My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-05-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:38 AM
Creation date
6/28/2005 2:44:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/8/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'1 D.I <br /> <br />REPaIR...,.. <br /> <br />To the Honorable Mayor and City Council <br />F róm the CitY' Manager <br /> <br />May 8, 2000 <br /> <br />Subject <br />Advertisement for Bids - Stulsaft Park Play Area Renovation <br />Engineering File No. 1302-02 <br /> <br />Recommendation , <br />Adopt a resolution approving the Contract Documents entitled, "Contract Documents for <br />Stulsaft Park Play Area Renovation," and authorize the advertisement for bids. <br /> <br />Background <br />The design of the Stulsaft Park Play Area Renovation has been completed, and the <br />contract documents are ready for advertisement. <br /> <br />The 0.6 acre play area is located in the existing Stulsaft Park along Farm Hill <br />Boulevard. The new play equipment in the park includes: <br /> <br />. composite play structure <br />. water play structure <br />. embankment slide <br />. swings <br />. seesaw snake <br />. water basins <br />. drop shot/Funnel ball <br /> <br />. benches <br />. picnic tables <br />. spring ring <br />. synthetic safety surfacing <br />. landscaping <br />. irrigation system <br />. underground utilities <br />. sand-based lawn <br /> <br />A stone-faced ramp with guardrails will connect the two-level park. The existing <br />sidewalk along Farm Hill Boulevard will also be relocated to enhance safety/protection <br />of the street parking. <br /> <br />Per the recommendation in the Soil Investigation Report, a certified Industrial ,Hygienist <br />will be hired to prepare a Site and Safety Health Plan for the proposed construction. <br />All excavated soil will be moved to a designated fill area in the park, and not used for <br />backfill. The area to accept the excavated soil will be hydroseeded upon the <br />completion of the park renovation. <br /> <br />The Architect's Estimate for this project is $496,000. <br /> <br />,-",,-, " "T-"-' <br />
The URL can be used to link to this page
Your browser does not support the video tag.