br />Personnel <br />2017 <br />Rates/Units <br />Principal Engineer/Geologist <br />$ <br />225 <br />per hour <br />Associate Engineer/Geologist <br />$ <br />200 <br />per hour <br />Senior Engineer/Geologist <br />$ <br />184 <br />per hour <br />Project Engineer/Geologist <br />$ <br />147 <br />per hour <br />Staff Engineer/Geologist <br />$ <br />131 <br />per hour <br />Technician (Straight rate prevailing wage) <br />$ <br />118 <br />per hour <br />GIS/CARD Specialist <br />$ <br />110 <br />per hour <br />Project Assistant <br />$ <br />84 <br />per hour <br />Administration/Clerical <br />$ <br />79 <br />per hour <br />Special Inspector (Straight rate prevailing wage; no 4 -hr min) <br />$ <br />121 <br />per hour <br />Deposition/Court Testimony (minimum 4 hours) <br />$ <br />370 <br />per hour <br />Field and Laboratory Tests <br />2017 <br />Rates/Units <br />Concrete Compressive Strength Testing <br />$ <br />36 <br />per cylinder <br />Moisture Content (ASTM D 2216) <br />$ <br />21 <br />per test <br />Moisture & Density (ASTM D 4318) <br />$ <br />28 <br />per test <br />Atterberg Limits (ASTM D 4318) <br />$ <br />185 <br />per test <br />Compaction Curve, 4" mold (ASTM D 1557) <br />$ <br />235 <br />per test <br />Compaction Curve, 6" mold (ASTM D 1557) <br />$ <br />290 <br />per test <br />Wash over #200 Sieve (ASTM D 1140) <br />$ <br />65 <br />per test <br />Sieve Analysis with #200 Wash (ASTM D 422) <br />$ <br />135 <br />per test <br />Sieve & Hydrometer (ASTM D 422) <br />$ <br />210 <br />per test <br />Reimbursables <br />2017 <br />Rates/Units <br />Mileage (per allowable federal) <br />$ <br />0.55 <br />per mile <br />Nuclear Gage <br />$ <br />52 <br />per day <br />Inclinometer <br />$ <br />179 <br />per day <br />Vane Shear Device <br />$ <br />103 <br />per day <br />2. Travel Time. Travel time will be charged at regular hourly rates, not to exceed eight (8) hours per day. <br />3. Expenses. All direct costs will be billed at actual cost plus 10%, unless there is explicit agreement otherwise. Direct costs <br />include: <br />• Third party services -Fees for subcontracted third party services (including drilling and backhoe services, special <br />consultant fees, permits, special equipment rental, overnight mail or messenger services and other similar project <br />related costs) <br />• Travel expenses, including airfares, hotel, meals, ground transportation, and miscellaneous expenses. <br />• Reproduction costs, including photocopy, blueprints, graphics, photo prints or printing. <br />4. Subconsultants. To the extent that it becomes necessary to use subconsultants, Client will be invoiced at cost plus 10% <br />to cover insurance liability and other overhead costs. <br />S. Accounting. The cost of normal accounting services for invoicing has been considered in the overhead expense which is <br />included in the above hourly rates. Additional requirements for invoice verification, such as copies of time sheets, detailed <br />expense records, and supplemental daily work justification will be billed on an hourly basis. <br />Progmotic Expertise" <br />ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />