My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-12 0092 PC Reso 929 Main St. 10.03.17
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-12 0092 PC Reso 929 Main St. 10.03.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 12:19:42 PM
Creation date
10/24/2017 12:18:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
39. Cross -Connection Control Test - Prior to issuance of the certificate of <br />occupancy, all applicable plumbing systems must pass a cross -connection <br />control test, performed by a Cross -Connection Control Specialist Certified <br />through the CA -NV Section of the AWWA and observed by Public Works staff. <br />The cross -connection control test method must be included in the Recycled <br />Water Report. The applicant is responsible for all fees associated with the <br />performance of the cross -connection control test. [COA] [ENGINEERING] <br />40. Backflow Protection — Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, <br />accessible to the Public Works division for testing. [COA][ENGINEERING] <br />41. Fire Flow - The Project shall meet fire flow requirements as established by the <br />Fire Department which are based on the Fire Code. Fire flow tests are typically <br />performed during the preliminary design phase but must be completed prior to <br />submittal of final design. Applicant shall contact the Fire Department for fire flow <br />requirements, and then submit a written fire flow test request to Engineering. <br />[COA][ENGINEERING] <br />42. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). <br />BMP plan sheets are available electronically for inserting into project plans. <br />Sf DRJ[ENGINEERING] <br />Street Infrastructure Improvements <br />43. Repair or Replace Street Infrastructure - Restore streets surrounding the project <br />site to the satisfaction of the City Engineer at project completion. When this <br />requires additional pavement restoration, the Engineer shall approve the preferred <br />layout of pavement markings. [SDR][ENGINEERING] <br />44. Streetlights - A new streetlight shall be installed, if needed, as determined by the <br />City Engineer. [SDRI[ENGINEERING] <br />45. Reconstruction of Frontage Streets - The City has identified the need for street <br />reconstruction along Main and Maple streets fronting the project site. <br />S[ DRI[ENGINEERING] <br />Fire and Safetv <br />46. Radio Coverage for Emergency Responders — All building and parking <br />garages shall have approved radio coverage for emergency responders within <br />the building. Upon completion of the building construction, a radio coverage test <br />shall be conducted per the applicable codes and standards and if the test fails an <br />Emergency Responders Radio Coverage System shall be installed. Verify any <br />Page 11 of 17 <br />ATTY/RESO.0092/PC RESO 929 MAIN ST. <br />REV: 10-04-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.