My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-12 0092 PC Reso 929 Main St. 10.03.17
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-12 0092 PC Reso 929 Main St. 10.03.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 12:19:42 PM
Creation date
10/24/2017 12:18:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
requirements for construction and site work. The applicant shall arrange for <br />the attendance of the owner, developer, construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. <br />c. Interior Finishes & Amenities - After sheetrock inspection but prior to <br />installation, contact the Project Planner and Housing Staff to verify, to the <br />City's satisfaction, that all interior finishes and amenities in the affordable <br />units are equivalent to amenities used in market rate units. <br />53. Construction Noise — The applicant shall comply with the following construction - <br />period noise abatement measures: [SDR][BUILDING] <br />a. Construction Plan. Prepare a detailed construction plan identifying the <br />schedule for major noise -generating construction activities. The <br />construction plan shall identify a procedure for coordination with nearby <br />noise -sensitive facilities so that construction activities and the event <br />schedule can be scheduled to minimize noise disturbance. This plan shall <br />be provided to all noise -sensitive land uses within 500 feet of the <br />construction site. <br />b. Construction Equipment Mufflers and Maintenance. Equip all internal <br />combustion engine -driven equipment with intake and exhaust mufflers that <br />are in good condition and appropriate for the equipment. <br />c. Equipment Locations. Locate stationary noise -generating equipment <br />required on construction project sites as far as possible from sensitive <br />receptors when sensitive receptors adjoin or are near a construction project <br />site. <br />d. Quiet Equipment Selection. Use quiet construction equipment, particularly <br />air compressors, wherever feasible. <br />e. Temporary Barriers. Construct solid plywood fences around construction <br />sites adjacent to residences, operational businesses, or noise -sensitive <br />land uses. <br />f. Temporary Noise Blankets. Temporary noise control blanket barriers should <br />be erected along building facades of construction sites to attenuate noise <br />from elevated activities if noise conflicts cannot be resolved by scheduling. <br />(Noise control blanket barriers can be rented and quickly erected.) <br />g. Noise Disturbance Coordinator. For projects that would last over one year <br />in duration, the City may choose to require project designation of a "Noise <br />Disturbance Coordinator" who would be responsible for responding to any <br />Page 13 of 17 <br />ATTY/RESO.0092/PC RESO 929 MAIN ST. <br />REV: 10-04-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.