My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 8:42:53 AM
Creation date
6/28/2005 4:29:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/14/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�1.�r9 <br /> EXHIBIT "C" <br /> SCOPE OF WORK: ROUTE 101/R.ALSTON AVE INTERCHANGE <br /> MODIFICATIONS PS&E <br /> Mark Thomas & Co. Inc. will perform all tasks in accordance with the City of Belmont <br /> requirements and will follow Caltrans and regulatory agency procedures. All work <br /> reports and documents subject to review and approval of Caltrans will follow Caltrans' <br /> current policies, guidelines, and procedures. <br /> The basis of the desi�n for the proposed improvements of the Route 101/Ralston Avenue <br /> Interchan�e will be the Caltrans approved Project Study Report in December 1999. It is <br /> assumed that the PS&E will be developed only for Alternative l, the City preferred <br /> alternative with a direct connecrion to Island Park. The plans, specifications and estimate <br /> (PS&E) will be submitted for concurrent review by the Cities of Belmont and Redwood <br /> City and Caltrans at the 35%, 65%, 95% and 100% level. Included during this phase of <br /> work are the design surveys, geotechnical investigation and reports, right of way <br /> engineering, aerially deposited lead testing and report, Phase II testing for hazardous <br /> materials, potholing and locating existin� underground utilities, and coordination with <br /> utility companies for utility relocations. <br /> It is assumed that the digital aerial photogranunetric mapping prepared for the Route 101 <br /> auxiliary lane projects has been approved by Caltrans and Parts A, B and C have been <br /> submitted and no additional work is required under this contract. <br /> TASK 1 <br /> 1.1 Projeci Management <br /> MTCo will attend monthly meetings as necessary with the City and Caltrans in order to <br /> maintain the project schedule, identify trends and issues, seek resolution of design issues, <br /> and verify that the plans are in conformance with Caltrans standard design practices. <br /> This task includes the preparation of trends meeting agenda, meeting minutes, <br /> coordination of the desi�n effort with LITCo's subconsultants, preparation and updating <br /> CPM schedule, monthly proaress reports, and meetings. <br /> �.2 Data Gatliering & Field Review <br /> This task includes �atherina existin� data and "as-built" drawings from Caltrans and local <br /> agencies. Field visits will be made to verify existin� conditions in comparison with <br /> planimetric mapping, record information, and utility system maps. <br /> 1.3 Lane Closure Report <br /> A Draft Lane Closure Report will be prepared and submitted to Caltrans for review. <br /> Comments will be incorporated and a Final report submitted to Caltrans for approval. It <br /> City of Belmont — Route 101/Ralston .4ve IC .Ylodifieations 07/06/00 <br /> Proposal — PS&E <br /> 1 <br /> .-. _ . __. T <br />
The URL can be used to link to this page
Your browser does not support the video tag.