My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-03-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:30 AM
Creation date
6/28/2005 12:06:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/27/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.3 c.-I <br /> <br />March 27, 2000 <br /> <br />Subject <br />Task Order No.1 with Andrew Leahy, Civil Engineer for Professional Engineering Services: Final <br />Design of Cordilleras Creek Bank Erosion Repair near Industrial Way and Contract closeout. <br /> <br />Recommendation <br />Approve Task Order No.1 with Andrew Leahy for an amount not to exceed $454.00. <br /> <br />Background <br />City Council awarded a contract to Andrew Leahy in June 1999 to complete the final design of the <br />bank repair along Cordilleras Creek near Industrial Way. The scope of the contractincluded six <br />(6) site visits to provide engineering support during construction. However, additional site visits <br />and some construction supervision became necessary because of unforeseen problems at the <br />construction site. The California Conservation Corps (CCC), which was retained to perform the <br />construction work, did not provide an adequate number of experienced crew members required <br />for the job. Its crews statewide were called away to respond to the many forest fires that plagued <br />the State in the early fall. Further, the construction site proved difficult to manage because the <br />high ground water level frequently caused flooding during excavation, requiring constant de- <br />watering of the site with small pumps. The periodic surges of high tides impacted the site, often <br />seeping through the site's channel diversion pipe and sandbag wall. Changes to the design had <br />to be made in the field. These circumstances required the engineer to spend more hours in the <br />field, and to write follow-up inspection and progress reports on the work as it proceeded to <br />document the changing conditions. Most of these costs were covered by the contingency funds <br />with the exception of $137.14. Additionally, Mr. Leahy's subconsultant, LSA Associates <br />purchased the native plant materials required by the Fish & Game permit. Because the plants <br />had to be collected from several different locations around the Bay Area, the City asked the <br />consultant to get them and bring them to the project site. The costs were charged to the <br />subconsultant and are an eligible reimbursable expense. The cost of the plants is $315.99. The <br />total amount over the contract and the final payment is $453.13, a 2.6% increase over the original <br />contract amount. With this final payment, the contract can be closed out. The total adjusted <br />contract value will be $17,622.13. <br /> <br />Fiscal Impact <br />The funds are available in the approved FY 98/99 Cordilleras Creek CIP project to cover the task <br />order amount. Total project will come in at or belo the budget. ræ~ <br /> <br /> <br />Peter Ingram d Everett " <br />Public Works Services irector City Manager <br /> <br /> <br /> <br />Attachment <br />1) Task Order No.1 <br /> <br />""T-"~' , <br />
The URL can be used to link to this page
Your browser does not support the video tag.