My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-06-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-06-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2005 11:18:47 AM
Creation date
6/28/2005 3:51:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/26/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />vv -~ vv .~~ ~~.~, r~~ ..v ,00 8V.C <br /> <br />540 Price Avenue <br />. Redwood City, CA 94063 <br />8~Q..482.s300, 650-482-6399 Fax <br /> <br />;.:.>U~ ~J.~.t.r~_......::\lrI <br /> <br />:¿ ÚUJ <br />BKF JOe NO. 970OS5-20 <br />Estimate Date: 6115/00 <br />Project Principal: Max Keech <br />Project Manager: Dan Schaefer <br /> <br />{ps- \0 <br /> <br />EXHIBIT A <br />Description of Improvements Subject to Reimbursement <br /> <br />ITEM! DESCRIPTION. . UNITPRlCEj QUANTfTY' UNITeSTlMATED AMOUNT. <br />DSMOLfTlON <br />1 S8WCUtfRemOVelDispose AC Pavement 2.00 30,SOO 51= 61,000 <br />2 Remo". & Dispoæ Concrete Sidewalk 3.00 S,BðO SF 17,550 <br />3 Remove & Dispose Concrete Pavement 4.00 1,060 SF 4,200 <br />4 RSITlOVa & Dispose Curb & Gutter 5.00 1,460 LF S.760 <br />5 Remove & Dispose Tree (under e- diameter) 350.00 5 EA 1,750 <br />6 Remove/DiS)OM Prop~ Una Chain Lir1k Fence 2.~O 660 LF 1,650 <br />7 Install Temporary Barricade on Franklin Street 1,000.00 1 EA 1,000 <br />S AbandOn & Remove Existing Utilities 15,000.00 1 L5 15,000 <br />DEMOUTION SUB-TOTAL 110.910 <br /> <br /> TOtAL DEMOLITION L $110,810' <br /> <br />SEWER <br />1 Connect to Existing Sanitary Sewer System 100.00 2 EA 1.400 <br />2 S" PVC Sanitary Sewer - Stubs for Future Laterais 50.00 168 LF 8,400 <br />3 Sanitary $ewer Manhole 3,000.00 2 EA 6,000 <br />S~R SUB-TOTAL 15.800 <br />WA TER <br />,1 Connect to Existing Water Main 1,500.00 3 EA 4.500 <br />2 6" PVC Hydrant Runs 40.00 1Se LF 5,600 <br />3 8" PVC Water Une so. 00 80 LF 4,000 <br />4 12" PVC Water Line 75.00 37 LF 2,775 <br />5 Fire Hydrant Assembly 5,000.00 4 EA 20.000 <br />6 Water Line rlsting & SteriliZation 2.25 282 LF 535 <br />7 Cathodic Protection 2.000.00 1 LS 2,000 <br />WATER SUB-TOTAL 40,510 <br />STORM DRAIN <br />1 12" RCP Storm Drain - Class III 45.00 206 LF 9.270 <br />2 12" Outfall to Existing Channe' 1.000.00 2 EA 2.000 <br />3 42" RCP Storm Drain - ClaN IJ 165.00 158 LF 27,720 <br />4 42" Outfall to Existing Chaon" 3.000.00 1 eA 3,000 <br />5 Storm Drain Catch Basin 2,500.00 8 EA 20,000 <br />(5 Storm Drain Manhole 3,000.00 1 EA 3.000 <br />STORM DRAIN SU~TOTAL 64,990 <br /> <br />RECONSTRUCTION OF MAPLE STREET <br /> <br />K:\MAIN\870095 .2O\ESTI~ TES\08 t 500-ExhibitA.x. <br /> <br />M8p1e Street-lAC <br /> <br />Page, fA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.