Laserfiche WebLink
<br />E5TIMA TED LEVEL OF 5T AFFING FOR Prepared by: Mark Thomas & Co. Inc. <br />ROUTE 84 (WOODSIDE ROAD) WIDENING PROJECT. PHASE II 8/7/00 <br /> Mark Thomas &Co. TOTAL Parikh & Sugimura TOTAL Fehr & Peers TOTAL TOTAL <br /> 2 MAN (Geotech & Landscaping) (Signals/Lighting) HOURS <br />TASK JC/PC PE SRDE DE SURVEY MTCO PM PE Dgr. Subs PM PE Engr Fehr & Peers ALL <br />Task 1 - Management, Reports, etc. <br />1.1 Project Management & Meetings 120 24 144 144 <br />1.2 Data Gathering & Review 8 24 36 68 10 24 40 74 142 <br />1.3 Mapping <br />1.4 Utility Coordination 24 16 48 88 88 <br />1.5 Drainage Report 12 64 88 80 244 244 <br />1.6 Geotechnical Design ReporUBorings 32 136 176 344 344 <br />1.7 Aerially Deposited Lead Test & Report 6 6 6 <br />1.8 Phase II Testing <br />1.9 SWPPP Report 8 32 16 40 96 96 <br />1.10 GPS Report 64 36 40 140 140 <br />1.11 Utility Potholing 8 4 12 12 <br />1.12 Lane Closure Report 2 4 6 16 45 61 67 <br />Subtotal Task 1 206 206 144 208 40 804 32 136 176 344 26 69 4C 135 1,283 <br />Task 2. Survey. R/W Engineering <br />2.1 Field Survey for Design 8 48 12 12 240 320 320 <br />2.2 Right of Way Engineering <br />a) Hardcopy Maps 48 120 144 80 392 392 <br />b) Appraisal Maps 36 96 96 228 228 <br />c) Field Surveys for Controls 16 36 80 132 132 <br />Subtotal Task 2 108 300 12 252 400 1,072 1,072 <br />Task 3. Preliminary 35% Design <br />3.1 Line Drawings <br />a) TitiefTypical Sections 2 16 24 40 82 82 <br />b) Layout 8 64 80 120 272 272 <br />c) Drainage 8 24 48 56 136 136 <br />d) Pavement Delineation 2 16 24 48 90 90 <br />e) Signing 2 16 16 40 74 74 <br />f) Signals/Lighting Concept 12 40 64 116 116 <br />g) Landscape & Irrigation 32 32 8C 144 144 <br />Subtotal Task 3 22 136 192 304 654 32 32 80 144 12 40 64 116 914 <br /> <br />Page 1 of 4 <br />