My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 8:42:53 AM
Creation date
6/28/2005 4:29:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/14/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IOA- � � <br /> and to the approval of City. Any trenching within streets shall be repaved within <br /> ten (10) calendar days. <br /> Any premature deterioration of the surface or subsurface improvements as <br /> determined by City shall be the responsibility of RCN to the extent attributable to <br /> RCN's activities. This responsibility shall survive this Agreement and shall extend <br /> either for (i) a period of two (2) years following RCN's abandonment of RCN's most <br /> recent installation of, or improvements on, the Facilities; or (ii) the date of <br /> completion of the Facilities, which will be constructed and installed by RCN upon <br /> approval of this Agreement by City, as opposed to the construction and installation <br /> of additional Facilities that may be constructed or installed at a later date, <br /> whichever occurs last. RCN shall immediately on written notice from the City <br /> commence and thereafter diligently and continually cause all necessary repairs to <br /> be completed; however, under no circumstances may the period of time to <br /> complete all necessary repairs exceed ninety (90) days or such longer period of <br /> time as may be reasonably required to complete the same in the event of <br /> circumstances such as Act of God, Force Majeure, strike or to the extent the <br /> circumstances prevent the completion of the repairs. In the event the repairs are <br /> not made, the City shall make repairs with the cost being billed to RCN. <br /> (b) If Public Right-of-Way to be used by RCN has preexisting installation(s), <br /> RCN shall assume the responsibility to verify the location of the preexisting <br /> installation and notify City of RCN's proposed installation. City will endeavor to <br /> A�mt-374 <br /> Sh/RWGCouncil - l9 - <br /> FXS/fs <br /> 08/02/b0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.