My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-05-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:38 AM
Creation date
6/28/2005 2:44:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/8/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r¡c,-I <br /> <br /> <br />May 8,2000 <br /> <br />Subject <br />Fiscal Year 2000-2001 Cost Shared Sidewalk Repair Project <br /> <br />Recommendation <br />By resolution, approve specifications and authorize the call for bids for the 2000-2001 Cost <br />Shared Sidewalk Repair Project <br /> <br />Background <br />Staff has prepared the contract documents and specifications for the next annual Cost <br />Shared Sidewalk Repair Project. The cost shared sidewalk repair project enables the City <br />to offer cost-shared repairs citywide and the prompt construction of wheel chair ramp at <br />needed locations. The Cost Shared project is approaching tree preservation based on the <br />Tree Policy Task Force recommendations. There will be continuing opportunities for <br />testing options and developing costs for different repair options during the cost shared <br />repairs. <br /> <br />The cost-shared repairs have been well received by property owners. The project has <br />been effective repairing damaged sidewalks outside of the annual Tree Preservation and <br />Sidewalk Repair Program project area. The cost shared sidewalk repairs are available to <br />any property owner with damaged sidewalk, driveway approach or curb adjacent to their <br />property. The contract will be available to property owners for 12 months or until the total <br />contract amount is reached. <br /> <br />The 1999-00 Cost-Shared Sidewalk Repair Project contract bid was $127,750.00 and will <br />close out at approximately $151,000 as the final repairs have been completed il'1 March <br />2000. . The original contract price was exceeded in January 2000. The cost shared <br />response received from the property owners was an acceptance rate of around 25%. Staff <br />did not return any checks received prior to a selected cut-off date in January. There <br />currently is a waiting list of twenty-five property owners for cost shared repairs that staff <br />will process once the new project bids are received. <br /> <br />The 2000-2001 contract amount will be approximately $180,000, depending on the actual <br />bid prices received. The project will include sidewalk, curb and gutter, driveway approach <br />and wheelchair ramp construction. The City's estimated share of the project is projected <br />to be $115,000. The cost-shared reimbursement estimated to be received from property <br />owners is projected to be $65,000. The higher amount of the City's share is due to the <br />inclusion of the wheel chair ramp construction and root pruning costs, which are normally <br />not charged to the adjacent property owner. This project is larger due to previous demand. <br /> <br />GM/WordiCouncil reportslcssidewalklOOAward <br /> <br />Page 1 of 2 <br /> <br />r- <br />
The URL can be used to link to this page
Your browser does not support the video tag.