|
<br />£><HIÖ.:t, .A
<br />
<br />ESTIMATED COSTS FOR
<br />
<br />ROUTE 84 (WOODSIDE ROAD) WIDENING PROJECT. PHASE II
<br />
<br />.. MAR~THOMAS &CO, INC. .' , ' ,TOTAl; ..~á,ri~~..~,..Su9imu~~TOTAl Fël1f&ÞéÖrs" TOTAL TOTAL
<br />" .., '... ~. 2~ANRèirrib. , ,"", Ge¡)tetl1 &LaIl~S~ap¡ng) ,,' ,,(Si9naIMLÎ9ht¡ng) , F&P' ESTIMATED
<br />JC/PC PESR D~ DE ~SURVEY , MÍCó, PM'PE Sr. Dgr. Reimb. Subs PM PE" Engr Rèirnb. COSTS
<br />
<br />i
<br />,
<br />î
<br />
<br />TASK
<br />Task 1 - Design Concept Approval
<br />1.1 Project Management & Meetings
<br />1.2 Data Gathering & Review
<br />1.3 Mapping
<br />1.4 Utility Coordination
<br />1.5 Drainage Report
<br />1.6 Geotechnical Design Report/Borings
<br />1.7 Aerially Deposited Lead Test & Report
<br />1.8 Phase II Testing
<br />1.9 SWPPP Report
<br />1.10 GPS Report
<br />1.11 Utility Potholing
<br />1.12 Lane Closure Report
<br />Subtotal Task 1
<br />Task 2 . Survey. RJW Engineering
<br />2.1 Field Survey for Design
<br />2.2 Right of Way Engineering
<br />a) Hardcopy Maps
<br />b) Appraisal Maps
<br />c) Field Surveys for Controls
<br />Subtotal Task 2
<br />Task 3 - Preliminary 35% Design
<br />3.1 Line Drawings
<br />a) TitlelTypical Sections
<br />b) Layout
<br />c) Drainage
<br />d) Pavement Delineation
<br />e) Signing
<br />n Signals/Lighting Concept
<br />g) Landscape & Irrigation
<br />Subtotal Task 3
<br />
<br />I
<br />
<br />:
<br />!
<br />-1
<br />1
<br />
<br />14,399
<br />
<br />960
<br />7,680
<br />
<br />2,539
<br />846
<br />
<br />1,440
<br />
<br />2,539
<br />6,770
<br />
<br />24,719 21,791
<br />
<br />240
<br />
<br />3,385
<br />3,808
<br />846
<br />423
<br />
<br />960
<br />
<br />5,077
<br />
<br />5,760 12,694
<br />4,320 10,155
<br />1,920 3,808
<br />
<br />16,319 43,581
<br />
<br />240
<br />960
<br />960
<br />240
<br />240
<br />
<br />1,692
<br />6,770
<br />2,539
<br />1,692
<br />1,692
<br />
<br />2.640 14,386
<br />
<br />635
<br />
<br />10,403
<br />
<br />13,870
<br />
<br />1,734
<br />
<br />1,858
<br />
<br />1,156
<br />6,357
<br />
<br />2,477
<br />4,128
<br />
<br />1,156
<br />
<br />2,064
<br />
<br />206
<br />
<br />10,733
<br />
<br />867
<br />
<br />619 36,480
<br />
<br />7,430 12,160
<br />4,954
<br />
<br />867
<br />
<br />12,160
<br />20,434 64,448
<br />
<br />1,734
<br />5,779
<br />3.468
<br />1,734
<br />1,156
<br />
<br />2,064
<br />6,192
<br />2,890
<br />2,477
<br />2,064
<br />
<br />15,686
<br />
<br />6,080
<br />
<br />15,650
<br />14,200
<br />350
<br />500
<br />9,000
<br />
<br />6,080 42,900
<br />
<br />250
<br />2,750
<br />100
<br />100
<br />
<br />16,938
<br />4,688
<br />2,750
<br />6,271
<br />18,795
<br />
<br />4,249 12,118 10,062 26,50011 52,929
<br />
<br />16,285
<br />14,200
<br />7,915
<br />18,068
<br />10,053
<br />663
<br />
<br />116,625114,249 12,118 10,062 26,5ool1s2,929
<br />
<br />44,003
<br />
<br />1,600
<br />250
<br />
<br />39,644
<br />19,678
<br />17,888
<br />
<br />121,213
<br />
<br />1,850
<br />
<br />1.500
<br />
<br />5.730
<br />21,201
<br />9,856
<br />6,143
<br />5,152
<br />
<br />1,500
<br />
<br />4.464 2,995 3,120
<br />48,08211 4,464 2,995 3,120
<br />
<br />10,579
<br />10,579
<br />
<br />Page 2 a~ 3
<br />
<br />Prepared by: Mark Thomas & Co. Inc.
<br />
<br />1,344
<br />
<br />2.451
<br />
<br />2,150 4,596
<br />
<br />3,494
<br />
<br />7,047 3,200
<br />
<br />1,613
<br />
<br />4,085 5,119
<br />
<br />1,613
<br />
<br />4,085 5,119
<br />
<br />3,200
<br />
<br />100
<br />100
<br />
<br />6,846
<br />13,841
<br />
<br />450
<br />
<br />11,267
<br />
<br />450
<br />
<br />11,267
<br />
<br />an/oo
<br />
<br />6,995
<br />
<br />",938
<br />,,682
<br />2,750
<br />6.271
<br />18,795
<br />52,929
<br />16,285
<br />14,200
<br />7,915
<br />18,068
<br />10,053
<br />7,509
<br />
<br />183,395
<br />
<br />44,003
<br />
<br />.644
<br />19,678
<br />17,888
<br />
<br />121,213
<br />
<br />5,730
<br />21.201
<br />9,856
<br />6,143
<br />5,152
<br />11.267
<br />10,579
<br />
<br />69,929
<br />
|