My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-03-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:30 AM
Creation date
6/28/2005 12:06:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/27/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'3k-t ~ <br /> <br />"I am aware of the provisions of Section 3700 of the Labor Code which requires every <br /> <br />employer to be insured against liability for workers' compensation or to undertake self- <br /> <br />insurance in accordance with the provisions of that Code, and I will comply with such <br /> <br />provisions before commencing the performance of the work of this contract." <br /> <br />(i) <br /> <br />In accordance with the provisions of Section 1727 of the California Labor <br /> <br />Code, City, before making payment to Contractor of money due under a contract for public <br /> <br />works, shall withhold and retain therefrom all amounts which have been forfeited pursuant <br />to any stipulation in the contract, and the tenns of Chapter 1, Part 7, Division 2 of the California <br /> <br />Labor Code (commencing with Section 1720). But no sum shall be withheld, retained or <br /> <br />forfeited, except from the final payment, without a full investigation by either the Division of <br /> <br />Labor Law Enforcement or by City. <br /> <br />(j) <br /> <br />Notwithstanding the foregoing, Contractor shall comply with the general wage <br /> <br />determination under the "Davis-Bacon Act" as set out in the U.S. Department of Labor General <br /> <br />Wage Decision No. CA and General Wage Decision Modifications Nos. through and/or general <br />wage detérminations applicable to this work published in the Federal Register pursuant to 29 <br /> <br />CFR, Subtitle A, Part 1, Section 1.5(b); as well as all other requirements of the Davis-Bacon Act. <br />Copies of said General Wage Decision and said Federal Register pages are included herewith. <br /> <br />(k) If there is a difference between- the minimum wage rates predetermined by the <br />Secretary of Labor and the general prevailing wage rates determined by the Director of <br /> <br />the California Department of Industrial Relations for similar classifications of labor, <br />Contractor and its subcontractors shall pay not less than the higher wage rate. City will not <br /> <br />accept lower State wage rates not specifically included in the Federal minimum wage <br />determinations. This includes "helper" (or other classifications based on hours of experience) <br /> <br />or any other classification not appearing in the Federal wage determinations. Where Federal <br />wage determinations do not contain the $tate wage rate determination otherwise available for use <br /> <br />6 <br /> <br />'T-. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.