Laserfiche WebLink
3 �: 30 <br /> . <br /> EXFi�IT ��A" <br /> TABI.E 1 . <br /> TRAF'FIC IlVII'ACT NIITIGATION FEE PROJECTS <br /> . Co�t <br /> �roject Pablic FacWty Impcov� (incl R/W) <br /> Intersxdon Im roveme� <br /> Camino Iteal/Whi le Add w�eatboimd free ' t aan aad lane SZ00, <br /> e ' le eastbound ri t aan laae 54�13,24 <br /> eaersas/Middle5eld � Install traffia si 5175, <br /> Camino ReaUBeech-L.iacoln Mediaa cloaiaz 530. <br /> ay/f�h Install Qaffic si 5130, <br /> ,riont laoenedi�s (4l �P� � � <br /> nbl;otal S1,OOB,21 <br /> nidur and AreawWe Im rnvemenb <br /> oodside Road (El Camino W US 101) Widen to 6laaes S2,400 <br /> oodside Road (F1 C.amiao to west of Valota) Widea to 6laaea, medisa closiaea S1,S59 <br /> 1 ' Road E.xccnaion F.�tead to F.aat Bayshote, bzi Redwood Cixk 57,067, <br /> etasns Boulevsrd Riiden to 4 lanes bet Chesmut and Woodside 5280.1 <br /> Bayshote Roed Widen eotnh a� Whipple Ave. 5650, <br /> eighborbood Traffic Maopgemeat Pro�amt Alleviate ctu th�vugh ttaffic and spxdim� 5890, <br /> nbtotal ' 512,846,1 <br /> ti�e Modearl'c�neit <br /> arions Traasit and TDM Meaaur S3,?SO . <br /> abtotal 53,250. <br /> dministcative Casb <br /> 'on of TraPSc M��'�'an Fa Smdy $90, <br /> ty Adminisuative C,osts (296) 5343.888 ' <br /> , abtotd <br /> Total 517,536,291 <br />