My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-06-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:44 AM
Creation date
6/28/2005 3:35:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/12/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~o\-\\ <br /> <br />Manager, Engineering and Construction entitled, "Improvement Plans for Pacific Shores <br /> <br />Center", and (d) those certain revised specifications entitled, "Engineering Standards for the <br /> <br />City of Redwood City", adopted January 5, 1998, for a more particular description of the work <br /> <br />and Improvements generally described in this Agreement. <br /> <br />Said final map, plans and <br /> <br />specifications referenced in this paragraph are hereby incorporated herein and made a part of <br /> <br />this Agreement. Upon completion of the aforementioned work, and prior to the release of any <br /> <br />security required herein, Owner shall furnish City with a complete set of plans and drawings <br /> <br />showing the Improvements in their actual or "as-built" condition and location. <br /> <br />8. <br /> <br />GUARANTEE OF WORKMANSHIP AND MATERIALS. <br /> <br />Owner agrees that if, <br /> <br />within a period of one (1) year after final acceptance of any work done under this Agreement, <br /> <br />the improvements furnished and/or installed or constructed or caused to be constructed by <br /> <br />Owner, or any of the work done under this Agreement, fails to fulfill any of the requirements of <br /> <br />this Agreement, or the plans and specifications referenced herein, Owner shall upon receipt of <br /> <br />a request in writing from City directing the work to be done, without delay and without any cost <br /> <br />to City, repair or replace or reconstruct any defective or otherwise unsatisfactory part or parts of <br /> <br />the Improvements or work. Should Owner fail to act promptly to make such repair, replacement <br /> <br />or reconstruction, or otherwise to act in accordance with this requirement to repair, replace or <br /> <br />reconstruct, or should the exigencies of the case require that repair, replacement or <br /> <br />reconstruction be made before Owner can be notified, the City may, at its option, make the <br /> <br />necessary repair, replacement or reconstruction or perform the necessary work and Owner <br /> <br />shall pay the City the actual cost of thereof plus fifteen percent (15%). <br /> <br />Notwithstanding any provisions to the contrary as set forth in this Agreement, Owner <br /> <br />shall not be responsible for repair, replacement, or reconstruction of any Improvements, <br /> <br />-6- <br /> <br />SH/RWC/Council <br />Agmt.360 <br />06/05/00 <br />FXS/fs <br /> <br />-~-'T- <br />
The URL can be used to link to this page
Your browser does not support the video tag.