My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 8:42:53 AM
Creation date
6/28/2005 4:29:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/14/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IOa=��1 <br /> (d) If any portions of any previously activated line of the Fiber Optic <br /> Network Facilities covered under this Agreement are no longer used by RCN, or <br /> are abandoned for a continuous period in excess of six (6) months, RCN shall <br /> notify City and shall either promptly vacate or remove the facilities at its own <br /> expense or, at City's discretion, may be allowed to abandon some or all of the <br /> facilities in place. If RCN is permitted by City to abandon its facilities in place, any <br /> such abandoned facilities shall be deemed conveyed to City and RCN shall have <br /> no further obligation to remove, relocate or maintain said facilities, except as <br /> provided in Section 18 hereinafter. Unless specifically permitted by City in writing, <br /> which permission shall not be unreasonably withheld or delayed, all boxes or other <br /> facilities exposed to the surface will be required to be removed and the surface <br /> restored. <br /> (e) When removal or relocation is required under the Agreement, RCN <br /> shall, after the removal or relocation of the Fiber Optic Network Facilities, at its <br /> own cost, repair and return the Public Right-of-Way on which the facilities were <br /> located to a safe and satisfactory condition in accordance with the construction- <br /> related conditions and specifications as established by City according to its <br /> standard practice. Should RCN remove the Fiber Optic Network Facilities from the <br /> Public Right-of-way, RCN shall, within ten (10) Days after such removal, give <br /> written notice thereof to City specifying the right-of-way affected and the location <br /> thereof as well as the date of removal. Before proceeding with removal or <br /> Aemt-374 <br /> Sh/RWGCouncil - 14 - <br /> F7iS/fs <br /> 08/021(� <br /> _ . _ .. . _ ._,._ _ r <br />
The URL can be used to link to this page
Your browser does not support the video tag.