My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-06-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:44 AM
Creation date
6/28/2005 3:35:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/12/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />qPi,-ß <br />Redwood City, such policy shall contain the standard form of cross liability or <br /> <br />severability of interest endorsement. Such insurance shall also specifically insure any <br /> <br />contractual liability assumed by Owner under the terms of this Agreement, including, but <br /> <br />not limited to, the provisions of paragraph 1 above. <br /> <br />5. Ownership of Improvements. It is agreed that title and ownership of all <br /> <br />Improvements constructed for the benefit of City hereunder by Owner shall vest <br /> <br />absolutely in City upon completion and acceptance of such Improvements by City. <br /> <br />6. Work Subiect to Approval. All work provided for in this Agreement and <br /> <br />more specifically described in the plans and specifications herein referenced shall be <br /> <br />subject to the approval and acceptance by the Manager, Engineering and Construction <br /> <br />before the release of any security required herein. Reference is hereby made to (a) <br /> <br />those certain revised specifications entitled, "Engineering Standards of the City of <br /> <br />Redwood City", adopted January 5, 1998, and (b) those certain plans on file in the office <br /> <br />of the Manager, Engineering and Construction entitled, "Improvement Plans for Seaport <br /> <br />Boulevard," and in accordance with and as provided for in those certain specifications <br /> <br />entitled, "Supplemental Specifications for Civil/Landscape/Irrigation Improvements," for a <br /> <br />more particular description of the work and Improvements generally described in this <br /> <br />Agreement. Said plans and specifications referenced in this paragraph are hereby <br /> <br />incorporated herein and made a part of this Agreement. <br /> <br />Upon completion of the <br /> <br />aforementioned work, and prior to the release of any security required herein, Owner <br /> <br />shall furnish City with a complete set of plans and drawings showing the Improvements <br /> <br />in their actual or "as built" condition and location. <br /> <br />7. Guarantee of Workmanship and Materials. Owner agrees that if, within a <br /> <br />period of one (1) year after final acceptance of any work done under this Agreement, the <br /> <br />5 <br /> <br />SHIRWC/Council <br />Agmt-361 <br />06/05/00 <br />FXSIfs <br />
The URL can be used to link to this page
Your browser does not support the video tag.